How to change the battery in a smoke alarm, including mains-wired alarms
Changing a smoke alarm battery is one of the few jobs on a home's safety systems that a householder is expected to do. It is also one that causes confusion, because alarms differ: some take an ordinary battery, some are sealed for life, and some are wired to the mains with a backup battery inside.
Last updated
Short answer
First identify the alarm type. A battery-only alarm with a replaceable battery opens or twists off its base so the battery can be swapped. A mains-wired alarm may have a replaceable backup battery in a compartment designed for the householder to reach, without touching any wiring. Sealed long-life alarms have no battery to change and are replaced as a whole unit. Always follow the maker's instructions and test the alarm afterwards.
Work out which type of alarm you have
Take a look at the alarm before buying a battery. There are three common arrangements in UK homes.
- Battery-only alarms with a replaceable battery, often a 9-volt block or a pair of AA cells.
- Battery-only alarms with a sealed lithium battery that lasts the life of the alarm. There is no battery door, and the unit is replaced when it reaches its end date.
- Mains-wired alarms, which have a green light showing that mains power is present. Inside is either a replaceable backup battery or a sealed rechargeable cell that is not user-serviceable.
The label on the side or back of the alarm normally gives the model, the battery type and a replace-by date. If the model name is readable, the manufacturer's instructions can usually be found online. Our guide to smoke and heat alarm types explains the differences in more detail.
Changing the battery in a battery-only alarm
Most battery alarms either hinge open or twist anticlockwise off a mounting plate. Use a stable step or ladder rather than a chair, and ask someone to steady it if the ceiling is high.
Remove the old battery, noting which way round it sat, and fit a new one of the type stated on the alarm. Many alarms will not close or refit to their base unless a battery is in place, which is a deliberate safety feature. Close or refit the alarm, then hold the test button until it sounds. If the alarms in the house are interlinked, the others should sound as well.
While the alarm is open, gently clear dust from the vents with a soft brush or the brush attachment of a vacuum cleaner. Dust is a common cause of false alarms.
Changing the backup battery in a mains-wired alarm
A mains alarm is fed from the house wiring, but manufacturers that use a replaceable backup battery design the battery compartment so that the householder can reach it safely. Depending on the model, the battery sits behind a small door or drawer on the face or side of the alarm, or the alarm head slides or twists off a base plate that stays fixed to the ceiling.
The important boundary is this: the base plate and the cables behind it are part of the fixed wiring and should not be opened, loosened or disconnected by anyone other than an electrician. If the instructions for your model say to switch off the alarm circuit at the consumer unit before removing the head, do that, and confirm the green mains light has gone out.
Fit the new battery, refit the head until it clicks home, restore the power if you switched it off and check that the green light returns. Then press the test button. If the battery compartment cannot be found, the head will not release, or you are not sure whether your model has a replaceable battery at all, stop and ask an electrician instead of forcing it.
Want a fixed written quote? Call 01235 430442 or send us the details.
Alarms with no battery to change
Sealed long-life alarms, both battery-only and mains-wired with a rechargeable backup cell, are increasingly common. When one of these starts giving a low-battery chirp, the answer is a new alarm, not a new battery.
Replacing a battery-only unit with another battery-only unit is a simple swap. Replacing a mains-wired alarm is different because the connection to the wiring is involved. Some ranges allow a new head of the same model to be fitted to the existing base, in which case the manufacturer's instructions will say so. Anything that involves disconnecting cables, changing the base or changing to a different make is work on the fixed installation and should be done by a qualified electrician, in line with BS 7671.
Still chirping after a new battery?
If the chirp continues, check the simple things first: that the battery is fresh and the right type, that it is fully seated, and that the alarm has been closed properly. Some alarms keep a low-battery warning in memory until the test button is held for several seconds.
Then consider the age of the unit. Smoke alarms have a working life of about ten years, and an alarm near the end of it may chirp regardless of the battery. In an interlinked system, the alarm that is chirping is not always the one you expect, so listen under each one in turn. Our smoke alarm beeping guide covers the other causes, including dust, humidity and mains power problems.
When to call an electrician
Call an electrician if the green mains light is off on a wired alarm, if alarms no longer trigger each other, if the unit is past its replace-by date and is wired to the mains, or if several alarms have started to fail at once. Those point to the installation, not the battery.
Adding alarms, moving them or converting from battery to mains-wired alarms is installation work. Where it involves a new circuit it is notifiable under Part P of the Building Regulations and has to be certified. Our smoke alarm installation page describes the work we carry out.
Want a fixed written quote? Call 01235 430442 or send us the details.
