Preparing for an EICR: how to get ready for the inspection
An Electrical Installation Condition Report goes more smoothly, and produces a more useful result, when the inspector can reach everything and knows the history of the installation. A little preparation by the owner, landlord or facilities manager makes a real difference.
Last updated
Short answer
Before an EICR, make sure the inspector can reach the consumer unit or distribution boards, the meter position and a good sample of sockets, switches and fittings; gather any previous reports and certificates; and warn occupants that the power will be off for parts of the visit. Inspection and testing is carried out against BS 7671 by a qualified electrician and reports on the condition of the fixed wiring. Any remedial work it identifies should also be done by a qualified electrician, and where that involves a new circuit or a consumer unit in a home it is notifiable under Part P.
What the inspector needs to do
An EICR combines a visual inspection with a series of electrical tests. The inspector examines the intake position, the earthing and bonding, the consumer unit or distribution boards, and a sample of the accessories on each circuit. Circuits are then tested with instruments to check that conductors are continuous, insulation is sound, protective devices will disconnect in the required time and RCDs operate correctly. Several of these tests can only be done with the circuit, or the whole installation, switched off.
What the report is and how its observation codes work is covered in our guide, what is an EICR. This page is about making the visit itself productive.
Agree the scope beforehand
The extent of the inspection and any limitations are agreed before work starts and recorded on the report. A limitation is anything that could not be inspected or tested, for instance a circuit that could not be switched off or a locked room. Each limitation reduces what the report can tell you, so the aim is to keep them to a minimum.
Tell the electrician how many consumer units or distribution boards there are, roughly how many circuits, whether there are outbuildings, and what the report is for: a tenancy, a sale, a lease requirement or routine maintenance. For larger commercial sites, a sampling approach may be agreed; our commercial EICR page explains how that works.
Access
- Clear the cupboard or area around the consumer unit and meter so the inspector can work there.
- Make sockets and switches reachable in each room; heavy furniture in front of every socket limits the sample.
- Provide keys for locked rooms, plant rooms, risers, outbuildings and garages.
- Make the loft hatch accessible if there is wiring or equipment there.
- In rented property, give tenants proper notice and confirm someone will be in.
- In commercial premises, arrange an escort and any permits or inductions the site requires.
Paperwork to find
Previous condition reports, installation certificates for alterations, the consumer unit circuit chart and any drawings all help. They show how the installation has changed, allow results to be compared with earlier tests, and can shorten the visit. If none exist, say so; the inspector will then need to identify and label circuits as part of the work, which takes longer.
Want a fixed written quote? Call 01235 430442 or send us the details.
Planning for the power being off
Expect the supply to be interrupted more than once, for periods that depend on the size of the installation. Before the visit:
- Save work and shut down computers, servers and tills in an orderly way.
- Think about equipment that must not lose power: medical devices, aquariums, refrigeration, alarm and door entry systems.
- Note anything that will need resetting afterwards, such as timers, heating programmers and routers.
- For businesses, choose a time that disturbs trading least and tell staff in advance.
If something cannot be switched off, tell the inspector at the start. It can be recorded as a limitation or tested at another time.
Small fixes worth making first
You do not need to renovate before an inspection, and nobody should attempt electrical repairs they are not qualified to make. But obvious items can be dealt with or at least pointed out: cracked socket fronts, missing lamps, a blanking plate missing from the consumer unit, cable hanging loose in a garage. Make a list of anything that has given trouble, such as a circuit that trips or a socket that feels warm. The inspector can then look at it specifically instead of finding it by chance.
How long it takes
Duration depends on the number of circuits, the age of the installation, access and the quality of existing records. A small flat with a modern consumer unit is inspected far more quickly than a large older house with outbuildings, and commercial premises range from a few hours to several days. Ask for an estimate when booking, and avoid arranging other trades to work on the electrics at the same time.
After the visit
The report classifies the installation as satisfactory or unsatisfactory and lists observations with codes. Our guide to EICR codes explains them. An unsatisfactory result means remedial work or further investigation is needed. Landlords in the private rented sector in England have set periods to complete that work and to give tenants and, on request, the local authority a copy of the report; these are summarised on our landlord EICR page.
Remedial work should be carried out by a qualified electrician and certified. In a dwelling, replacing a consumer unit or installing a new circuit as part of the remedial work is notifiable under Part P.
Want a fixed written quote? Call 01235 430442 or send us the details.