Commercial kitchen electrical requirements: a planning guide

A commercial kitchen concentrates more electrical load into a small, hot, wet room than almost any other workplace. Equipment is moved, washed down and run hard for long hours. The electrical installation has to be designed for those conditions from the start.

Last updated

Short answer

A commercial kitchen needs a supply large enough for its combined equipment load, often three-phase; a dedicated, correctly rated circuit and local isolator for each major appliance; accessories and enclosures chosen for heat, grease and water; RCD protection where BS 7671 requires it; and a means of shutting the kitchen down quickly. Extraction, gas interlocks and fire suppression are designed by their own specialists and need coordinated electrical supplies. Part P does not apply, but the Electricity at Work Regulations 1989 do, so installation, testing and maintenance must be carried out by a competent, qualified electrician.

Start with the equipment schedule

The kitchen designer or equipment supplier should provide a schedule listing each appliance, its position, its electrical rating and whether it is single-phase or three-phase. Combination ovens, fryers, dishwashers and induction ranges are substantial loads. Refrigeration runs continuously. Smaller items, mixers, toasters, heated displays, add up quickly along a prep bench.

From that schedule the electrician calculates the maximum demand and compares it with the supply to the unit. Many premises that were previously shops or offices do not have enough capacity, and an upgrade has to be requested from the distribution network operator. This is the longest lead-time item in most kitchen fit-outs, so it should be raised before a lease is signed where possible.

Three-phase supplies and distribution

Larger cooking appliances are commonly three-phase, and spreading single-phase loads across three phases keeps the supply balanced. A dedicated distribution board for the kitchen, positioned outside the cooking area in a dry, accessible place, keeps protective devices away from heat and grease and gives staff one clearly labelled point of control. Our page on three-phase and distribution boards covers what is involved.

Circuits and isolation

Each major appliance has its own circuit, sized for its rating and the cable route. Each also needs a means of isolation close by, so that it can be made safe for cleaning or servicing without switching off the rest of the kitchen. Isolators are positioned where they can be reached without leaning over hot equipment and where they will not be hidden when appliances are pushed back.

Appliances on castors that are moved for cleaning are connected by suitable flexible cables with plugs and sockets of the industrial type, restrained so that the cable is not strained when the appliance is pulled out. General-purpose sockets for small appliances are provided in generous numbers at worktop height, on circuits separate from the heavy equipment.

Protection against water, grease and heat

Kitchens are cleaned with water and chemicals, sometimes with hoses. Accessories, enclosures and light fittings are chosen with a rating for protection against water and dust that suits the cleaning method; our guide to IP ratings explains the codes. Cable routes avoid the hottest zones above cooking equipment, and containment is selected so that it can be wiped down and does not trap grease.

RCD protection is provided for socket-outlets as BS 7671 requires, and is commonly applied more widely given the environment. Dividing circuits between several protective devices limits how much of the kitchen is lost when one trips during service.

Want a fixed written quote? Call 01235 430442 or send us the details.

Emergency shutdown

Staff need to be able to cut power to cooking equipment quickly. The arrangement depends on the size and layout of the kitchen, and may include clearly marked emergency stop controls near the exits that disconnect the cooking appliances while leaving lighting and extraction running. The requirement and its scope are set by the kitchen designer and risk assessment; the electrician designs the control circuit to deliver it.

Extraction, gas interlocks and fire suppression

The extraction canopy and its fans need their own supplies and controls. Where gas appliances are used, the ventilation is normally interlocked with the gas supply so that gas cannot flow unless extraction is running. That interlock system is specified and commissioned with a Gas Safe registered engineer; the electrician provides the supplies and wiring it needs. Fire suppression systems in canopies, where fitted, are installed by specialists and may need to shut down electrical equipment when they operate. All of this has to be agreed between the trades before first fix, not discovered at commissioning.

Lighting

Kitchen lighting needs to be bright, even and easy to clean. Sealed fittings with diffusers that contain any broken parts are the norm above food preparation areas. Emergency lighting on the escape routes is specified from the fire risk assessment. For the options, see commercial lighting.

Testing and maintenance

A new installation is inspected, tested and certified before the kitchen opens. After that, the harsh environment justifies more frequent attention than an office: periodic inspection of the fixed installation at the interval the certificate recommends, testing of portable and movable appliances at intervals set by risk assessment, and prompt repair of damaged flexes, plugs and isolators. Under the Electricity at Work Regulations 1989 the operator is responsible for keeping the system safe. Our commercial kitchen electrics page describes how we help.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Not always, but many do. It depends on the combined rating of the equipment. Larger ovens, ranges and dishwashers are often three-phase appliances.

Each fixed appliance should have a means of isolation nearby so it can be made safe for cleaning and servicing without shutting down the whole kitchen.

The interlock is specified and commissioned with a Gas Safe registered engineer. The electrician provides the electrical supplies and associated wiring.

No. Part P covers dwellings. Commercial kitchens fall under the Electricity at Work Regulations 1989, with the installation designed and tested to BS 7671.

The installation certificate or last condition report states the recommended interval. Appliance testing intervals are set by risk assessment and are typically shorter in kitchens.