Skip to content
Adtec Electrical Services

Cooker circuit requirements for ovens and induction hobs

A new oven or hob is often bought before anyone has looked at the wiring behind the old one. Whether it can simply be connected, or needs a new circuit first, depends on how much power it draws and what the existing cable and protective device can carry.

Last updated

Short answer

Small single ovens that come with a moulded plug can usually run from a socket. Larger ovens, double ovens, range cookers and almost all induction hobs need to be hard-wired to a dedicated cooker circuit from the consumer unit, with a cooker switch nearby for isolation. The electrician sizes the cable and protective device from the appliance ratings and the cable route under BS 7671. Connecting an appliance to a sound existing circuit is not normally notifiable in England, but installing a new cooker circuit is notifiable under Part P and should be done by a registered electrician.

Start with the appliance rating

Every cooking appliance has a rating plate, usually inside the door frame or underneath the hob, and the same figure appears in the installation instructions. It states the maximum power the appliance can draw. That figure, rather than the physical size of the oven or the price, decides how it must be connected.

As a general pattern, compact single ovens are designed to stay within what a standard plug and socket can supply and are sold with a plug fitted. Double ovens, pyrolytic self-cleaning models, range cookers and induction hobs draw considerably more and arrive with either no cable or a heavier flex intended for a fixed connection.

What a cooker circuit is

A cooker circuit is a radial circuit that runs from its own protective device in the consumer unit directly to a cooker control switch in the kitchen, and from there to an outlet plate behind the appliance. Nothing else shares it. The cable is heavier than the cable used for sockets because cooking appliances draw a large current for long periods.

The electrician selects the cable size and the rating of the protective device together. The calculation takes account of the appliance load, the length of the run and how the cable is installed: a cable buried in insulation or grouped with others cannot carry as much as one clipped to a surface. BS 7671 allows a diversity allowance for domestic cooking appliances, because every ring and element is rarely on at full power at once, but applying it is a design judgement rather than a rule of thumb for householders.

Can the oven and hob share one circuit?

Sometimes. Where a separate oven and hob sit close together, one cooker circuit and one switch can supply both, provided the circuit is designed for the combined load and both appliances are within reach of the switch. This is common in fitted kitchens and avoids running two heavy cables.

It is not always possible. A powerful induction hob paired with a large double oven can exceed what a single existing circuit was designed for. In that case the options are a second circuit, an upgrade of the existing one, or, with some hobs, setting a lower maximum power in the appliance's installer menu.

The cooker switch and its position

The cooker switch is there so the appliance can be isolated for cleaning, servicing or in an emergency. It needs to be easy to reach, close to the appliance, and not positioned directly above the hob where someone would have to lean over hot pans to use it.

Want a fixed written quote? Call 01235 430442 or send us the details.

Reusing an existing circuit

If the kitchen already has a cooker circuit, the electrician checks its cable size, the protective device, the condition of the connections at the switch and outlet plate, and whether the circuit has RCD protection. Older circuits were often installed for a freestanding cooker of modest power. An induction hob installed on the same cable may be fine or may not, and the only way to know is to compare the two.

Signs that an existing circuit needs attention include a scorched or cracked outlet plate, a cooker switch that feels warm, a rewireable fuse serving the circuit, or a consumer unit with no RCD protection. Where the board itself is dated, it can make sense to deal with that at the same time; see our page on consumer unit upgrades.

Part P, certificates and who should do the work

In England and Wales, a new circuit is notifiable under Part P of the Building Regulations. A registered electrician can self-certify the work, and you should receive an Electrical Installation Certificate and a Building Regulations compliance certificate. Connecting a replacement appliance to an existing, suitable cooker outlet is not notifiable, but it still has to be done safely and tested.

This is not a job to attempt yourself. Cooker circuits carry the highest currents in most homes after the shower, and a loose terminal behind an oven can overheat for months before anyone notices. Gas hobs and dual-fuel cookers also need a Gas Safe registered engineer for the gas connection; the electrician deals only with the electrical supply.

Common mistakes to avoid

  • Ordering an induction hob without checking whether the existing circuit can supply it.
  • Plugging a hard-wire-only appliance into a socket using a fitted plug.
  • Hiding the cooker switch inside a cupboard where nobody can find it in a hurry.
  • Leaving the outlet plate directly behind a built-in oven so the housing will not push back.
  • Assuming the kitchen fitter's quote includes electrical testing and certification.

If you are planning a wider refit, our kitchen electrics page explains how the cooker supply fits with sockets, lighting and extraction.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Only if the manufacturer supplies it with a plug or states that a plug-in connection is suitable. Higher-powered ovens must be hard-wired to a cooker circuit. Check the installation instructions rather than the size of the oven.

Most full-size induction hobs need a dedicated, hard-wired supply because of the power they can draw. Whether it can share a circuit with an oven depends on the combined load and the existing cable, which an electrician should assess.

Yes. A new circuit in a home in England or Wales is notifiable under Part P of the Building Regulations. A registered electrician can certify it and arrange the compliance certificate.

It should be near the appliance and easy to reach without leaning over the hob. Your electrician will position it to suit the layout and current guidance; agree this before tiling starts.

We deal with the electrical supply only. The gas connection must be made by a Gas Safe registered engineer.

Related pages

CallQuote