Skip to content
Adtec Electrical Services

EV charger not working: common causes and what to check

A home charge point is a mix of power electronics, safety devices and software, and it talks to both the car and, usually, an app. When a charge does not start, any of those may be the reason. Many problems are settings rather than faults, but some are safety devices doing their job and should not be bypassed.

Last updated

Short answer

Check the simple things first: the charging schedule in the car and the charger app, the cable connection at both ends, and whether the charger's breaker or RCD at the consumer unit has tripped. Scheduled or delayed starts are the most common cause of a charger that appears dead. Repeated tripping, a persistent fault light or any sign of heat at the unit or cable needs an electrician.

Settings, schedules and delays

Both the car and the charge point can hold a charging schedule, and they do not always agree. If the car is set to charge only between certain hours and the charger is set to different ones, nothing may happen at all. Check both, and try an immediate or boost charge from the app to see whether the hardware responds.

Smart charge points sold for home use in Great Britain are required to come with off-peak charging as a default setting and to be able to apply a short randomised delay before starting, so that large numbers of chargers do not all switch on at the same moment. A charger that waits several minutes before starting is very likely doing this. The owner can usually override the delay for a particular session.

Cable, connector and vehicle

The car and charger exchange signals through the plug before any power flows. A connector that is not fully home, dirt or water in the socket, or a damaged pin will stop that exchange. Reseat the cable at both ends firmly. Inspect a tethered cable for cuts, crushed sections or a cracked plug, and stop using it if you find damage.

Many cars lock the cable in place and will not start charging if the lock has not engaged. Others stop charging if the car is unlocked or a door is opened, depending on settings. If the car charges normally at a public charge point, attention turns to the home unit; if it does not, the car or its cable is the more likely cause.

Tripping breakers and RCDs

A charge point is on its own circuit, protected by a breaker and a form of RCD selected for EV charging. If that protection operates, the charger will be dead with no lights at all. You can reset it once. If it trips again, particularly as soon as the car is connected, leave it off. Something is leaking current to earth or overloading the circuit, and repeatedly resetting it defeats the protection. Our guide to an RCD that keeps tripping explains what these devices respond to.

Moisture is a frequent cause outdoors: water in the charger socket, in a damaged cable, or in an isolator on the wall. Faults within the vehicle's on-board charger can also trip the protection, which is another reason to note whether the problem follows the car.

Want a fixed written quote? Call 01235 430442 or send us the details.

Load management and slow charging

Many installations include a sensor on the incoming supply that lets the charger see how much the house is using. When the cooker, shower and kettle are all running, the charger reduces its rate, or pauses, to keep the total within what the main fuse can supply. This is deliberate and protects the supply. Charging that slows in the early evening and recovers later is typical of it.

If the sensor has been disturbed, fitted the wrong way round or lost its connection to the charger, the unit may limit itself to a low rate permanently or stop with a fault. That needs an electrician to check. The background to supply capacity is explained in our guide to a main fuse upgrade.

Fault lights and earthing protection

Charge points monitor the supply for conditions that would make it unsafe to connect a car, including a problem with the earthing of the incoming supply. Many units have this protection built in and will lock out and show a fault if the supply voltage moves outside set limits. If a charger shows a persistent fault after being switched off and on once at its isolator, record the light pattern or code and do not keep cycling it.

A lockout of this kind can be caused by a problem on the network rather than in your home. If lights in the house are also behaving oddly, brightening or dimming, treat it as urgent: contact your network operator on 105 and an electrician.

When to call an electrician

Call an electrician if protection trips more than once, if the charger, isolator or cable feels hot or shows discolouration, if there is a fault indication that does not clear, or if the unit has been physically damaged. The charger manufacturer's support line can often read diagnostics remotely, and an electrician can test the circuit, the earthing arrangement and the protective devices against BS 7671.

Installing or replacing a charge point involves a new or altered circuit and is notifiable under Part P of the Building Regulations, so it should be done by a registered electrician who will also deal with the notification to the network operator. Our EV charger installation page and our guide to EV charger installation requirements cover what a compliant installation includes.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Most often a schedule in the car or the app is holding it until off-peak hours. Smart chargers can also apply a short random delay before starting. Try an immediate or boost charge to confirm the charger itself is working.

The protective devices have detected a fault current or an overload. Moisture in the connector or cable, a fault in the charger or a fault in the car are the usual causes. Leave it off after a second trip and have the circuit tested.

The charger may be reducing its rate because the house is using a lot of power, the car may be limiting the rate because of battery temperature or state of charge, or a load sensor may have developed a fault.

If the unit shows a fault code and the electrics have not tripped, the manufacturer's support can often diagnose it remotely. If protection has tripped or there are signs of heat or damage, call an electrician.

Related pages

CallQuote