Emergency lighting installation: planning the work
For a new unit, altered office or shop fit-out, emergency lighting needs a design brief rather than a shopping list of fittings.
Last updated
Short answer
Emergency lighting installation should follow the escape routes and needs identified by the fire risk assessment. Agree the design, electrical work, test arrangements and handover records before installation. A qualified electrician should assess the premises with the fire risk assessor; an EICR or a working exit sign alone does not establish adequate coverage.
Begin with how people leave the building
The installation is there to help occupants leave safely if normal lighting fails. Start with the actual escape routes, not the positions of the existing ceiling lights. Internal corridors, stairs, changes of direction and the route towards a place of safety need consideration. Furniture, racking and partitions can affect visibility, so a simple sketch of an empty building is not always an adequate design brief.
The person responsible for fire safety should share the current fire risk assessment and any recommendations. If an office is being divided or a shop is being refitted, provide the proposed layout as well as the current one. Discuss changes before ceilings and finishes are completed. Our shop fit-out electrical guide explains coordinating electrical work with a wider programme.
Define the installation rather than copying a neighbour
The designer needs to consider the premises, occupants and use. A neighbour’s arrangement may have different escape routes, hours, daylight and hazards. Repeating its number of fittings is not a substitute for assessment. The aim is adequate emergency illumination where required, with equipment suitable for the environment and access for future maintenance.
BS 5266-1 provides a code of practice for emergency lighting, while BS 7671 applies to the electrical installation. The emergency lighting regulations guide explains the distinction between standards and fire-safety duties in England and Wales. Confirm the applicable design and documentation with your fire risk assessor and electrician; this guide is general information, not legal advice.
Agree the type of system and controls
An emergency fitting may operate continuously or only when normal lighting fails, depending on its role and design. Self-contained fittings have their own backup arrangement; other systems can use a central supply. The appropriate choice depends on the premises and maintenance plan. Appearance alone does not tell you how a fitting is intended to operate.
Ask how testing will be carried out without improvised switching of unfamiliar circuits. Automatic self-test features can assist maintenance, but they do not remove the need to review faults and act on them. If you are choosing operating modes, read maintained versus non-maintained emergency lighting and discuss the intended behaviour with the designer.
Access, supplies and coordination with ordinary lighting
Cable routes, ceiling construction, working heights and occupied areas affect the electrical scope. A vacant fit-out and an occupied warehouse present different access constraints. Explain where work would interrupt staff, customers or other trades, and identify equipment that must remain available. Do not assume lighting work can proceed without a managed interruption.
Coordinate emergency provision with commercial lighting, but specify both functions clearly. A bright normal fitting is not automatically emergency equipment. Agree which circuits and controls are involved and how the installation detects loss of the relevant normal supply. Shared corridors, landlords’ systems and neighbouring units may require coordination with other responsible people.
Want a fixed written quote? Call 01235 430442 or send us the details.
What an installation quote should include
A useful proposal states the agreed coverage, equipment specification, cable routes, controls, access arrangements and installation limits. It should identify commissioning, testing and the information supplied at handover. Ask who provides any access equipment, opening-up work and making good, and how changes to the building layout will be managed during the project.
There is no installation price band on this page. The premises and scope need assessment before a meaningful figure can be given. A quotation covering replacement batteries is not comparable with a redesigned escape-lighting system. For emergency lighting services, send layout information and the assessor’s recommendations so Adtec can discuss the electrical work and relevant exclusions.
Commissioning and a useful handover
Installation is not complete merely because the fittings illuminate. The intended emergency operation and the appropriate commissioning checks need confirmation, with findings and limitations recorded. Ask for the design and installation information, fitting identification, operating instructions and the documents appropriate to the work. The responsible person should know where these are stored.
Agree who maintains the log book and follows up defects. Monthly function checks and annual full-duration tests are commonly followed under BS 5266; confirm the programme and precautions with your fire risk assessor. Our emergency lighting testing guide covers organising those checks. Testing records and an EICR have different purposes and should not be treated as interchangeable certificates.
When to involve a professional
Arrange advice when a fire risk assessment identifies missing provision, the layout changes, existing lights fail checks or nobody can explain the system. Do not remove covers, open battery compartments containing electrical parts or alter wiring to force emergency operation. Failed or obscured fittings need a managed response rather than an assumption that another nearby light compensates.
Use the enquiry page to send the premises type, drawings if available, current records and desired programme. A qualified electrician should assess the installation alongside the fire risk assessor’s requirements. If the premises remain occupied, agree suitable safety arrangements during work and testing before anyone begins.
Want a fixed written quote? Call 01235 430442 or send us the details.