Skip to content
Adtec Electrical Services

Lighting Installation: Downlights, Spotlights & Fittings

New lighting for kitchens, hallways, bathrooms and living rooms, fitted neatly and certified.

Good lighting changes how a room feels and how well it works. A kitchen with a single central light leaves you in your own shadow at the worktop. A hallway with one pendant is gloomy on the stairs. Adtec Electrical installs downlights, spotlights, pendants and feature lighting for homeowners and landlords across Oxfordshire and surrounding counties.

Downlights and spotlights

Recessed downlights give an even, uncluttered light and suit kitchens, bathrooms, hallways and extensions. Surface spotlights and track are useful where a ceiling can't be cut, or where you want to aim light at a picture or a worktop. We set out the positions with you, checking joist directions and anything in the void, so the lights line up and avoid pipes and cables.

Open-plan kitchen with new recessed and pendant lighting after a refurbishmentHallway and staircase with new downlights

Fire-rated fittings in general terms

A plasterboard ceiling often forms part of a building's fire protection, for example below a bedroom, a loft room or another flat. Cutting holes for downlights can let fire through faster. In those ceilings fire-rated downlights are used, which seal the opening if exposed to fire. We check which ceilings need them before choosing fittings. Insulation in a loft above also affects which fittings suit.

Dimmers and LED compatibility

Almost all new lighting is LED, and LEDs are fussy about dimmers. Old dimmers can make lamps flicker, buzz or fail to switch fully off. We fit dimmers matched to the load and lamps that are labelled dimmable, and keep the total within what the dimmer is rated for. If you have smart lighting in mind, tell us early so the right switches and boxes go in.

Bathrooms and zones

Bathrooms are split into zones around the bath and shower, and each needs fittings with a suitable protection rating against water. Extractor fans, shaver points and mirror lights follow the same thinking. We choose and position fittings to suit, with RCD protection on the circuit.

Pendants, feature lights and moving switches

Swapping a fitting for a heavier pendant or chandelier may need a stronger fixing in the ceiling. Moving a switch, adding a two-way switch on a landing or putting a light where there wasn't one usually means a short chase or lifting boards. We explain the route first and leave it ready for filling and decorating.

Refurbished room with a new pendant light and second-fix wiring

Sockets and outdoor lights

Planning your lighting

Before choosing fittings, think about what each room is used for. A kitchen needs bright, even light over the worktops and something softer for eating. A living room benefits from several sources on separate switches or dimmers so you can change the mood. Hallways and stairs need light at the top and bottom, ideally with switches at both ends. Bedrooms often want bedside switching. If you are unsure, we can walk round with you and suggest a layout, then put the positions in writing with the quote so everyone knows what is being installed and where.

Smart lighting and scene control are increasingly popular. Some systems use smart lamps that work with ordinary switches, others replace the switches themselves and need a neutral conductor at the switch box, which many older homes lack. If you are planning smart controls, tell us which system you have in mind so the wiring at each switch suits it.

For more power points rather than lights, see our page on extra sockets. Lights outside the house are covered on outdoor lighting, and a full refit is covered on kitchen electrics. Every job is tested and certified. We work Monday to Friday, 7:30am to 5:30pm; see the areas we cover or call 01235 430442.

Frequently asked questions

Many older dimmers were designed for filament bulbs and don't control LEDs smoothly. Fitting an LED-compatible dimmer and dimmable lamps usually solves it.

Cutting a hole in a ceiling can weaken its fire resistance, so in some ceilings, such as under a bedroom or between flats, fire-rated downlights are needed. We check before fitting.

Yes. Bathrooms are divided into zones and each zone needs fittings with a suitable water protection rating. We choose fittings that suit where they will sit.

Usually. A new switch position often means lifting a floorboard or a short chase, which we explain before starting.

Of course. Send us the make and model and we will check they suit the location, or we can suggest options.

Related pages

CallQuote