Skip to content
Adtec Electrical Services

How much does an extra socket cost?

Adding a socket is easier to budget for once the cable route and existing circuit have been checked.

Short answer

Typical UK guide figures for a straightforward additional indoor socket are about £90–£200, rising to £150–£300 or more for concealed wiring with difficult access. A new circuit or consumer unit work changes the scope substantially. These are not Adtec prices; Adtec gives a fixed written quote after seeing the job.

Typical UK guide figures for extra sockets

Typical UK guide figures for 2025–26, labour and materials, excluding VAT unless stated. Not Adtec prices; your job is priced after we see it.
Work or arrangementTypical UK guide figures
One additional socket, straightforward existing circuit£90–£200
One concealed socket with more difficult routing£150–£300+
Several sockets during one accessible visit£70–£150 each
New dedicated circuit, depending on route£300–£800+

These ranges describe different situations rather than a fixed menu. A decorative accessory, deep masonry chase, long cable route or restricted working space can change the total. Several points installed together may share preparation and testing time, but each still needs a suitable electrical design.

See sockets and lighting for the relevant service. When comparing figures, ask whether the socket accessory, cable, testing and any initial filling are included. Full wall finishing, wallpaper replacement and painting should be discussed explicitly rather than assumed from the phrase complete installation.

Why an existing socket is not always a suitable supply

Circuit design comes before convenience

The nearest accessory may not provide a suitable connection for another socket. An electrician needs to establish the circuit arrangement, conductor sizes, protective devices and existing alterations. A socket already supplied as an unfused spur cannot simply become the starting point for an unrestricted chain of additional sockets. There may be other design options, but they must be checked rather than guessed from the visible faceplate.

Expected use matters too. A desk with modest equipment is different from a collection of heaters or high-powered kitchen appliances. Describe what you intend to plug in, not just where you want a new outlet. For larger room changes, planning sockets and switches helps you prepare a useful layout before cable routes and circuit capacity are assessed.

Cable routes, wall finishes and disruption

Surface-mounted sockets and trunking can avoid extensive chasing, although the route still needs to be safe and suitable. Concealed wiring may involve lifting floorboards, opening a ceiling or cutting plaster. Concrete floors, tiled walls and fitted furniture reduce the available options. The shortest straight line on a room plan may not be a permitted or practical cable route within the building.

Tell the electrician about planned decorating, new flooring and furniture that cannot be moved. If a room is being renovated, electrical work usually fits best before the final finishes. Ask who will lift and reinstate flooring, what protection is included and whether the work leaves a filled chase or a wall ready for decoration. These details can affect the total household budget more than the difference between two standard socket accessories.

Want a fixed written quote? Call 01235 430442 or send us the details.

Protection, testing and certificates

An extension still needs checking

Adding an outlet requires appropriate verification of the work and the existing installation where relevant. Modern requirements commonly involve RCD protection for household socket circuits, but the electrician must assess the particular arrangement. An older consumer unit does not automatically make every extra socket impossible, nor does a spare breaker position automatically make a proposed circuit acceptable.

If deficiencies prevent a safe addition, ask for them to be explained separately with options. Consumer unit upgrades may be relevant in some properties, but a replacement board should not be sold solely because the existing one looks old. Read installation certificates for the difference between documenting new work and assessing an existing installation. Agree which certificate the job requires and how any Building Regulations notification will be handled where applicable.

When to call an electrician

Arrange a visit before extending a circuit yourself or relying permanently on adapters and extension leads. Call sooner if outlets are loose, cracked, hot, discoloured or intermittently losing power. A new socket elsewhere will not resolve a damaged connection or overloaded arrangement. Stop using any visibly damaged accessory and seek fault finding rather than covering the symptom with additional plug-in equipment.

Kitchen, utility, outdoor and bathroom proposals need particular care because the environment and intended loads influence the design. Do not assume every job is non-notifiable just because it involves one outlet. Work in special locations and the creation of new circuits can bring additional requirements. Our DIY electrical work rules guide provides general context, but the person designing the installation should confirm what applies to your particular work.

Getting an accurate price for your room

Send the room use, a photograph of the intended position and a wider view showing doors, furniture and nearby sockets. Mention the wall construction if known, whether there is accessible space above or below, and whether you want white moulded or decorative accessories. Photographs help an initial discussion but do not establish circuit capacity or the condition of hidden connections.

Adtec carries out domestic electrical work, with domestic jobs staying closer to Wantage. A fixed written quote is provided after seeing the job, so any necessary circuit work can be distinguished from optional finish choices. Use contact to outline the work and your decorating timetable. Before accepting, check the number of socket positions, mounting style, cable route, making good, testing, VAT treatment and any agreed exclusions.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Usually the labour and cable route dominate a small installation, so the accessory difference alone does not double the total. Space, box depth and the proposed electrical load still need checking.

They can be convenient, but charging standards and power requirements change. Compare the available charging output and replacement options, and make sure the accessory suits the back-box depth.

Discuss that before buying them, including the exact product and required box depth. Unsuitable or incomplete accessories can delay the work, and fitting customer-supplied items needs to be agreed.

Not normally just because one extra point is wanted. Testing may reveal wider defects, but any recommendation for substantial rewiring should be explained with findings rather than assumed from the request.

Related pages

CallQuote