The consumer unit, still widely called the fuse box, is the one piece of electrical equipment every household should understand a little. Knowing what each device does makes a tripped circuit less alarming and a conversation with an electrician more useful.

Last updated

Short answer

A modern consumer unit contains a main switch that isolates the whole installation, circuit breakers that protect each circuit against overload and short circuit, and residual current devices that disconnect the supply if current leaks to earth. Newer boards may combine those functions in RCBOs and add surge protection. You can safely operate the switches, press the RCD test button and read the labels. Anything behind the cover, and any replacement of the unit, is work for a registered electrician: it must meet BS 7671 and a consumer unit replacement is notifiable under Part P.

The main switch

The main switch is usually the largest device, at one end of the board, and is often marked with a red toggle. Switching it off disconnects every circuit in the house from the supply. It does not make the incoming cables, the meter or the terminals feeding the switch dead; those remain live and can only be isolated by the electricity network or supplier. That is why the cover of the consumer unit should never be removed by anyone who is not trained to work there.

Circuit breakers

Each circuit has a miniature circuit breaker, or MCB. Its job is to protect the cable. If a circuit is overloaded, the breaker trips after a delay that depends on how severe the overload is. If there is a short circuit, it trips almost instantly. The number on the breaker is its current rating, chosen to suit the cable and the type of circuit: lower ratings for lighting, higher for sockets, cookers and showers.

A breaker is reset by pushing the toggle back up. If it trips again at once, or repeatedly, leave it off. Fitting a breaker with a higher rating to stop it tripping is dangerous, because the cable it protects has not changed.

Residual current devices

A residual current device, or RCD, compares the current flowing out on the live conductor with the current returning on the neutral. If they differ by more than a small amount, current is escaping somewhere, possibly through a person, and the device disconnects in a fraction of a second. An MCB cannot do this: the current involved in a dangerous shock is far too small to trip it.

On many boards one RCD protects a group of circuits, so a fault on any of them switches off the whole group. That is why a faulty appliance in the kitchen can take out the upstairs sockets as well. Our guide to an RCD that keeps tripping explains how to narrow down the cause safely.

RCBOs

An RCBO combines the functions of an MCB and an RCD in one device serving a single circuit. A board fitted with RCBOs throughout gives every circuit its own shock protection, so a fault on one circuit leaves the others on. They look similar to MCBs but have a small test button. The differences are set out in our guide to RCD vs RCBO.

Surge protection and arc fault devices

Recent consumer units often include a surge protection device, which diverts short voltage spikes caused by lightning or switching on the network before they reach sensitive electronics. It usually has an indicator window showing whether it is still serviceable. Some boards also include arc fault detection devices, which look for the electrical signature of arcing in damaged cables or loose connections. Both are assessed as part of the design when a board is installed under the current edition of BS 7671.

Want a fixed written quote? Call 01235 430442 or send us the details.

Older boards

Not every home has the arrangement described above. Older fuse boards may contain rewireable fuses, with a length of fuse wire held between two screws, or cartridge fuses in pull-out carriers. Some have MCBs but no RCD at all, and some have a wooden back or a plastic enclosure that has discoloured with heat. These boards may still function, but they offer less protection than a modern unit. If yours has no device with a test button, read our guide on whether you need a new consumer unit.

Reading the labels

Each device should be labelled with the circuit it serves, and there should be a circuit chart inside or beside the board. Labels are often vague or out of date after years of alterations. If yours are, it is worth having them corrected when an electrician is next on site: in an emergency, knowing which switch controls the cooker or the immersion heater matters. Other notices you may see include the date the next inspection is recommended and a reminder to test the RCD.

What you can do yourself

  • Switch individual circuits or the whole installation off and on.
  • Reset a tripped device once, after unplugging anything you suspect.
  • Press the test button on each RCD and RCBO periodically; the device should trip immediately and reset normally.
  • Keep the area in front of the board clear and the cover closed.
  • Note any buzzing, heat, scorch marks or smell and report it.

If a test button does not trip the device, or a device will not reset, that is a fault to have checked promptly.

What needs an electrician

Adding a circuit, changing a device, investigating heat or noise, and replacing the board all involve work inside the enclosure. In England and Wales, replacing a consumer unit and adding a circuit are notifiable under Part P, and the work is tested and certified to BS 7671. Our consumer unit upgrades page describes what a replacement involves.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

An MCB protects a circuit's cable against overload and short circuit. An RCD protects people by disconnecting when current leaks to earth. Most installations need both functions.

Follow the notice on your consumer unit; around every six months is commonly advised. The device should trip at once and then reset.

No. The incoming supply terminals remain live. Only a qualified electrician should remove the cover.

That switch is probably an RCD protecting a group of circuits. A fault on any one of them trips the whole group.

Yes. In England and Wales it is notifiable under Part P and should be carried out and certified by a registered electrician.