Commercial and project electrical work in Berkshire
Adtec Electrical Services Ltd covers Berkshire enquiries from Lyford, with the emphasis on commercial premises, planned installations and building projects.
Short answer
Do you cover Berkshire? Yes, particularly Newbury, Reading and West Berkshire for commercial and project work. Commercial travel is generally within about 35 miles of Lyford, while domestic work is normally closer to Wantage, so please check your address and project scope with us first.
Coverage from Lyford into Berkshire
Newbury is approximately 20 miles south of our Lyford office, with the route depending on the site and road conditions. It is a useful reference point for enquiries across West Berkshire, where business parks, workshops and rural properties sit alongside established residential areas. Planned visits work best when the scope and access requirements are clear beforehand.
Reading lies further east, roughly 25 miles from Lyford as an initial geographical guide rather than a road-mileage promise. The actual journey depends on the route, traffic and final address. We assess enquiries individually rather than treating the whole county as one travel zone, particularly where a job would require several separate visits.
The balance here is different from our immediate home area. A commercial refurbishment or coordinated building project may suit the journey well, while a single minor household repair may not. Tell us what needs doing and when; we can discuss suitability without implying that every Berkshire postcode has the same availability.
Electrical work for offices and industrial premises
Adapting an existing workplace
Newbury has business park offices, industrial premises around transport corridors and commercial space at Greenham Business Park. A change of occupier can mean a different desk layout, additional machinery or a workshop replacing storage space. The electrical design needs to follow that intended use, not simply repeat the previous tenant’s arrangement.
Our commercial electrical services include additional power, lighting alterations and distribution work. For larger equipment, three-phase supplies and distribution boards need checking against demand and the existing installation. Sound circuits and containment may be reusable, but that decision follows assessment rather than an assumption based on appearance.
Reading’s office buildings and M4-corridor business premises often need power and communications planned together. We install data cabling and patch panels, with active IT equipment installed by an IT team. If a separate IT contractor is needed, Adtec can subcontract that part, with responsibilities agreed before installation begins.
Want a fixed written quote? Call 01235 430442 or send us the details.
Fit-outs, homes and construction programmes
Town-centre retail and hospitality spaces need lighting and equipment connections suited to the trading layout. Our shop fit-out work includes quick-turnaround projects, but access, supply capacity and decisions about fittings still need settling early. A target opening date is useful information, not a substitute for checking what the existing installation can support.
Larger domestic and builder-led work
Housing includes older terraces near town centres, inter-war and post-war suburbs, newer estates and converted properties. Wiring may have been changed several times even where the building retains its original character. For larger projects, domestic electrical work can include rewiring and consumer unit alterations, subject to an assessment of the existing circuits.
Our work with builders and developers can bring electrical planning into an extension or refurbishment before construction gets too far ahead. Confirm kitchen equipment, room layouts and any external supplies before first fix. Grouping decisions and access sensibly helps avoid repeated disruption and makes the sequence of subsequent visits easier to plan.
When to call a professional
Get electrical advice before signing off a unit layout that adds machinery, a commercial kitchen or substantial extra office equipment. The incoming supply and protective arrangements may limit the proposal. A site inspection is also sensible where circuit labels are unclear or nobody can locate the records for previous alterations.
Burning smells, heat damage and persistent trips should not be left until a planned refurbishment. Stop using the affected equipment and arrange investigation. For an overview of installation condition, testing and certification includes commercial EICRs; an inspection report is different from the certificate issued for new installation work.
For a Berkshire enquiry, contact Adtec with the site postcode, intended use, available drawings and proposed dates so we can discuss the work and the practicality of the location.

See every county we cover on our areas we cover page, or browse our work.
Want a fixed written quote? Call 01235 430442 or send us the details.
