Wiltshire electrical projects focused on Swindon
Adtec Electrical Services Ltd takes on mainly commercial electrical work in Wiltshire, focused on Swindon’s warehouses, distribution premises and industrial units.
Short answer
Do you cover Wiltshire? Yes, our main focus is commercial and industrial work around Swindon, approximately 20 miles south-west of Lyford. Commercial projects are generally within about 35 miles of our base; coverage elsewhere in the county depends on the address and the work proposed.
A practical base for Swindon projects
The A420 provides a route from our Lyford base towards Swindon, although traffic and the final industrial estate affect the journey. The approximate distance is a starting point for planning, not an arrival-time commitment. Give us the actual site entrance and access arrangements rather than relying only on a large estate’s main postcode.
Swindon’s industrial character extends from its railway heritage to the modern employment areas around the town. Locations such as Dorcan and South Marston contain a broad mix of production, storage and trade premises. Access to the M4 also supports distribution activity, where lighting, equipment supplies and dependable electrical distribution are important parts of the working layout.
We do not treat a Wiltshire enquiry as an automatic promise of county-wide attendance for every type of job. Our strongest fit here is planned commercial work that can be properly scoped and coordinated. Domestic enquiries are considered against the size of the work and the distance from our usual household service area near Wantage.
Power and lighting for working industrial buildings
Distribution matched to the operation
A warehouse becoming a workshop may need more than extra sockets. Machinery, loading equipment and workbenches can change the electrical demand and the way circuits should be arranged. Our warehouse and industrial electrical work starts with the proposed use and the condition of the existing installation, including routes for new cables.
We carry out three-phase and distribution board work, alongside power additions and containment. Before equipment positions are fixed, share manufacturers’ electrical requirements and any planned expansion. An unused circuit or space in a board does not establish that sufficient capacity is available for another machine or a new operational area.
Lighting for the actual floor layout
Tall storage racks, open production areas and packing benches need different lighting arrangements. Our warehouse lighting service can include replacement fittings and revised layouts. Consider aisle positions, access for maintenance and the way daylight changes across the building. Lighting should be assessed against the tasks performed rather than selected solely by the number of existing fittings.
Want a fixed written quote? Call 01235 430442 or send us the details.
Coordinating installation with people and site activity
Electrical work in an occupied distribution building needs agreement about vehicle movements, working areas and any interruption to equipment. Discuss the site’s operating pattern early so a realistic sequence can be proposed. Do not assume that keeping most of a unit open means every circuit can remain live while alterations take place.
For an office area inside a larger unit, commercial electrical installations can combine desk power and lighting changes with data cabling. Adtec installs cabling and patch panels; IT equipment is fitted by an IT team, which can be subcontracted. Identifying that boundary early helps everyone understand what will be ready at handover.
We also work with builders and developers on alterations and fit-outs. Swindon’s housing stock includes older terraces, post-war estates and modern suburbs, so larger residential projects can involve very different existing installations. See our domestic electrical services for the types of work available, and check the suitability of a particular address before making programme assumptions.
When to call an electrician
Seek advice before taking on a unit whose electrical history is unknown, moving machinery or changing the storage layout around existing lighting. An early review can identify missing information and highlight where testing or design work is needed. It is easier to resolve these questions before racking, partitions or finished surfaces restrict access.
Visible damage to electrical equipment, overheating or unexplained loss of power needs professional investigation. Keep people away from damaged equipment and do not open distribution boards yourself. Our testing and certification services include commercial condition reports, PAT testing and installation certificates, which serve different purposes and should be selected to match the actual requirement.
To enquire about a Wiltshire project, send Adtec the site details, a description of the operation, the equipment involved and your proposed programme so we can discuss scope and coverage.

See every county we cover on our areas we cover page, or browse our work.
Want a fixed written quote? Call 01235 430442 or send us the details.
