Skip to content
Adtec Electrical Services

Extractor fan not working: causes, checks and when to replace it

An extractor fan tends to be ignored until the mirror stops clearing or mould appears on the ceiling. By then it may have been failing for months. Whether it has stopped completely, become noisy or simply stopped moving air, the causes fall into a small number of groups.

Last updated

Short answer

A fan that is completely dead may have lost its supply through an isolator switch or fused spur, or its motor may have failed. A fan that runs but does not clear steam is often clogged with dust, has a blocked or disconnected duct, or was never powerful enough for the duct run. Noisy, slow or hot fans are usually at the end of their life and are better replaced than repaired.

Fan completely dead

Most bathroom fans are fed through a fan isolator, a switch with three poles that allows the fan to be disconnected fully for cleaning or replacement. It is usually mounted high on the wall outside the bathroom or above the door, and it is easily knocked off or switched off by someone who did not know what it was for. Check that first.

Some fans are fed from a fused connection unit with a small fuse inside. If that fuse has operated, the fan will be dead while the bathroom light works normally. A fuse that has blown once may simply have reached the end of its life; one that blows again after replacement means the fan has a fault. Our guide to fused spurs explains what these units do.

If the supply is present and the fan still does nothing, the motor or the control electronics inside it have failed. Small fan motors are not economically repairable, so replacement is the normal answer.

Fan runs but does not clear the room

This is the most common complaint, and the fan itself is often not to blame. Dust and fluff build up on the grille and the impeller blades, and in a bathroom the dust becomes a damp felt that can halve the airflow. With the fan isolated, the front grille on most models can be removed and cleaned by the householder; follow the manufacturer's instructions and do not open anything beyond that.

Behind the fan, the duct matters as much as the motor. Flexible duct that sags in the loft collects condensation in the low points until it is partly full of water. Ducts get crushed under stored boxes, disconnected from the roof or wall terminal, or were never connected to the outside at all. The backdraught shutter, a set of light flaps that stops cold air blowing in, can stick shut with grime.

There is also the question of whether the fan was suitable in the first place. A basic axial fan is designed to push air straight through a wall. Fitted to several metres of duct with bends, it moves very little. A centrifugal or inline fan is the right choice for longer runs. We compare the types in our guide to extractor fan types and costs.

Noise, rattling and humming

Fan bearings wear, and a fan that used to be quiet becomes a drone or a rattle. A light rattle may be a loose grille or a shutter flapping in the wind. A grinding or rumbling noise that rises and falls is bearing wear, and it will get worse until the motor seizes.

A fan that hums without turning has seized already. Switch it off at the isolator. A stalled motor draws current and heats up, and although fans include thermal protection, it should not be left energised in that state. The same applies to a fan casing that is hot to the touch or smells of hot plastic.

Want a fixed written quote? Call 01235 430442 or send us the details.

Timer and humidity faults

Many fans have an overrun timer that keeps them going for a set period after the light is switched off. When the timer circuit fails, the fan may stop the moment the light goes off, or never stop at all. A fan that runs continuously may also be a humidity-sensing model reacting to genuinely damp air, or one whose sensor has drifted. Most have an adjustment inside, which an electrician can reset when the fan is isolated.

Replacing the fan

A fan is fixed electrical equipment in a room containing a bath or shower, so its position and protection are governed by BS 7671. Depending on where it sits in relation to the bath or shower, it may need a particular IP rating or to be a low-voltage type fed from a transformer outside the zones. Our guide to bathroom electrics zones explains the principle.

Swapping a failed fan for a similar one on the existing wiring is generally a repair. Adding a fan where there was none, or installing a new circuit, in a bathroom is notifiable work under Part P of the Building Regulations, and it should be carried out and certified by a registered electrician. In either case the circuit should have RCD protection, and the electrician will test before handing over.

A replacement is a good moment to correct the underlying problems: a properly supported rigid or semi-rigid duct, a fan matched to the duct length and a control method that suits how the room is used. Our extractor fan installation page sets out how we do this.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

The fan usually has its own isolator switch and sometimes its own fuse. Check the isolator, often above the door outside the bathroom. If the supply is on and the fan is still dead, the motor or its electronics have failed.

It may be a timer model with a long overrun, a humidity model responding to damp air, or one with a failed control board. If it never stops, an electrician can check the settings and wiring and replace the fan if the controls have failed.

You can usually clean the outer grille with the fan switched off at its isolator, following the maker's instructions. Do not remove internal covers or disturb the wiring. If the fan is still weak afterwards, the duct or the fan itself needs attention.

It depends heavily on the quality of the fan, how often it runs and how damp and dusty the air is. Noise, slow running and poor extraction are the practical signs that it is time to replace it, whatever its age.

Related pages

CallQuote