AFDDs and Consumer Unit Upgrades: What You Need to Know
Arc fault detection explained in plain English, and how to decide whether it belongs in your new board.
If you've had a quote for a new consumer unit recently, you may have seen AFDDs listed as an option. They're the newest type of protective device to appear in UK domestic boards, and there's a fair amount of confusion about what they do and whether they're compulsory. This guide sets out the facts so you can make the call with your electrician.
What an AFDD actually does
An arc fault is electricity jumping across a gap where it shouldn't. It can happen inside a cable that's been crushed under a floorboard, pierced by a picture nail or chewed by a rodent, or at a terminal screw that has worked loose over the years. The arc produces intense local heat, enough to char insulation and ignite nearby timber or dust, yet the current involved is often too small to trip a conventional breaker.
That's the gap AFDDs are designed to fill. An MCB reacts to overload and short circuits. An RCD reacts to current leaking to earth, which protects people from shock. Neither is built to spot a series arc on a live conductor. An AFDD continuously analyses the waveform on its circuit and switches it off when it recognises the high-frequency pattern of arcing, while ignoring the normal sparks from switches and plugs.
When are AFDDs required?
BS 7671, the wiring regulations, now recommends AFDDs for single-phase final circuits rated up to 32A. In a small group of building types they move from recommended to required: these include higher-risk residential buildings, houses in multiple occupation, purpose-built student accommodation and care homes. The detail depends on the building and the edition of the regulations in force when the work is designed, so treat this as a summary rather than the full rule.
For an ordinary house or flat, the regulations leave the decision to the designer and the client. There is no rule that an existing board without AFDDs must be changed, and an installation without them is not unsafe simply for that reason. If you're a landlord, it's worth asking about them, because an inspector may note their absence as a recommendation on a condition report.
Which homes benefit most
- Timber-framed houses, older properties with exposed joists, and thatched or converted barns where a fire would spread quickly.
- Homes with older wiring that's been extended and altered many times, where hidden joints are more likely.
- Bedrooms and escape routes, where an early warning matters most to people asleep.
- Rented homes and shared houses, where the owner can't see how cables and appliances are treated day to day.
- Circuits feeding outbuildings, workshops or garden rooms, where cables run through spaces that are rarely checked.
Some people fit AFDDs on every circuit; others choose them for bedroom and socket circuits only. Both are sensible approaches.
Fitting AFDDs as part of a board change
The neatest way to add arc protection is during a full consumer unit upgrade. Most manufacturers now offer combined AFDD and RCBO devices, so each protected circuit gets overload, earth-leakage and arc protection from a single unit. Because these devices are often wider than a standard RCBO, the enclosure has to be sized for them from the start. Squeezing them into a board that was laid out for standard breakers rarely works.
Before the new board goes live, every circuit is tested as normal. AFDDs are particularly good at exposing old, intermittent faults, which is the point of having them, but it means a fault that's been hiding for years may need putting right on the day.
What decides the cost
We don't publish prices because two homes are rarely alike, but the factors are straightforward. The device itself costs noticeably more than a standard RCBO, so the number of circuits you choose to protect is the main driver. Beyond that, the usual board-change factors apply: the size of enclosure needed, the condition of the earthing and bonding, access to the board, and any faults found during testing. Our consumer unit cost guide covers those in more detail.
A useful way to compare quotes is to ask each electrician to price the board with and without AFDDs, and to say which circuits they would protect and why.
Questions to ask before you decide
- Which circuits would you put on AFDDs, and which would you leave on standard RCBOs?
- Will the enclosure have space for AFDDs to be added later if I don't fit them now?
- Do any of my appliances or dimmers have a history of tripping arc devices?
- Does the device show which kind of fault caused a trip?
For a fixed quote, call 01235 430442.
Frequently asked questions
Want a price for your job?
Call 01235 430442 (Monday to Friday, 7:30am to 5:30pm) or send us the details.
