Emergency lighting regulations: what businesses need to know
A practical explanation of the rules, the risk assessment and the paperwork behind emergency escape lighting.
Last updated
Short answer
Emergency escape lighting is required where necessary to keep people safe under fire safety law in England and Wales. The fire risk assessment determines the provision your premises need. Monthly function checks and annual full-duration tests are commonly followed under BS 5266; confirm the appropriate programme with your fire risk assessor. This is general information, not legal advice.
What emergency lighting is for
Emergency lighting helps people find and follow an escape route when the normal lighting supply fails. It is different from ordinary lighting that makes a shop, office or workshop comfortable to use. A room can look well lit during a working day yet become difficult to leave when the supply is interrupted, especially if corridors, stairs or internal rooms have little daylight.
The question is not simply whether a building has illuminated exit signs. People need to identify changes of direction, hazards and the route to a place of safety. The layout, occupants and activities matter. Ask a qualified electrician to assess the electrical installation alongside the advice of your fire risk assessor, rather than choosing fittings from a photograph.
The law in England and Wales
The Regulatory Reform (Fire Safety) Order 2005 places duties on the responsible person for premises within its scope. Article 14 on legislation.gov.uk says emergency routes and exits requiring illumination must be provided with emergency lighting of adequate intensity if their normal lighting fails. That is a risk-based duty, not a rule that every room must contain an identical fitting.
The responsible person must consider the premises and the people using them. The GOV.UK fire risk assessment checklist includes emergency lighting among the fire safety provisions to consider. If you lease a unit, establish which escape routes are managed by you and which are shared with other occupiers. A lease arrangement does not remove the need to coordinate safety.
Where BS 5266 fits into the picture
British Standard BS 5266-1 is the code of practice for emergency lighting of premises. It supports decisions about suitable provision and management; it is not the same document as the Fire Safety Order. A standard provides a recognised technical framework, while the legal duty concerns protecting people in the circumstances of the building.
Ask the designer or assessor which current standards and guidance they are applying. Avoid treating an old certificate, a supplier brochure or a generic checklist as proof that the present layout is suitable. If the building has been extended or partitioned, the original emergency lighting arrangement may no longer follow the escape routes actually used.
The commonly followed testing routine
Monthly function tests and an annual full-duration test are commonly followed under BS 5266. A function test checks that emergency lights operate when the normal supply is interrupted using the appropriate test arrangement. A full-duration test checks operation for the system’s rated duration. Confirm the programme, responsibilities and safe procedure with your fire risk assessor and maintenance provider.
Oxford City Council’s emergency-lighting maintenance guidance describes monthly and annual checks and a logbook in its HMO context. It is an official example of the routine, not a substitute for commercial-premises assessment. Do not assume every system has the same rated duration or that pressing a switch briefly demonstrates battery endurance. Our emergency lighting testing guide covers organising the checks.
Planning tests without creating a new risk
Testing needs thought about when the premises are occupied and what happens afterwards. Batteries used in a full-duration test need time to recharge. During that period, the system may not provide its normal backup. Agree timing and temporary precautions with the person responsible for fire safety before a test starts, particularly where occupants cannot easily leave.
Use the intended test controls and a safe, documented method. Do not remove covers, interfere with live wiring or switch off unfamiliar circuits to experiment. Automatic self-test systems can help record results, but someone still needs to review faults and arrange action. A system reporting a fault is not maintained merely because its display has been acknowledged.
Want a fixed written quote? Call 01235 430442 or send us the details.
What to keep in the log book
The log book should identify the premises, the system and the lights being checked. Record when a check took place, who carried it out, what was checked, the result and any defects. Follow up with the repair, replacement or other action taken and the subsequent check. Clear identification makes it possible to find a defective fitting again.
Keep design and installation information, previous certificates and maintenance records together. Electronic records can be useful if they remain accessible to the responsible person and the assessor. Avoid a record that says only “passed” without showing the scope. If areas were inaccessible or a check could not be completed safely, record that limitation and arrange the outstanding work.
When alterations call for another assessment
New partitions, storage racks, different entrances and changes of use can alter how people move through a building. A light positioned for an open office may not illuminate a corridor created by a fit-out. High storage can obscure light or signs, while a relocated exit can make an existing sign misleading. Review the fire risk assessment when arrangements change.
Discuss planned changes before the new layout is finished. It is easier to coordinate escape lighting with commercial lighting installations than to discover missing provision after decorating. Do not assume that replacing a fitting with a brighter normal light addresses the emergency function; the design needs to consider operation when the normal supply fails.
Emergency lighting is separate from an EICR
An electrical installation condition report examines the fixed electrical installation. It is not a replacement for assessing emergency lighting coverage or completing the appropriate function and duration checks. Similarly, a successful emergency lighting test does not establish the condition of every circuit in the property. The records serve different purposes and should be managed together, not confused.
Our commercial EICR frequency guide explains planning fixed-installation inspections. If you arrange both activities, ask the contractor to define each scope, the documents supplied and any access restrictions. Keeping those distinctions clear prevents a single invoice or certificate being mistaken for a complete fire safety assessment.
Getting advice and a clear scope of work
For an enquiry, send the premises type, an outline of its layout, any fire risk assessment recommendations and existing lighting records. Explain whether shared corridors or stairs are involved and identify the person who manages them. Ask for a clear proposal covering assessment, installation or repairs, testing arrangements and the records you will receive.
Adtec Electrical Services Ltd provides emergency lighting services across Oxfordshire and surrounding counties. Use the contact and quote page to discuss the electrical work. A qualified electrician should assess each property; confirm fire-safety decisions with your fire risk assessor. This guide does not establish compliance for your building or offer legal advice.
Want a fixed written quote? Call 01235 430442 or send us the details.
