Skip to content
Adtec Electrical Services

What Affects What an Electrician Charges?

Hourly rates, call-out charges and fixed quotes explained, so you can compare prices fairly and get better value from a visit.

People search for an electrician's hourly rate hoping for a single number. In practice, what you pay depends on how the job is priced, how long it really takes and what has to be done before and after the visible work. This guide explains the main factors so you can compare quotes on a like-for-like basis. We don't publish prices; every job is quoted individually.

Want a written quote rather than an estimate? Call 01235 430442 or send us the details.

Day rates, hourly rates and fixed quotes

Electricians price work in three common ways. An hourly or day rate charges for time on site plus materials. A call-out charge covers attending and a first period of work, often used for faults. A fixed quote sets a total for a defined scope of work. Fixed quotes suit jobs that can be seen and measured, such as adding sockets or replacing a consumer unit. Time-based pricing suits work where the scope isn't known until investigation starts, such as tracing an intermittent trip.

Materials

Cable, accessories, light fittings, protective devices and fixings all add up. The quality of what is specified matters: a basic socket and a decorative metal one look similar on paper but are priced very differently. A good quote either lists the materials or makes clear what standard is allowed for.

Access and the building

How easy it is to run cables makes a big difference. A loft with good access above the room, or floorboards that lift easily, keeps time down. Solid floors, finished plaster, high ceilings, tight voids and furniture-filled rooms slow things down. Period properties often have obstacles that newer houses don't. Making good afterwards, filling and patching chases, is another item to check: some quotes include it, others leave it for a decorator.

Testing and certification time

Every new circuit and every addition must be tested and recorded on a certificate. That means measurements on the circuit, checks on the protective devices and paperwork afterwards. It is an essential part of the job, not an extra, and it is one of the reasons a very cheap quote can be misleading. Our page on installation certificates explains which document you should receive.

The state of the existing installation

New work has to connect to what is already there. If testing reveals an existing fault, or the consumer unit can't safely take a new circuit, extra work may be needed before the job can be finished. A careful electrician will explain this before going ahead rather than surprise you on the invoice.

Bundling small jobs

Travel, setting up and testing take a share of every visit, whatever the size of the job. If you have several small tasks, an extra socket here, a new light there, a fan that has stopped, booking them together usually works out better value than separate visits. Make a list before you call.

Getting comparable quotes

Ask each electrician for a written quote describing the work, materials, testing and certification, making good, and anything excluded. Compare the scope, not just the total. Our guide on how to choose an electrician covers the other questions worth asking.

Faults are harder to price

Fault finding is the one area where a fixed figure up front is rarely possible, because nobody knows the cause until testing starts. Expect time-based pricing, and ask the electrician to call you before going beyond an agreed limit. Our fault finding page explains how we approach it.

Talk to us

Adtec Electrical Services Ltd has been carrying out electrical work since 2014 from Lyford Business Centre near Wantage. Lines are open Monday to Friday, 7:30am to 5:30pm, on 01235 430442.

Timing and planning

Work that fits around other trades, such as first fix during a renovation, is usually quicker than the same job in a finished, furnished room, because cables can be run before walls are plastered and floors laid. If you are planning building work, involve the electrician early. Last-minute changes after plastering cost more than the same change made on the drawing. Clear access on the day, with furniture moved and the consumer unit reachable, also saves time you would otherwise pay for.

Domestic and commercial work

Commercial jobs are priced in a similar way but often involve drawings, programmes, out-of-the-way containment routes and coordination with other contractors, which all show up in the price. Domestic smaller works are usually simpler to scope from a site visit or a few photos.

Got a list of jobs? See our domestic electrical services or ask for a quote.

Frequently asked questions

Without seeing the job, any figure is a guess. Photos and a description narrow it down, but access, existing wiring and testing all affect the time needed.

Some electricians charge one, particularly for fault finding where the time needed isn't known. Ask what it covers before booking.

A fixed quote gives certainty for a defined job. A day rate suits work where the scope isn't clear yet, such as tracing an intermittent fault.

Testing and certification take real time on site and are part of doing the job properly. A quote that leaves them out isn't comparable.

Sometimes, but check that the fittings are suitable and that the electrician is happy to fit them. Their quote may then exclude any warranty on those items.

Want a price for your job?

Call 01235 430442 (Monday to Friday, 7:30am to 5:30pm) or send us the details.

Related pages

CallQuote