Skip to content
Adtec Electrical Services

Emergency lights for the home: when they are needed and what to fit

Emergency lighting is usually thought of as a workplace requirement, but it has a place in some homes too. The answer depends on whether the building is a single household, a shared house or a block with communal areas.

Last updated

Short answer

A single-family house or flat in the UK is not generally required to have emergency lighting. It becomes a fire-safety matter in houses in multiple occupation and in the shared stairs and corridors of blocks of flats, where the landlord or managing agent is responsible and the fire risk assessment decides what is needed. In an ordinary home it is an optional safety measure: plug-in rechargeable lights are the simple choice, while hard-wired fittings that come on automatically when the power fails should be installed by a qualified electrician to BS 7671.

Is emergency lighting a legal requirement at home?

For a house or flat occupied by one household, no. The Building Regulations and fire-safety law in England and Wales concentrate on smoke and heat alarms and on escape routes in that setting, not on lighting that works during a power failure.

The position changes where people who are not one household share a way out. The Regulatory Reform (Fire Safety) Order 2005 applies to the common parts of buildings containing flats and to the shared areas of houses in multiple occupation. The person responsible, usually the landlord, freeholder or managing agent, must have a fire risk assessment, and that assessment considers whether occupants could find their way out safely if the normal lighting failed. HMO licence conditions set by the local council often address emergency lighting as well.

This guide is general information, not legal advice. If you are responsible for a shared building, the fire risk assessor and the council's housing team are the people to confirm what applies to it.

Shared houses and blocks of flats

Where a risk assessment calls for emergency lighting, it is normally designed in line with BS 5266-1, the code of practice for emergency lighting of premises. The aim is to light the escape route: stairs, landings, changes of level and direction, final exit doors and the positions of fire alarm call points and fire-fighting equipment where these are provided.

Whether a small shared house needs it at all is a matter of judgement. A short, simple route with good borrowed light from street lamps may be assessed differently from a tall building with a long internal staircase and no windows. Larger or more complex buildings are far more likely to need a full system. Inside each individual flat, emergency lighting is not normally expected.

The requirements for commercial and communal premises are covered in more depth in our emergency lighting regulations guide.

Options for an ordinary house

Many people asking about emergency lights for the home simply want to avoid being left in the dark during a power cut, or want an older relative to be able to reach the stairs safely. There are two broad approaches.

Plug-in rechargeable lights

These sit in a socket, keep a small battery charged and switch on when the socket loses power. Many lift out to be used as a torch. They need no installation, but they occupy a socket, are easy to unplug by accident and only give a modest pool of light.

Hard-wired self-contained fittings

These are the same kind of fitting used in commercial buildings, in a more discreet form: a ceiling or wall light with its own battery, connected permanently to the lighting circuit. A non-maintained fitting stays off in normal use and lights when its supply fails. A maintained fitting works as an everyday light and carries on from its battery when the power goes. Emergency versions of some downlights and bulkhead fittings are available, so the result need not look like an office corridor.

Want a fixed written quote? Call 01235 430442 or send us the details.

Where fittings are most useful

  • The top and bottom of the staircase, so every tread is visible.
  • Hallways and landings that have no window.
  • At the consumer unit, so a tripped device can be seen and reset safely.
  • Cellars, basements and internal garages with a single way out.
  • The route from a bedroom to the bathroom for anyone unsteady on their feet.

A fitting connected to the local lighting circuit has a useful property: it comes on when that circuit loses power for any reason, including a tripped breaker, not only when the whole street is off. That is often exactly when a householder most needs light at the consumer unit.

Installation, BS 7671 and Part P

Hard-wired emergency fittings are fixed electrical equipment. They must be installed and tested in accordance with BS 7671 by a competent, qualified electrician, who will check that the circuit they are added to is in sound condition, correctly protected and properly earthed. Older lighting circuits without an earth conductor, or without RCD protection where it is now required for the alteration, may need work before anything is added.

Under Part P of the Building Regulations in England, adding a light fitting to an existing circuit is not usually notifiable, but a new circuit is, and so is work in certain zones of a room containing a bath or shower. Wales has slightly different rules. A registered electrician can tell you which category your job falls into and should issue the appropriate certificate either way. Fittings near baths and showers also need a suitable rating for the zone they are in.

We do not recommend connecting these fittings yourself. A unit that is wired incorrectly may appear to work and then fail to switch over when it matters.

Testing and battery life

Emergency lights are only worth having if they work on the day. In communal and commercial settings it is common practice under BS 5266 to carry out a brief function test each month and a full-duration discharge test once a year, and to keep a logbook. The fire risk assessor should confirm the routine for a particular building.

In a private house there is no set regime, but the same idea applies on a smaller scale. Many fittings have a small indicator showing the battery is charging; glance at it from time to time. Switching off the lighting circuit briefly at the consumer unit shows whether each unit lights. Batteries wear out, and a fitting that fades quickly needs its battery or the whole unit replaced by an electrician.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Not by law if it is a single household. It is an optional safety measure. It may be required in a house in multiple occupation or in the communal areas of a block of flats, where the fire risk assessment and any licence conditions decide what is needed.

It depends on the type of property. For an ordinary single let it is not generally required. For HMOs and buildings with shared escape routes, the landlord or managing agent must follow the fire risk assessment and the local council's licensing conditions, which may call for it.

We advise against it. Fixed electrical work must meet BS 7671, and some of it is notifiable under Part P. A qualified electrician will confirm the circuit is suitable, install the fitting, test it and certify the work.

It depends on the fitting's rated duration and the age of its battery. The duration is stated by the manufacturer, and systems in shared buildings are specified to suit the building. Batteries lose capacity over the years, which is why periodic testing matters.

A self-contained fitting lights when its own supply fails. If it is connected to the local lighting circuit, it will come on when that circuit trips as well as during a wider power cut.

Related pages

CallQuote