Skip to content
Adtec Electrical Services

EV charger grants: check eligibility before booking

Funding depends on the applicant, property and installation, not simply on owning an electric car. Start with the correct scheme before comparing quotes.

Last updated

Short answer

As checked on 25 November 2026, eligible renters and owner-occupiers of flats can receive 75% of qualifying chargepoint purchase and installation costs, capped at £500. Separate schemes cover residential landlords, eligible workplaces and households using an approved cross-pavement solution. Current funding is available until 31 March 2027, subject to the scheme rules. An ordinary owner-occupied house with a driveway does not qualify for the renters and flat owners grant.

Which EV charging grant fits your situation?

For the household scheme, you must either rent and live in a residential property or own and live in a flat, with private off-street parking and an eligible vehicle. The parking space must be available to you and you must have the legal right to use it. Being a leaseholder, shared owner or tenant can introduce permissions that need resolving before an installer visits.

GOV.UK's renters and flat owners eligibility guide also lists exclusions, including an ordinary owner-occupied house, some lodging arrangements and previous claims. Do not assume buying an electric car creates entitlement. Read the complete criteria against your circumstances, including who owns or uses the vehicle and whether the property is occupied.

The current funding limits and dates

The official household grant page states that support is 75% of the qualifying cost, up to £500. That is a cap, not a fixed payment to every applicant. The eligible expenditure and application conditions determine the actual contribution. It does not mean every charger installation can be bought for the same remaining balance.

OZEV's changes from April 2026 guidance confirms funding until 31 March 2027 and the current £500 maximum per socket for the relevant household, residential landlord and workplace schemes. Different limits and procedures apply to different applicants. Check the live guidance before committing: a quotation date alone should not be treated as securing funding or meeting every completion requirement.

Landlords, workplaces and on-street parking

A landlord arranging charging for tenants should examine the residential landlord scheme rather than apply as a resident. A business planning staff or fleet charging should look at the Workplace Charging Scheme. The applicant, intended users, property rights and records differ. Shared parking needs clear agreement about access, responsibility for equipment and how electricity will be paid for.

For households without off-street parking, the separate on-street scheme involves a cross-pavement solution, such as a charging gully, and the necessary permissions. It is not permission to trail a cable across a pavement. Use the official chargepoint grants directory to find the applicable route and ask the relevant authority about highway requirements. Do not order excavation on the assumption that funding also grants permission.

What OZEV authorisation means for the job

Grant-funded work has installer and equipment requirements beyond general electrical competence. The OZEV installer guidance says an OZEV authorised installer is needed to claim these grants. Confirm who will handle the application, which equipment is eligible and what evidence is required before the job is booked. A charger advertised as smart is not, by itself, proof of grant eligibility.

This guide does not claim that Adtec has OZEV authorisation or can process a grant. Our EV charger installation page describes the electrical service already offered. Ask about the proposed delivery and grant arrangements directly, and verify any grant installer independently. Keep approval correspondence, the agreed quotation and permissions together so that everyone is working from the same brief.

Want a fixed written quote? Call 01235 430442 or send us the details.

Budget for the installation before subtracting funding

For context, Checkatrade's UK charger cost guide lists a 7kW charger at £450–£800 supply-only and an approximate £1,000 supply-and-install benchmark, including VAT. These are typical UK guide figures, not Adtec prices or a promised installed price. Equipment alone and a completed installation are different scopes; difficult routes, supply alterations and groundworks can increase the total.

Get the full price first, then identify eligible expenditure and any proposed grant deduction. Confirm VAT, equipment, installation, testing, permissions and making good. A grant should not conceal excluded works or an assumption that the existing board needs no attention. The EV installation cost guide explains the property-specific factors without assigning a universal installation price.

Electrical assessment and Part P are separate from funding

The electrician must assess supply capacity, earthing, protective measures, the consumer unit and the cable route under BS 7671. Funding approval does not make an unsuitable electrical design acceptable. Network operator requirements also need addressing. Do not open supply equipment, alter the board or try to extend a socket circuit yourself to prepare for charging.

In England, a new domestic circuit is notifiable under Part P. Use a qualified electrician and agree the notification route in advance: an electrician registered with an appropriate competent person scheme can self-certify relevant work; otherwise building control or an applicable agreed certification route is needed. Registration is not the only lawful route. Our Building Regulations guide explains the distinction; this is general guidance, not legal advice.

Mistakes to avoid when requesting a quote

Do not rely on an old grant amount, choose equipment solely because a retailer mentions funding, or begin work before checking the application sequence. Avoid assuming that ownership of a parking space includes permission to fix equipment to a shared wall. Ask what happens to the quotation if funding is declined, and obtain that answer in writing.

Use the enquiry page to describe your tenure, parking arrangements, proposed charging position and any permissions already obtained. Include accessible photos without removing covers. An electrician should assess the property before installation; funding questions should be resolved with the relevant scheme and authorised installer, not guessed from a search result. Do not send identity or financial documents through an ordinary initial enquiry unless specifically requested through an appropriate process.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Not for an ordinary owner-occupied house. The household scheme covers eligible renters and owner-occupiers of flats. Other schemes have separate conditions; use the current GOV.UK guidance for your situation.

No. Chargepoint support concerns eligible charging equipment and installation. Vehicle purchase support has different rules and should not be included in the same installation budget.

No. For eligible renters and flat owners, the grant covers 75% of qualifying costs up to £500. The eligible expenditure and scheme conditions determine the actual contribution.

No. The grant process requires an OZEV authorised installer and eligible equipment. General electrical competence and grant authorisation are separate; verify both for the proposed job.

Do not assume so. The on-street household scheme concerns an eligible cross-pavement solution and permissions, not a loose trailing cable. Check the official scheme and highway authority requirements first.

Related pages

CallQuote