Skip to content
Adtec Electrical Services

Office data cabling: planning points, cabinets and patch panels

Wireless networks carry more office traffic every year, yet the wireless access points, phones, printers and desks that depend on them still rely on cable behind the walls. Planning that cabling properly at fit-out is far cheaper than adding to it once the office is occupied.

Last updated

Short answer

Structured cabling links every data outlet in the building back to patch panels in a central cabinet, where the IT team connects each outlet to the network equipment. Planning comes down to four things: how many outlets are needed and where, where the cabinet goes, how the cables get there, and how the finished links are tested and labelled. Data cabling is installed alongside the power installation, so containment and segregation from mains cables are designed together under BS 7671. Part P does not apply to commercial premises, but power to cabinets and desks must be installed and certified by a qualified electrician.

What structured cabling is

In a structured system, each outlet on the wall, floor box or ceiling has its own cable running back to a patch panel, a strip of numbered sockets mounted in a cabinet. Short patch leads then connect each panel socket to a port on the network switch. Because every outlet ends at the same place, any outlet can be assigned to any service, a computer, a phone, a printer or a camera, by moving a patch lead. Nothing in the walls has to change when the office is rearranged.

Adtec installs the data cabling, outlets and patch panels. The active equipment that sits in the cabinet, switches, routers, firewalls and wireless controllers, is installed and configured by a dedicated IT team, which we can subcontract if a client does not have one.

How many outlets, and where

Running an extra cable while the ceiling is open costs little. Returning to add one later costs a great deal more, so it pays to be generous. Work through the floor plan and count:

  • Each desk position, typically with more than one outlet.
  • Printers, copiers and franking machines.
  • Ceiling positions for wireless access points, spaced to suit the building.
  • Meeting room tables, wall screens and video conferencing units.
  • Reception, door entry, access control and camera positions.
  • Tills, card terminals and stock room equipment in retail or trade counter areas.
  • Spare outlets in areas likely to be reconfigured.

Many devices can now be powered through the data cable itself, which removes the need for a mains socket at a ceiling access point or camera. That is decided with the IT team, since it affects the switches they specify.

Choosing the cable category

The cable category sets the speed the link can support and how well it rejects interference. The choice for most new office installations is between Cat6 and Cat6a. Our guide to Cat6 vs Cat6a compares them. Whichever is chosen, outlets, patch panels and cable should all be of the same category, since a link performs only as well as its weakest component.

Where the cabinet goes

Copper data links have a maximum length set by the cabling standards, of around ninety metres for the fixed cable between panel and outlet. In most single-floor offices one cabinet near the centre of the floor plate serves everything. Large floor plates, multiple storeys and separate buildings may need more than one cabinet, linked to each other.

The cabinet needs a dry, secure, ventilated position with space to open the door and work in front of it, a dedicated power supply, and a route in for the incoming broadband or fibre service. A cupboard shared with the cleaner's sink is not ideal; nor is a position directly beneath pipework. Size the cabinet with room to grow, as adding panels later is easy only if there is space for them.

Want a fixed written quote? Call 01235 430442 or send us the details.

Cable routes and containment

Data cables are carried in their own containment: basket or tray above ceilings, compartments in dado or skirting trunking, and separate compartments in floor boxes. They are kept apart from mains cables, both to prevent electrical interference and to meet the safety requirements for separating circuits of different types. Bends are kept gentle and cables are not crushed by ties, because the performance of the cable depends on its internal geometry.

Where cables pass through fire-rated walls and floors, the openings are sealed afterwards to maintain the fire separation. Planning the routes with the electrical containment at the outset avoids congested ceiling voids later; see our page on office electrical work.

Power for the cabinet and the desks

The cabinet needs its own clearly labelled circuit, not a socket shared with general office equipment, so that it is not switched off by accident. Where the IT team specifies an uninterruptible power supply, the circuit is designed to suit it. At desks, the number of power sockets should be planned alongside the data outlets. This part of the work is an electrical installation under BS 7671 and is tested and certified in the usual way.

Testing, labelling and handover

Every installed link should be tested with a cable certifier, which measures its performance against the standard for the category and stores a result for each outlet. Simple continuity testers only show that the wires are connected in the right order; they do not show that the link will carry data at the speed intended. Ask for the test results as part of the handover.

Each outlet and its patch panel port should carry the same number, and the schedule should show which room each serves. That labelling is what allows an IT technician to find a fault or move a user in minutes.

When to involve us

The best time is while the office layout is being drawn, before ceilings and partitions go in. For an occupied office, cabling can be added in stages around working hours by arrangement. Our data cabling page describes the service.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

It depends on the equipment, but allowing more than one per desk position gives flexibility for a phone, a computer and future changes. Extra outlets are inexpensive at installation.

A panel of numbered sockets in the data cabinet where every outlet cable terminates. Patch leads connect each socket to the network switch.

We install the cabling, outlets and patch panels. Network equipment is installed and configured by an IT team, which we can subcontract if needed.

The cabling standards limit the fixed copper link to around ninety metres. Longer distances need an additional cabinet or a fibre link.

Yes. Each link should be certified with a cable tester and the results handed over, so you know every outlet performs to its category.

Related pages

CallQuote