Skip to content
Adtec Electrical Services

Light bulbs keep blowing: common causes and when to call an electrician

A lamp that fails now and then is normal. A fitting that eats a new bulb every few weeks, or a house where lamps fail in several rooms, is telling you something. The cause is usually simple, but a few of the possibilities are worth having tested rather than living with.

Last updated

Short answer

Bulbs that keep blowing in one fitting usually point to heat, a poor-quality lamp, a worn lampholder or a loose connection at that fitting. Failures across several rooms are more likely to be the lamps themselves, an unsuitable dimmer or, less often, a supply or wiring problem. Anything involving scorching, crackling or a tripping circuit needs an electrician.

Start by noticing the pattern

The most useful thing you can do before calling anyone is to work out where and when the lamps fail. Is it always the same fitting? Is it one room, one floor, or the whole house? Do the lamps fail at switch-on, or go out while they are running? Has anything changed recently, such as new lamps, a new dimmer or building work?

A single fitting with a history of failures points to something local: the fitting, the lampholder or the connections behind it. Failures spread around the property point to something the lamps have in common, which is usually the lamps themselves and occasionally the electrical supply.

Lamp quality and heat

Modern LED lamps do not have a filament to break. What fails is the small electronic driver in the base, and the thing that kills drivers is heat. A lamp that is fine in an open pendant can run far hotter inside a sealed glass shade, a small enclosed bulkhead or a recessed downlight with insulation packed around it. Many lamps carry a mark saying they are not suitable for enclosed fittings, and it is easy to miss.

Quality varies widely as well. Very cheap multi-packs often use the smallest possible driver components, and a batch bought together tends to fail together, which can look like an electrical fault when it is not. If lamps from one pack are failing in different rooms, try a known brand in one of the affected fittings before assuming the wiring is at fault.

Lampholders and loose connections

In a bayonet or screw lampholder, the lamp is fed through small sprung contacts. With age and heat those contacts lose their spring, tarnish or become pitted. The lamp then makes poor contact, tiny sparks form at the joint, and that arcing shortens the life of every lamp fitted. You may notice the light flicker when the fitting is knocked, or see dark marks on the lamp cap when you remove it.

The same thing can happen one step back, where the circuit cables are terminated in the ceiling rose, the fitting or the switch. A conductor that is not held firmly will heat up under load. This is one of the more important causes to rule out, because a loose connection does not fix itself and can eventually damage the cable or the accessory. Our guide to lights flickering covers the related symptoms.

Replacing a damaged lampholder or remaking connections means working on the fixed wiring, so it is a job for an electrician working to BS 7671, who will also test the circuit afterwards.

Want a fixed written quote? Call 01235 430442 or send us the details.

Dimmers, transformers and drivers

Dimmers designed for older lamps can be hard on LEDs. A dimmer with a minimum load higher than the total of the LED lamps on it may not control them cleanly, and the result can be flicker, buzzing and early failure. The fix is usually a dimmer designed for LED loads, matched to the lamps. We explain the pairing in our guide to dimmer switches and LED lights.

When the supply or wiring is the cause

The mains supply to a home is allowed to vary within a set range. Where the voltage sits towards the top of that range, lamps run a little harder and may not last as long, and this would show as shortened lamp life everywhere in the house. An electrician can measure the voltage, and if it is outside the permitted range the network operator is responsible for correcting it.

A more serious cause is a poor connection on the neutral side of the installation or the incoming supply. That can cause lights to brighten and dim noticeably as other appliances switch on and off. If lights surge brighter as well as dimming, stop using sensitive equipment and call an electrician promptly.

What an electrician will do

A visit for this kind of problem usually starts with the pattern you have noticed, followed by an inspection of the affected fittings with the circuit safely isolated. The electrician will look at the lampholders and terminations, check any transformers and dimmers, and carry out tests on the circuit to confirm that connections are sound and the wiring is in good condition.

If the fitting itself is worn, replacing it is normally straightforward. Like-for-like replacement of a light fitting is not usually notifiable under Part P of the Building Regulations, but it still has to be done safely and tested. Where the investigation turns up older wiring or a board without modern protection, you will be told what was found so that you can decide what to do next. Our lighting installation page explains how we handle new and replacement fittings.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Switch-on is the moment of greatest stress for any lamp, so a lamp that was already close to failing tends to go then. If new lamps fail at switch-on in the same fitting, the lampholder, wiring connections or dimmer should be checked by an electrician.

Yes. When some lamps fail there is a short surge of current that can trip the breaker for the lighting circuit. Replace the lamp and reset the breaker. If the breaker trips again without a lamp failing, have the circuit tested.

The figures on the packaging are based on test conditions with good ventilation. In enclosed or insulated fittings, or on an unsuitable dimmer, the driver runs hotter and the lamp can fail much sooner. Choosing lamps rated for the fitting makes a real difference.

It can be. Repeated failures in one place may mean arcing at the lampholder or a loose connection, both of which generate heat. If you see scorch marks, hear crackling or smell burning, leave the light off and arrange for an electrician to inspect it.

Related pages

CallQuote