Skip to content
Adtec Electrical Services

IP ratings explained for bathroom and outdoor electrics

Light fittings, sockets and enclosures sold for bathrooms and gardens carry an IP rating. The two digits look like a product code, but they are a standardised description of how well the item keeps out solid objects and water.

Last updated

Short answer

IP stands for ingress protection. The first digit, from 0 to 6, describes protection against solid objects and dust; the second, from 0 to 9, describes protection against water. IP44 means protected against small objects and splashing water; IP65 means dust-tight and protected against water jets; IP67 means dust-tight and able to withstand temporary immersion. BS 7671 sets minimum ratings for equipment in bathroom zones and requires outdoor equipment to suit its exposure. The rating only holds if the product is installed as the manufacturer intends, which is one reason to have a qualified electrician fit it.

How the code works

The IP code is defined by an international standard adopted in the UK. Each digit is assessed separately, so a product can be excellent against dust and modest against water, or the reverse. Where a manufacturer has only tested one aspect, the other is shown as X. IPX4, for example, makes a claim about water and says nothing about dust.

Common IP ratings on domestic and commercial fittings
RatingWhat it means in practice
IP20Protected against fingers; no protection against water. Ordinary indoor fittings.
IP44Protected against small objects and water splashing from any direction.
IP54Limited dust entry and splashing water.
IP65Dust-tight and protected against low-pressure water jets.
IP66Dust-tight and protected against powerful water jets.
IP67Dust-tight and protected against temporary immersion.
IP68Dust-tight and suitable for continuous immersion under conditions the maker specifies.

Water ratings are not a simple ladder

It is natural to assume that a higher second digit includes everything below it. That is not quite true. The tests for jets and the tests for immersion are different, and a product that survives immersion has not necessarily been tested against a jet of water. Where both matter, manufacturers quote two ratings together. For most domestic purposes the distinction is academic, but it is the reason an electrician looks at where the water will actually come from before choosing a fitting.

Bathrooms

BS 7671 divides a bathroom into zones. Zone 0 is the inside of the bath or shower tray. Zone 1 is the space directly above it, up to a set height. Zone 2 extends a short distance beyond the edge of the bath or shower. Equipment in zone 0 must withstand immersion and be supplied at a safe extra-low voltage. In zones 1 and 2 the minimum is protection against splashing, equivalent to the water figure in IP44, and higher where water jets are likely to be used for cleaning.

In practice, many people choose fittings rated for zone 1 throughout a bathroom ceiling, which removes any doubt as the room is rearranged over time. Steam matters as well as splashing: an unsealed fitting above a shower corrodes from condensation long before it is splashed. Our guide to bathroom electrical zones sets out the zones and what is permitted in each.

Outdoors

There is no single required rating for outdoor equipment; BS 7671 requires it to be suitable for the conditions. A light under a deep porch faces very little. A fitting on an exposed gable wall faces driving rain. Ground-recessed lights and anything near a pond face standing water. As a broad guide, splash-rated fittings suit sheltered positions, jet-rated fittings suit exposed walls and posts, and immersion-rated fittings are used in the ground.

Coastal air, fertiliser and constant damp also attack metal finishes, so material matters alongside the rating. Our outdoor lighting page covers how we select and position fittings.

Want a fixed written quote? Call 01235 430442 or send us the details.

Why installation decides the outcome

A rating is achieved in a test laboratory with the product assembled exactly as designed. On site, the same product can let water in if it is fitted differently. The usual failures are familiar:

  • Cable entering through the top of an enclosure, so water runs down the cable and in.
  • A cable gland of the wrong size, or a hole drilled without one.
  • A gasket pinched, missing or painted over.
  • A fitting mounted on rough render or brick without sealing behind it.
  • Drain holes blocked, or placed at the top because the unit was fitted upside down.
  • Connections made in tape or an indoor junction box hidden nearby.

Most outdoor electrical faults trace back to water in a connection rather than to the fitting itself. Tripping in wet weather is the usual symptom.

Commercial and industrial settings

The same code applies to commercial equipment. Kitchens that are washed down, plant rooms, car parks, loading bays and dusty workshops all call for enclosures and fittings chosen for the environment, and the first digit, dust, becomes as important as the second. Impact resistance is covered by a separate code, the IK rating, which appears alongside the IP rating on fittings for areas where knocks are likely.

Who should choose and fit the equipment

You can read the rating on the box, but selecting it is part of the electrical design, together with RCD protection, the cable type and how connections are made. Additions and alterations in bathroom zones, and any new circuit, are notifiable under Part P in England and Wales. A registered electrician will select suitable equipment, install it so the rating is preserved, test the circuit and provide the certificate.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

It depends on the zone. Directly above a bath or shower and in the area just beyond it, protection against splashing equivalent to IP44 is the minimum, with higher ratings where jets are used. Many people fit zone 1 rated lights throughout.

It can be for sheltered positions such as under a porch. Exposed walls, posts and ground-level positions usually call for a higher rating.

The fitting is dust-tight and protected against low-pressure water jets from any direction when installed as the manufacturer intends.

Not necessarily. The jet and immersion tests differ, and a higher rating can add cost without benefit. The right rating is the one that matches the location.

Related pages

CallQuote