Skip to content
Adtec Electrical Services

EV Charger Installation for Homes & Businesses

Electric vehicle chargers fitted after a proper look at the supply they are going to depend on.

An electric vehicle charger is one of the biggest continuous loads a home or small business can add. It may draw a high current for hours at a time, often overnight while the heating or a dishwasher is also running. Fitting one is straightforward when the supply is ready for it and awkward when it isn't. That is why every job we take on starts with a survey.

Surveying the supply and consumer unit

We look at the incoming supply, the main fuse rating, the meter position and the consumer unit. Is there a spare way? Does the board offer the right protection? Is it in good condition? We also consider what else the property runs, such as electric showers, cooking and heat pumps, to see whether load management is sensible. Sometimes the answer is that the board needs replacing first; our page on consumer unit upgrades explains what that involves.

Planning the cable route

The charger usually goes on an outside wall near where you park, or on a post in a drive or car park. The cable has to get there from the board safely: through the house, along an external wall, or buried in a protected route to a detached garage or post. A shorter, simpler route keeps the job tidy. We agree the position with you before any drilling starts.

Earthing in general terms

Charging outdoors raises particular earthing questions, because a vehicle stands on the ground and is touched by people. Depending on how the property's supply is earthed, the installation may need a charger with built-in protection or a separate earthing arrangement. We assess this during the survey and design the installation to suit, in line with the wiring regulations, BS 7671.

Smart charger requirements

In general, chargers installed at homes and workplaces in Great Britain must meet smart charging regulations: they need to be able to connect to the internet, schedule charging and respond to signals that shift charging away from busy times. Most current home chargers are built to this. If you are buying your own, check it is a compliant smart model.

Workplace chargers

For a business, chargers are usually fed from the building's distribution board, sometimes through a new sub-main. The questions are how many vehicles, how fast, and how the load fits alongside everything else the building uses. Our page on three-phase supplies and distribution boards covers the bigger supply questions that can come up.

Testing and handover

Choosing the position

Think about where the car actually parks, which side the charging socket is on, and whether a tethered cable or a socket suits you better. A charger on the wall nearest the driveway avoids cables trailing across paths. If the drive is shared or the car sits on the road, the options can be limited, and we will tell you honestly. For businesses, chargers close to the building usually mean shorter cable runs, while bays further out may need ducting or a feeder pillar. We mark out positions during the survey so there are no surprises on installation day.

After installation we walk you through the charger's app or settings, show you where its isolator and protective device are, and leave the certificate and manufacturer's paperwork with you. If you later add solar panels or a battery, the charger can often be set to make use of them, and it is worth telling whoever installs them that a charger is already in place.

Once installed, the circuit is tested and certified, and we show you how the charger is switched and isolated. We are based at Lyford near Wantage and work Monday to Friday, 7:30am to 5:30pm. Check the areas we cover, or call 01235 430442 to book a survey.

Frequently asked questions

Not always. It depends on space in the existing board, the protection it offers and its condition. The survey tells us whether a new unit, a separate enclosure or nothing extra is needed.

The distance from the board to the charger, the cable route, whether the consumer unit or earthing needs work, the charger you choose and, for businesses, how many points are installed.

Often, yes, provided it is a suitable smart charger for the location. Tell us the make and model before the survey so we can check it.

A large charging load added to cooking, heating and a shower can be too much for some supplies. Load management, built into many chargers, can limit charging when the house is busy.

Yes. Workplace chargers are planned around the building's distribution board, the parking layout and how many vehicles need to charge.

Related pages

CallQuote