Skip to content
Adtec Electrical Services

Smoke and heat alarm types: choosing the right one for each room

Alarms that sound every time someone makes toast get disconnected, and an alarm that has been disconnected protects nobody. Choosing the right type of detector for each room is what keeps a system both effective and tolerable to live with.

Last updated

Short answer

Homes generally use three kinds of alarm: optical smoke alarms for hallways, landings, living rooms and bedrooms; heat alarms for kitchens and garages, where smoke alarms would give false alarms; and carbon monoxide alarms in rooms with fuel-burning appliances. The British Standard for domestic fire alarm systems, BS 5839-6, recommends mains-powered alarms with battery back-up, interlinked so that all sound together. Mains alarms are part of the fixed wiring, so they must be installed to BS 7671, and a new alarm circuit is notifiable under Part P; use a registered electrician.

Optical smoke alarms

An optical alarm contains a small chamber with a light source and a sensor. Smoke entering the chamber scatters the light on to the sensor and triggers the alarm. This design responds well to the slow, smouldering fires typical of upholstery, bedding and overheated wiring, and it is less easily set off by cooking fumes drifting from a kitchen than the older ionisation type.

Optical alarms are the standard choice for hallways and landings, which form the escape route, and for living rooms and bedrooms. Ionisation alarms, once the most common type in UK homes, are now rarely specified.

Heat alarms

A heat alarm ignores smoke entirely and responds to temperature at the ceiling. That makes it suitable for rooms where smoke, steam and fumes are part of normal life: kitchens above all, and also garages and some utility rooms. It will not react to burnt toast, but it will react to a pan fire.

Because heat alarms respond later than smoke alarms, they are not a substitute elsewhere in the house. They only make sense as part of an interlinked system, so that a fire in the kitchen sounds the alarms on the landing and in the bedrooms.

Carbon monoxide alarms

Carbon monoxide alarms detect a gas, not a fire. They are sited in rooms containing boilers, gas fires, wood burners, open fires and other fuel-burning appliances. They follow different positioning guidance from smoke alarms, set by the manufacturer according to whether the unit is on the wall or ceiling and how far it is from the appliance. Combined smoke and carbon monoxide units exist, but the best position for one purpose is not always the best for the other. The legal requirements for rented homes are summarised in our guide to smoke alarm regulations.

Mains or battery

BS 5839-6 describes alarm systems by grade. The grades most relevant to houses are mains-powered alarms with a sealed, long-life back-up battery, mains-powered alarms with a replaceable back-up battery, and battery-only alarms. The standard recommends mains-powered alarms with back-up for new and materially altered homes and for rented property, because they do not depend on anyone remembering to change a battery and cannot be silenced permanently by removing it.

Battery-only alarms with sealed long-life cells are far better than none, and are a reasonable way to add protection quickly in an existing owner-occupied home. They are not what Building Regulations expect in a new build, an extension with new habitable rooms or a loft conversion, where mains-powered interlinked alarms are specified.

Want a fixed written quote? Call 01235 430442 or send us the details.

Interlinking

Interlinked alarms all sound when any one detects a fire. In a house with closed bedroom doors that can be the difference between waking and not waking. There are two methods. Hard-wired interlinking uses an extra conductor in the cable between alarms, which is simple when the house is being wired or rewired. Radio interlinking uses a wireless signal between alarms, each of which still takes its power from a nearby lighting circuit or its own supply. Radio linking avoids running cable across finished ceilings and is the usual approach when upgrading an occupied home.

Alarms from different manufacturers generally cannot be interlinked with each other, so a system is normally built from one compatible range.

How much coverage

The standard also describes categories of coverage. The minimum covers the escape routes only: hallways and landings. The level usually recommended for most homes adds the rooms where fires are most likely to start, the principal living room and the kitchen. The highest category covers every room where a fire could start, including bedrooms. Which is appropriate depends on the layout of the house and who lives there; more coverage is sensible where occupants would be slow to escape.

Positioning basics

  • On the ceiling, as near the centre of the room or hallway as practical.
  • Clear of walls, beams and light fittings by the distance the manufacturer states.
  • Away from bathroom doors, where steam causes false alarms.
  • Within reach for testing, and not above a stairwell where a ladder cannot safely be used.
  • Close enough to bedroom doors to be heard clearly with the doors shut.

Installation, testing and replacement

Mains-powered alarms are connected either to a dedicated circuit or to a regularly used local lighting circuit, as the standard permits. Either way they are fixed wiring and must comply with BS 7671. A new dedicated circuit is notifiable under Part P in England and Wales, and the installer should provide the electrical certificate along with the alarm manufacturer's instructions.

Alarms should be tested regularly with the test button and kept free of dust. The sensors have a limited life: every alarm carries a replace-by date, typically around ten years from manufacture. When alarms reach that date the whole unit is replaced, not only the battery. Our smoke alarm installation page explains what we fit and how.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

A heat alarm is the usual choice for a kitchen, because cooking fumes cause false alarms in smoke alarms. It should be interlinked with smoke alarms elsewhere in the house.

Mains-powered alarms with battery back-up are what BS 5839-6 recommends for new, altered and rented homes, as they do not rely on battery changes. Sealed long-life battery alarms are a reasonable upgrade where wiring is impractical.

Yes. Radio-interlinked alarms are commonly mains powered with battery back-up; the radio link only replaces the interconnecting cable between units.

Each alarm has a replace-by date marked on it, typically around ten years from manufacture. The complete unit should be replaced by that date.

A new dedicated circuit is notifiable. Alarms added to an existing lighting circuit are an alteration that must still comply with BS 7671 and be certified by the electrician.

Related pages

CallQuote