Carbon monoxide alarms: choosing one, where to fit it and battery changes
Carbon monoxide has no smell, colour or taste, so an alarm is the only practical warning a household gets. Choosing one is less about finding a single best model and more about picking the right type for the property and putting it in the right place.
Last updated
Short answer
Choose a carbon monoxide alarm certified to BS EN 50291, with a sealed long-life battery or a mains supply, and fit one in every room that has a fuel-burning appliance. Position it at head height or above, between one and three metres from the appliance, following the maker's instructions. Battery alarms can be fitted and maintained by the householder; mains-wired and interlinked alarms should be installed by a qualified electrician.
What to look for when choosing an alarm
A good carbon monoxide alarm is one that has been independently tested, will keep working for its full stated life and will be heard. In practice that means checking for a few things on the box.
- Certification to BS EN 50291, shown with a recognised third-party approval mark.
- A sealed battery that lasts the life of the alarm, or a mains supply with battery backup, so there is no annual battery to forget.
- A clear end-of-life date or indicator.
- A test button, and ideally a memory or display that shows whether carbon monoxide has been detected while you were out.
- Interlinking, by radio or wiring, if you want it to trigger the smoke alarms elsewhere in the house.
Colour-change spot indicators are not a substitute, because they give no audible warning. A combined smoke and carbon monoxide alarm can be useful in a suitable location, but the two hazards do not always call for the same position, so combined units are not right for every room.
Which rooms need one
Carbon monoxide is produced when any carbon-based fuel burns without enough air: gas, oil, coal, wood and LPG. Any room with a boiler, gas fire, open fire, wood-burning stove or oil-fired range is a candidate, and so is a room with a flue running through it.
For rented homes in England, the regulations require landlords to provide a carbon monoxide alarm in any room used as living accommodation that contains a fixed combustion appliance, other than a gas cooker. Building Regulations also call for an alarm when a new or replacement fixed combustion appliance is installed. Many households go further and fit one near bedrooms, so that the alarm will wake people at night. Our guide to smoke alarm regulations covers the related rules for smoke and heat alarms.
Where to position the alarm
Always follow the instructions for your model, because sensors differ. The general guidance is consistent, though.
- In the same room as the appliance, between one and three metres away from it horizontally.
- On the ceiling at least 300 mm from any wall, or high on a wall, above the height of doors and windows but at least 150 mm below the ceiling.
- In bedrooms or rooms remote from the appliance, at about the breathing height of the people who use the room.
- Not in a cupboard, behind furniture or curtains, directly above a cooker or sink, or beside an extractor fan, window or vent.
Very humid or dusty positions shorten the life of the sensor. In a bathroom with a boiler, the manufacturer's instructions should be checked for the minimum distance from the bath or shower.
Want a fixed written quote? Call 01235 430442 or send us the details.
Fitting a battery alarm, and where an electrician comes in
A battery-powered carbon monoxide alarm is designed for the householder to fit. Many can simply stand on a shelf at the right height; others fix to the wall or ceiling with two screws. Before drilling into any wall or ceiling, think about what may be behind the surface, as cables often run vertically and horizontally from switches and sockets.
Mains-powered alarms, and alarms that are hard-wired to interlink with smoke and heat alarms, are part of the fixed electrical installation. They need a suitable supply, correct cable and testing to BS 7671, and where a new circuit is added the work is notifiable under Part P of the Building Regulations. That work should be carried out and certified by a qualified electrician. We fit mains and interlinked alarms as part of our smoke alarm installation service.
An electrician deals with the alarm, not the appliance. The boiler, fire or stove itself should be serviced by a suitably registered heating engineer.
Changing the batteries
Check first whether your alarm has replaceable batteries at all. Many current models are sealed and are simply replaced at the end of their life.
Where batteries are replaceable, the alarm will give a regular chirp when they run low. Slide or twist the alarm from its mounting plate, open the battery compartment, and fit new batteries of the type shown inside, the right way round. Refit the alarm and press the test button until it sounds. It is worth writing the date on the alarm so you know when the batteries were last changed.
A mains-powered alarm with a replaceable backup battery is handled in the same way as a mains smoke alarm: access only the battery compartment and leave the wired base alone. Our guide to changing smoke alarm batteries explains that boundary.
Testing, lifespan and what to do if it sounds
Test the alarm with its button regularly; monthly is a sensible routine. The sensor inside wears out with age, so every alarm has a replace-by date, usually printed on the side or back. When that date arrives, or the end-of-life signal starts, replace the whole unit even if it appears to work.
If the alarm sounds a full alert, treat it as real. Open doors and windows, turn off the appliance if it is safe to do so, get everyone out into fresh air and call the gas emergency service or your fuel supplier's emergency line. Anyone with headaches, dizziness or nausea should seek medical advice. Do not use the appliance again until it has been checked.
Want a fixed written quote? Call 01235 430442 or send us the details.
