How much does an office rewire cost?
A useful office rewire budget starts with the floor plan, electrical loads and a realistic shutdown plan.
Short answer
Typical UK guide figures might be £4,000–£12,000 for a small straightforward office and £12,000–£35,000 or more for a medium office with more circuits and containment. Size alone cannot establish the price, and data systems or major distribution work can add substantially. These are not Adtec prices; Adtec gives a fixed written quote after seeing the job.
Typical UK guide figures for office rewiring
| Work or arrangement | Typical UK guide figures |
|---|---|
| Small office, roughly 50–100 m², straightforward scope | £4,000–£12,000 |
| Medium office, roughly 100–250 m², wider replacement | £12,000–£35,000+ |
| Larger or complex office, roughly 250–500 m² | £25,000–£75,000+ |
| Budget cross-check for ordinary electrical work | Approximately £60–£150+ per m² |
These are broad planning bands, not a survey-based estimate or a promise that every office falls within them. Area-based figures are only a rough cross-check and should not be added to the project bands. Landlord infrastructure, specialist equipment, extensive data cabling and building repairs may sit outside a basic electrical package.
Start with office electrical installations and identify whether you need a genuine rewire, an alteration for a new layout or replacement of selected ageing circuits. Each has a different cost and disruption profile.
Define the installation you actually need
Count loads as well as desks
The number of employees is a poor substitute for an electrical schedule. Workstations, meeting rooms, kitchens, cleaning supplies, printing equipment and ventilation all place different demands on the installation. Existing distribution equipment and spare capacity need assessment before additional circuits are promised. A new layout may also reveal overloaded local arrangements that were previously hidden behind extension leads.
Provide a floor plan showing desk groups, fixed appliances and any expected expansion. Distinguish essential equipment from items that can be shut down during the work. Where supply capacity or distribution changes are needed, discuss three-phase and distribution boards. A quote should separate the electrician’s installation scope from any work or charges controlled by the network operator, landlord or other parties.
Access, containment and keeping the business operating
Raised floors and accessible ceiling voids can simplify cable installation, but they still need inspection and coordinated access. Solid floors, congested risers, occupied meeting rooms and fire compartments make routing more involved. Existing containment may not be reusable or large enough, and any new penetrations need suitable treatment so the building’s fire precautions are maintained.
A vacant office is different from a workplace that must remain operational throughout. Agree a phased programme, areas that can be cleared and the permitted isolation windows before asking for a final price. Do not assume a price includes unrestricted evening or weekend working. Adtec’s stated hours are Monday to Friday, 7:30am to 5:30pm; discuss programme requirements directly rather than treating an electrical contractor as a service available outside those hours.
Want a fixed written quote? Call 01235 430442 or send us the details.
Data, lighting and other connected packages
Separate power work from IT equipment
A rewire is a useful point to review data outlets and patch-panel positions, but power and communications still need appropriate separation and coordinated routing. Adtec carries out data cabling and patch panels. IT equipment is installed by an IT team, which Adtec can subcontract; agree that responsibility and the handover requirements rather than assuming that cable installation includes configuring your network.
Lighting replacement, controls and emergency lighting can materially alter the budget. Review the intended use of rooms and any changes to escape routes with the people responsible for the building. See commercial lighting and emergency lighting for related services. Confirm whether access equipment, removal of redundant wiring and disposal are included, and avoid allowing several contractors to price the same containment while leaving another essential task unallocated.
When to call a professional
Arrange an electrical survey before signing a fit-out programme or ordering furniture that fixes socket positions. Repeated trips, damaged equipment, overheating or significant layout changes justify earlier assessment. An existing commercial EICR can provide useful findings, but it is not a complete design brief or an automatic instruction to replace every circuit. Any recommendation for full replacement should be supported by condition, suitability and business requirements.
Your designer also needs to understand landlord consents, building access rules and responsibilities at shared distribution equipment. Do not remove covers, trace live conductors or try temporary links to keep desks supplied. If the project includes other building work, coordinate with builders and developers so the electrical first fix, fire stopping, ceilings and final testing fit the programme instead of becoming competing tasks at the end.
What the written quotation should establish
Ask for a schedule of socket outlets, circuits, lighting points, boards and data positions, together with product assumptions and exclusions. Identify the extent of strip-out, temporary supplies, builder’s work, final making good and certification. A fixed written quote is more meaningful when the drawing revision and site assumptions are recorded, so later layout changes can be identified and agreed before additional work proceeds.
Adtec Electrical Services Ltd undertakes commercial work across Oxfordshire and surrounding counties, generally within about 35 miles of Lyford. Use contact to arrange a discussion and site assessment; Adtec gives a fixed written quote after seeing the job. Request the expected test documentation and handover information as part of the scope. Keep the completed drawings, circuit schedules and certificates accessible for future maintenance rather than leaving them with an individual employee.