Rewire cost by house size: 2-bed bungalow, 3-bed and 4-bed houses

People naturally ask what it costs to rewire a three-bedroom house, as though bedrooms were the unit of measurement. Size does matter, but two houses with the same number of bedrooms can produce very different quotes. This guide explains what changes as a property gets bigger and what else moves the price.

Last updated

Short answer

A rewire is priced on the amount of cable, the number of points and circuits, and above all the labour needed to get cables in and make good. A larger house has more of each, so a 4-bed house costs more than a 3-bed, which costs more than a 2-bed bungalow. Access, construction, occupancy and specification can shift the figure as much as size does, so a survey is the only way to a firm price.

Why this guide gives factors, not a price list

Online price tables for rewires by bedroom count are averages of very different jobs. An empty property with lifted floors and an occupied, freshly decorated one are not the same job even if the floor plans match. We would sooner explain what an electrician is actually counting when they price your house, so that you can read a quote properly. Our general guide to house rewire cost covers the overall picture.

What grows as the house gets bigger

How typical rewires differ by property size
PropertyTypical circuits and pointsAccessWhat usually drives the labour
2-bed bungalowFewer rooms, one lighting level, modest number of socket circuitsLoft above every roomChasing walls for drops; insulation depth in the loft
3-bed houseTwo floors, separate upstairs and downstairs circuits, more pointsLoft for first-floor ceilings; floorboards lifted for ground-floor lightingLifting and relaying floors; chasing on two levels
4-bed houseMore rooms, often more bathrooms, larger kitchen, possibly outbuildingsAs a 3-bed, with longer runsLonger cable routes, additional circuits, larger consumer unit

Each extra room adds sockets, a light, a switch and the cable runs to reach them. Extra bathrooms add fans, shaver points and possibly shower circuits. Larger houses also tend to have more of the things that need a circuit of their own, such as range cookers, garages, garden buildings and car chargers.

The 2-bed bungalow

Bungalows are often the most straightforward rewires. With a loft over the whole footprint, lighting cables and the drops to switches and sockets can usually be reached from above, with no floors to lift.

That advantage depends on the loft. Deep insulation, boarding, low headroom at the eaves and stored belongings all slow the work, and cables must be routed so they are not buried in insulation in a way that affects their rating. Bungalows with solid floors mean every socket is fed from above, which increases the amount of wall chasing. Extended bungalows with flat roofs have sections where there is no loft at all.

The 3-bed house

The typical three-bedroom semi or terrace introduces a second storey. First-floor lighting is reached from the loft, but ground-floor lighting runs in the void under the first-floor boards. That means lifting carpets and floorboards upstairs, which is where furniture, fitted wardrobes and laminate or tiled floors start to affect the time.

Ground-floor sockets may be fed from under a suspended timber floor or dropped from above, depending on construction. The age of the house matters too: lath-and-plaster ceilings, solid internal walls and previous alterations all influence how easily cables can be installed. Our guide to old wiring types describes what is commonly found in houses of different ages.

Want a fixed written quote? Call 01235 430442 or send us the details.

The 4-bed house

A four-bedroom house is more than a three-bed with one extra room. Detached layouts have longer runs from the consumer unit, and there are commonly en-suites, utility rooms, more external lighting and a larger kitchen. The consumer unit needs more ways, and it can make sense to split the installation into more circuits so that a fault affects less of the house.

Larger homes are also where customers tend to add to the specification: more sockets per room, downlights in place of pendants, data points, wired alarms and outdoor power. Those choices are entirely reasonable but they are additions to the rewire, and they explain why two quotes for similar houses can differ widely.

Factors that matter more than bedrooms

  • Occupied or empty. Working around a family and their belongings is slower than working in a vacant house.
  • Making good. Whether the price includes filling chases and patching plaster, or leaves that to a plasterer and decorator.
  • Specification. The number of sockets and lights, the type of accessories and the choice of consumer unit protection.
  • Full or partial. Sometimes sound parts of an installation can be kept; see full vs partial rewire.
  • Timing. A rewire done alongside other building work, with floors up and plaster off, is far easier than one done in isolation.

Time on site follows the same factors, which we cover in how long does a rewire take.

Getting a firm price

A proper quote follows a visit. The electrician will look at the consumer unit, earthing and existing wiring, walk each room with you to agree the points, and check floors and loft access. Ask for the quote to list the number of points, the consumer unit specification, what making good is included and the certificate you will receive.

A rewire is not DIY work. It includes a new consumer unit and new circuits throughout, is notifiable under Part P of the Building Regulations and must be tested and certified to BS 7671 by a qualified electrician. To arrange a survey, see our house rewires page.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

It depends on the number of points, the construction, whether the house is occupied and how much making good is included. A 3-bed house sits between a small bungalow and a larger detached home, but only a survey produces a reliable figure.

Often, because the loft gives access to every room and there are no upper floors to lift. Solid floors, deep loft insulation or flat-roofed extensions can reduce that advantage.

Quotes may be based on different numbers of sockets and lights, different consumer units, and different assumptions about making good and access. Comparing the detail line by line usually explains the gap.

Usually somewhat longer, because of the extra rooms, longer cable runs and additional circuits for en-suites and larger kitchens. Access and occupancy still have a large effect on the programme.

Clearing rooms, lifting carpets, agreeing the points early and combining the rewire with other building work all reduce labour. Cutting corners on the consumer unit or testing is not a sensible saving.