Skip to content
Adtec Electrical Services

What does an electrician do? The work, the types and who to call

Most people only think about electricians when something stops working. The trade is much wider than repairs, and understanding what an electrician does, and does not do, makes it easier to call the right person and to describe the job when you ring.

Last updated

Short answer

An electrician designs, installs, tests, maintains and repairs fixed electrical installations: the wiring, consumer units, sockets, lighting and equipment supplies in buildings. They also inspect existing installations and issue the certificates and reports that show the work is safe. In the UK the work is carried out to BS 7671, the national wiring standard, and much domestic work also falls under Part P of the Building Regulations.

The four main parts of the job

Whatever the building, an electrician's work falls into four broad activities.

  • Design. Working out what circuits are needed, the cable sizes, the protective devices and how everything is arranged so that it is safe and practical to use.
  • Installation. Running cables and containment, fitting accessories, distribution boards and equipment, and connecting it all.
  • Inspection and testing. Proving with instruments that the installation is safe, both when it is new and periodically through its life.
  • Maintenance and repair. Finding faults, replacing worn parts and keeping systems working.

On a small job one person does all four in an afternoon. On a large project they may be split between designers, installation teams and a testing engineer, but the same stages are there.

Domestic, commercial and industrial work

Electricians are often described by the kind of building they work in, and the day-to-day work differs more than people expect.

Domestic electricians work in houses and flats: additional sockets, lighting, consumer unit replacements, rewires, showers, cookers, outdoor power and smoke alarms. The work is usually on a single-phase supply, in finished and occupied homes, so care with decoration and clear communication matter as much as technical skill.

Commercial electricians work in offices, shops, schools and similar premises. Here there is more containment such as trunking, tray and basket, more lighting control, emergency lighting, data cabling and three-phase distribution. Work is often planned around trading hours and coordinated with other trades.

Industrial electricians work in warehouses, workshops and factories, dealing with larger supplies, machinery, armoured cables and high-level lighting. Many contractors, ourselves included, cover more than one of these areas.

What happens on a typical installation job

Take a new circuit as an example. The electrician first looks at the existing installation: the earthing, the consumer unit and whether there is capacity for the addition. They choose a cable route and size, install the cable and accessories, and connect the circuit to a suitable protective device.

Before the circuit is energised, a series of dead tests confirms that the conductors are continuous, correctly connected and properly insulated. Once it is live, further tests check that a fault would be disconnected quickly enough and that residual current devices operate within their limits. Only then is the circuit put into service and the paperwork completed.

That testing is the part customers rarely see, and it is a large part of what separates professional work from a job that merely appears to function.

Inspection, testing and certificates

Electricians produce documents as well as installations. New circuits and consumer unit changes are recorded on an Electrical Installation Certificate, and smaller alterations on a Minor Works Certificate. Existing installations are assessed with an Electrical Installation Condition Report, which landlords need at set intervals and which businesses and homeowners use to understand the state of their wiring.

Some domestic work in England, including new circuits and replacement consumer units, is notifiable under Part P of the Building Regulations. Electricians registered with a competent person scheme can notify that work themselves; otherwise it goes through building control. Our guide to EIC and Minor Works certificates explains which document applies when, and what is an EICR covers condition reports.

Want a fixed written quote? Call 01235 430442 or send us the details.

Fault finding

Fault finding is investigative work. The symptom, such as a tripping device, a dead socket or a flickering light, is only the starting point. The electrician gathers the history, isolates sections of the installation, and uses test instruments to narrow the cause down to a cable, a connection, an accessory or an appliance.

It can take ten minutes or several hours, and it is not always possible to predict which at the outset. A good electrician will explain what they have found, what they have ruled out and what the options are. Our fault finding page describes how we approach it.

What an electrician does not do

A few things near the electrics belong to other people. The cable into the property, the main fuse and its sealed housing belong to the local network operator. The meter belongs to your electricity supplier. Electricians do not break those seals; if the supply needs upgrading or the meter moving, they liaise with the organisation responsible.

Gas appliances are for gas engineers, even where an electrician provides the electrical supply to a boiler or its controls. Fire alarm systems in commercial buildings, intruder alarms and specialist IT equipment are often handled by firms that specialise in them, with the electrician providing power and cabling routes.

Equally, there is work that should not be done by anyone other than an electrician. New circuits, consumer units, showers, electric vehicle chargers and anything in a bathroom or outdoors should be installed, tested and certified by a qualified electrician. Our guide to DIY electrical work rules sets out where the line sits.

Choosing one for your job

Match the electrician to the work. Ask whether they regularly do your kind of job, what certificate you will receive, and how notification will be handled if the work is notifiable. For more on comparing firms, see how to choose an electrician.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Typical domestic work includes extra sockets and lights, replacing consumer units, rewiring, supplies for showers, cookers and car chargers, outdoor power and lighting, smoke alarms, fault finding and electrical inspections.

The principles are the same, but commercial work involves three-phase supplies, containment systems, emergency lighting and working around a business. Domestic work is in occupied homes on smaller supplies. Many contractors do both.

Yes. Testing is a required part of every installation job under BS 7671. The results are recorded on the certificate you are given at the end.

No. The meter belongs to the supplier and the main fuse to the network operator. An electrician can prepare the installation on your side and coordinate with them, but cannot move their equipment.

Like-for-like replacements are not notifiable, but they still involve the fixed wiring and need to be done safely and checked. If you are not competent to isolate and test the circuit, use an electrician.

Related pages

CallQuote