Main fuse upgrade: checking whether your supply is big enough

Homes are being asked to do more with electricity than they were built for: car charging, induction cooking, electric showers and heat pumps. The limit on all of it is one fuse, in a sealed box beside the meter, that most people have never looked at.

Last updated

Short answer

The main fuse, or cut-out fuse, sets the maximum current a property can draw. Ratings of 60, 80 and 100 amps are typical for UK homes. It belongs to the distribution network operator and only they can change it. An electrician's part is to calculate the maximum demand of the installation under BS 7671, advise whether an upgrade is needed, and make sure the meter tails, earthing and consumer unit on your side are suitable for the higher rating. Any new circuit for the equipment prompting the upgrade is notifiable under Part P and should be installed by a registered electrician.

What the main fuse does

The service cable from the street ends at the cut-out, a sealed unit containing a single large fuse. Its purpose is to protect the network's cable and the meter tails. The individual circuits in the house are protected separately, by the devices in the consumer unit. The main fuse only operates if the total drawn by the whole property exceeds its rating for long enough, or if there is a fault between the cut-out and the consumer unit.

A label on the cut-out may show a rating, but the label describes the carrier and is not proof of the fuse inside it. The network operator can confirm what is fitted. Do not attempt to open the cut-out to look: it is sealed, it is live, and it cannot be isolated from inside the property.

Why it becomes a constraint

For decades the main fuse was rarely a concern, because gas did the heating and cooking. That is changing. A single electric shower, an induction hob or a car charger each draws a substantial share of a smaller supply on its own. Several of them running together on a winter evening can approach the limit.

A main fuse that is overloaded for a prolonged period will eventually operate, and the whole house loses power until the network operator attends to replace it. More commonly, the constraint appears on paper first, when an electrician assesses the supply before installing new equipment.

How an electrician assesses maximum demand

The electrician lists the fixed loads in the house, applies the diversity allowances recognised under BS 7671, which reflect the fact that not everything runs at once, and arrives at a realistic maximum demand. Where there is doubt, the actual current can be logged over a period to see how the house behaves. The result is compared with the main fuse rating, with the proposed new load added.

For car chargers and heat pumps, the installer also has to notify or apply to the network operator, and the operator may reach its own view on whether the supply is adequate. The requirements are set out in our guide to EV charger installation requirements.

What an upgrade involves

A request goes to the distribution network operator for the area, from you or from your installer. The operator checks whether the service cable and cut-out can support a higher rating. Where they can, an engineer attends, replaces the fuse and, if necessary, the cut-out itself. Where the cable is too small, is shared with a neighbour through a looped service, or is in poor condition, the operator may need to carry out further work first. Policies on charging and timescales vary between operators and according to what is needed, so ask at the outset.

Want a fixed written quote? Call 01235 430442 or send us the details.

What may need doing on your side first

  • Meter tails: older, thinner tails are not suitable for a higher-rated fuse and must be replaced with the size the operator specifies.
  • Main earthing conductor and bonding: these are sized in relation to the supply and are often undersized in older houses.
  • Consumer unit: the main switch must be rated for the supply, and a dated board may not be a sound basis for new high-power circuits.
  • Isolating switch: if there is none between the meter and the consumer unit, having one fitted makes future work simpler.

Network operators commonly decline to uprate a fuse until tails and earthing are adequate, so an electrician's visit beforehand saves a wasted appointment. Earthing is explained in our guide to earthing and bonding.

Alternatives to an upgrade

An upgrade is not always necessary or possible. Load management equipment measures the total current drawn by the house and automatically reduces a flexible load, usually the car charger, when demand rises. Some appliances allow their maximum power to be limited at installation. Charging overnight, when cooking and showers are not in use, also helps. These measures are part of the design and are agreed with the installer.

Where a property genuinely needs more than a single-phase supply can provide, the next step is a three-phase supply, which is a new connection from the network operator and a larger project. Our guide to three-phase supply explains when that is worth considering.

Regulations and safety

Nothing at the cut-out is a householder or electrician task. On your side of the meter, replacing meter tails, upgrading earthing, changing a consumer unit and installing new circuits must comply with BS 7671; consumer unit replacement and new circuits are notifiable under Part P in England and Wales. A registered electrician will test and certify the work and can deal with the network operator on your behalf.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

The cut-out may carry a label, but it is not always accurate. Your distribution network operator can confirm the rating; do not open the cut-out yourself.

No. The fuse and cut-out belong to the network operator and only they may remove or replace it. An electrician prepares the installation on your side and can make the request.

Not always. It depends on the existing rating and what else the house runs. Load management can often keep total demand within the current supply.

They are the cables between the meter and the consumer unit. They must be large enough for the main fuse rating, and older ones often need replacing before an upgrade.