Electrical Needs for Offices and Small Warehouses
A business owner's overview of what a working unit needs electrically, from the incoming supply to the paperwork.
Many small businesses occupy a mixed unit: a few offices at the front and an open warehouse or workshop behind. Each part has different electrical demands, and moving in, expanding or refitting is the right moment to check they're all covered. This overview walks through the main areas and points to the relevant commercial electrical services for each.
Start with the supply
Everything depends on how much power the building can take. Find out whether the supply is single-phase or three-phase and what size the main fuse is. An office full of laptops needs little; a warehouse with compressors, battery chargers and heaters may need far more. If heavy machinery is planned, our guide to three-phase electrics for warehouses explains the options.
Boards and circuits
A tidy arrangement usually has a main switch and separate distribution boards for the office and the warehouse. That keeps faults contained and makes future changes simpler. Every board should carry an up-to-date circuit chart. In older units it's common to find boards that have been extended by several tenants, with circuits nobody can identify; sorting that out early saves hours later. See our distribution board service.
Power and data in the office
Desks need enough sockets in the right places, ideally in floor boxes or perimeter trunking rather than extension leads across walkways. Kitchens and comms cupboards often need their own circuits. Data points should be planned alongside power, so cables share routes without interference. On our office electrical jobs we run the power, and on data cabling we install the cabling and patch panels, leaving the IT equipment to the customer's IT team, or a team we subcontract.
Power on the warehouse floor
Warehouses need fewer sockets but tougher ones: industrial outlets at sensible heights, dedicated circuits for chargers, roller-door motors and any fixed machinery, and local isolators so kit can be locked off for maintenance. Cables are best run high on tray or basket, well clear of forklift routes and racking.
Lighting
Offices need comfortable, glare-free light at desk level. Warehouses need even light between racking at height, often with presence detection so empty aisles aren't lit all day. Switching from old fluorescent or high-bay lamps to LED usually cuts running costs and maintenance. More on this on our commercial lighting and warehouse lighting pages.
Emergency lighting
Escape routes, exits and open areas need lighting that works when the mains fails. It has to be tested regularly and the results recorded, usually as part of the fire risk assessment. Our emergency lighting page explains what's involved.
Testing and records
Business owners have a duty to keep electrical systems safe, and insurers and landlords often ask for proof. The core document is a periodic condition report. Keep it with the emergency lighting log, any installation certificates for new work and, if you choose, portable appliance testing records. Our commercial EICR page covers the inspection, and planned maintenance can keep the schedule on track.
A quick checklist for a new unit
- Supply type and capacity confirmed against your planned equipment.
- Latest condition report reviewed, with any codes understood.
- Board schedules present and accurate.
- Enough power and data where people actually sit.
- Emergency lighting working and logged.
We've worked on commercial projects since 2014 from our base at Lyford, near Wantage. For a fixed quote, call 01235 430442.
Frequently asked questions
Want a price for your job?
Call 01235 430442 (Monday to Friday, 7:30am to 5:30pm) or send us the details.
