Electric shock or tingle from an appliance, switch or tap: what it means
People often describe it as a buzz, a tingle or a nip, and put it down to static. Static is a single sharp snap that happens once. A tingle that is there every time you touch a tap, an appliance casing or a switch is electricity finding a path through you, and it means something is wrong.
Last updated
Short answer
A repeatable tingle or shock from metalwork, a switch or an appliance is a sign of a fault and should be treated as urgent, however mild it feels. Stop using the item, switch off the circuit or the main switch if the source is unclear, and call an electrician. If someone has received a significant shock, feels unwell or was briefly unable to let go, seek medical help straight away.
If someone is being shocked
Do not touch a person who is still in contact with the source. Switch off the power at the socket, or at the consumer unit, if you can do so immediately. If you cannot, move them clear using something dry and non-conductive, such as a wooden broom handle, while standing on a dry surface. Call 999 if they are unresponsive, struggling to breathe, burned or confused.
Anyone who has had more than a slight shock should get medical advice the same day, because some effects on the heart are not obvious at the time. That applies particularly to children, pregnant women and anyone with a heart condition.
Why a mild tingle still matters
The current you feel depends on how good a path your body offers at that moment. Dry hands and rubber-soled shoes on a carpet make a poor path, and you feel a tingle. The same fault touched with wet hands, in bare feet on a concrete floor or while holding a metal tap with the other hand, can deliver a far larger current. The fault has not changed; only your resistance has.
That is why a tingle in a kitchen or bathroom is taken so seriously, and why the next person to touch it, in different circumstances, may not be as lucky.
Shocks from an appliance
Appliances with metal casings rely on an earth connection. If a fault inside allows a live part to touch the casing, the earth carries the fault current away and the fuse, breaker or RCD disconnects the supply. A shock from the casing means two things have gone wrong: there is a fault in the appliance, and the earth path is missing or poor. The earth may be broken in the appliance flex, in an extension lead, or in the socket circuit itself.
Unplug the appliance and stop using it. If a different appliance in the same socket also gives a tingle, the problem is in the installation and the circuit should be switched off. Heating elements in kettles, washing machines, ovens and immersion heaters are common sources of leakage as they age; our guide to an oven tripping the electrics describes the same failure from another angle.
Want a fixed written quote? Call 01235 430442 or send us the details.
Tingles from taps, sinks, radiators and showers
Metal pipework should be connected to the installation's main earthing terminal by bonding conductors, so that everything metal you can touch is held at the same voltage. When that bonding is missing, disconnected during plumbing work, or the main earth itself is faulty, a fault anywhere in the house can raise the voltage on the pipework. You then feel it between a tap and a wet sink, or between a tap and the floor.
A tingle from a tap can also originate outside your property, from a fault on the incoming supply cable or its neutral conductor. Signs that point this way include lights brightening and dimming, and neighbours with similar problems. In that case call your network operator on 105 as well as an electrician; they treat it as an emergency.
Electric showers deserve a mention. A tingle from the water or the shower unit means it must not be used until it has been checked. Our guide to earthing and bonding explains what these connections are for.
Shocks from switches and sockets
A plastic switch or socket should never give a shock from its front. If it does, the accessory is cracked or damaged, a conductor has come adrift behind it, or moisture has got in. Metal switch plates on old lighting circuits with no earth are a known danger: a loose wire touching the back of the plate makes the whole plate live with nothing to disconnect it.
Switch the circuit off at the consumer unit and leave it off. Do not remove the plate to look. An electrician will isolate, prove the circuit dead and then inspect it.
What the electrician will test
The investigation starts with the earthing: whether the main earth is present and effective, whether the bonding to water and gas pipework is in place and correctly sized, and whether each circuit has a continuous earth to every point. The protective devices are then tested, including the operating time of any RCDs. Insulation resistance tests show whether current is leaking from any circuit, and individual appliances can be tested separately.
Many homes where shocks occur turn out to have no RCD protection, or protection on only some circuits. An RCD is designed to disconnect quickly when current flows to earth through a person, and BS 7671 now expects it on almost all domestic circuits. Upgrading the board is often part of the remedy; see consumer unit upgrades. Replacing a consumer unit is notifiable under Part P of the Building Regulations and must be carried out and certified by a registered electrician.
Want a fixed written quote? Call 01235 430442 or send us the details.
