Dimmer switches and LED lights: getting them to work together
Dimmers that worked perfectly with halogen lamps often misbehave once LEDs are fitted: flicker at low levels, a buzz from the switch, lights that glow when off or a dimmer that does almost nothing. The cause is nearly always a mismatch between the dimmer and the lamps rather than a fault in either.
Last updated
Short answer
LED lamps draw a small fraction of the power of the halogen lamps most older dimmers were designed for, and they contain electronics that react differently to the way a dimmer chops the supply. For smooth dimming you need lamps or drivers marked as dimmable, a dimmer designed for LED loads, and a total load that falls between the dimmer's minimum and maximum for LEDs. Changing a dimmer is not notifiable under Part P, but it involves working on the fixed wiring, so it must be done with the circuit safely isolated and to BS 7671; if the wiring is old or has no earth, use an electrician.
Why old dimmers struggle with LEDs
A traditional dimmer reduces brightness by switching off part of each cycle of the mains waveform. A halogen lamp is a simple heated filament and responds smoothly. An LED lamp contains a driver, a small electronic power supply, which tries to maintain a steady output and may interpret the chopped waveform unpredictably.
There is also the matter of load. A dimmer needs a minimum amount of current flowing through it to work properly. Six halogen downlights presented a substantial load. Six LED replacements may draw less than the dimmer's minimum, so it never operates in its stable range. The symptoms are flicker, lamps that flash when switched on, or dimming that only works across a narrow part of the dial.
Leading edge and trailing edge
Dimmers are described by which part of the waveform they cut. Leading-edge dimmers are the older, simpler design, built for filament lamps and wire-wound transformers. Trailing-edge dimmers use more sophisticated electronics, switch more gently and have a lower minimum load, which makes them a better match for most LED lamps and drivers.
Many current dimmers are sold specifically as LED dimmers. Some allow the installer to adjust the minimum brightness so that the lamps do not drop out or flicker at the bottom of the range. That small adjustment often makes the difference between a dimmer that is merely compatible and one that is pleasant to use.
Reading the ratings
A dimmer may be marked with a large figure for filament lamps and a much smaller one for LEDs. It is the LED figure that matters. LED drivers draw a brief surge when switched on, so manufacturers limit the LED load to well below the headline rating. Add up the wattage of every lamp on the dimmer and check that the total falls comfortably within the LED range, above the minimum and below the maximum.
Lamp manufacturers often publish lists of dimmers they have tested with their products. Where a room is being fitted out from scratch, choosing lamps and dimmers from a tested combination is the most reliable approach. Our guide to downlight installation costs covers the other choices involved in a downlight layout.
Common symptoms and likely causes
| Symptom | Likely cause |
|---|---|
| Flicker at low brightness | Load below the dimmer minimum, or minimum level not set |
| Buzzing from the switch or lamps | Leading-edge dimmer on an LED load, or dimmer overloaded |
| Lamps glow faintly when off | Small leakage current through the dimmer or switch wiring |
| Dimmer has little effect | Non-dimmable lamps or driver fitted |
| One lamp behaves differently | Mixed lamp types or a failing lamp |
Flicker that affects lights on ordinary switches as well, or that comes and goes when other appliances start, has different causes. Those are covered in our guide to lights flickering and should be investigated rather than ignored.
Want a fixed written quote? Call 01235 430442 or send us the details.
Integrated fittings and separate drivers
Not all LED lighting uses replaceable lamps. Integrated downlights, LED tape and many decorative fittings are supplied by a separate driver, and it is the driver that determines whether and how the lighting can be dimmed. Some drivers dim from a standard mains dimmer; others need a dedicated control signal and will not respond to a wall dimmer at all. This needs to be established before the fittings are ordered, because changing the driver later may not be possible.
Two-way switching and smart dimmers
Where a light is controlled from two positions, such as the top and bottom of a staircase, only one position can normally hold a conventional rotary dimmer, with an ordinary switch at the other. Some systems allow dimming from both ends using matched units. Electronic and app-controlled dimmers often need a neutral conductor at the switch, which many older switch positions do not have. An electrician can check what is at the switch before you buy.
When to call an electrician
Replacing a dimmer is not notifiable under Part P, but the switch is part of the fixed wiring covered by BS 7671. Call an electrician if the switch box is shallow or crowded, the cable insulation is perished, there is no earth at the switch and you want a metal plate, the dimmer is warm or smells hot, or the problem persists after lamps and dimmer have been matched. A dimmer that is running hot is being asked to do something it was not designed for and should be taken out of use. For new lighting schemes, see our lighting installation service.
Want a fixed written quote? Call 01235 430442 or send us the details.
