Commercial lighting controls: sensors, daylight dimming and timers
Changing to LED fittings cuts the energy used by lighting while it is on. Controls address the other half of the problem: lighting that is on when nobody needs it, or brighter than it needs to be.
Last updated
Short answer
Commercial lighting controls fall into four groups: occupancy or absence detection, which switches lighting according to whether a space is in use; daylight-linked dimming, which reduces output near windows; time control, for areas with predictable hours; and manual or scene control for rooms with changing uses. They may be built into each fitting or run as a networked system. Building Regulations Part L sets expectations for controls in new and refurbished non-domestic lighting. Controls are part of the fixed installation under BS 7671; Part P does not apply to commercial premises, but design and installation call for a qualified electrician.
Occupancy and absence detection
A presence detector switches lighting on when it senses someone and off again a set time after the last movement. That suits spaces people pass through with their hands full or where a wall switch would be inconvenient: corridors, stores, toilets and warehouse aisles.
An absence detector leaves switching on to the occupant, by a wall switch, and switches off automatically when the space has been empty for the set period. This small difference matters. In an office with good daylight, people often do not switch the lights on at all, so absence detection saves more than presence detection and avoids lights coming on for someone walking past an open door.
Sensor types
Passive infrared sensors respond to body heat moving across their field of view. They are reliable where they have a clear line of sight and where people move reasonably often, but they cannot see through partitions or racking and may miss someone sitting very still.
Microwave sensors emit a low-power signal and detect movement from the change in its reflection. They are more sensitive, cover larger areas and can detect through thin partitions, glass and some ceiling materials. That is useful in awkward spaces and a drawback where it means lights are triggered by movement in the next room. High ceilings in warehouses need sensors with lenses designed for the mounting height. Selection and positioning are part of the design.
Daylight-linked dimming
A photocell measures the light level in a space and dims the fittings to hold it steady, so that as daylight increases the electric lighting falls away. The benefit is concentrated on the fittings nearest the windows and under rooflights, and it is usual to control those rows separately from fittings deeper in the room.
Done well, the change is gradual and goes unnoticed. Done badly, with a sensor that sees its own fittings or a response that is too fast, the lights hunt up and down.
Time control
Where hours are predictable, a time switch or the timing function of a control system is simple and effective: shop window and signage lighting, car parks, external security lighting, and general lighting in premises that close at a fixed time. Override arrangements are needed for cleaners, late working and stocktakes, and they should reset themselves so that an override does not become permanent.
Manual and scene control
Meeting rooms, training rooms, restaurants and shop floors need different lighting at different times. Scene control lets a group of fittings be recalled at preset levels from a simple button panel: presentation, meeting, cleaning. Good manual control is still a control strategy. Switches should be where people expect them, clearly labelled, and should divide the space so that part of a room can be lit without the whole.
Want a fixed written quote? Call 01235 430442 or send us the details.
Standalone or networked
The simplest controls are self-contained. A fitting with an integral sensor, or a sensor wired to a small group of fittings, needs no programming beyond setting the time delay and light level. This suits corridors, stores, toilets and small offices and is easy to retrofit.
Networked systems connect fittings and sensors by a control cable or wireless link so that each fitting can be addressed and grouped in software. Digital protocols widely used for this allow dimming, grouping, scenes, and in some systems monitoring of energy and emergency fittings. They cost more and need commissioning, and they come into their own in larger offices and buildings where layouts change. Dimmable control requires fittings with compatible drivers, which must be specified when the fittings are chosen.
Where controls suit each type of building
- Offices: absence detection in open areas and rooms, daylight dimming at the perimeter, presence detection in circulation and toilets.
- Warehouses: presence detection aisle by aisle, with daylight control under rooflights.
- Shops: time control for windows and signage, scene control on the sales floor, presence detection in stock rooms.
- Schools and community buildings: absence detection in classrooms, with manual control near the whiteboard.
- External areas: photocell with time switch, and presence detection for security lighting.
Regulations and safety
Approved Document L sets efficiency standards for lighting in new non-domestic buildings and when lighting is replaced, and credits or expects appropriate controls. The designer or installer confirms what applies to a given project. Controls must never switch off emergency lighting, and escape routes should not be plunged into darkness by a sensor timing out; emergency fittings keep a permanent supply. On stairs and around machinery, time delays and minimum light levels are set with safety in mind.
Commissioning and handover
A control system is only as good as its settings. Time delays that are too short irritate people until someone defeats the sensor; delays that are too long waste the saving. After installation, sensors are aimed, delays and light levels are set, and the result is checked with the people who use the space. A short written description of what controls what should be left with the building records. Our commercial lighting page and our guide to commercial LED lighting upgrades explain how controls fit into a wider project.
Want a fixed written quote? Call 01235 430442 or send us the details.
