Skip to content
Adtec Electrical Services

Fused spurs explained: what they are and when one is used

Quotes and electrical reports often mention a fused spur without explaining it. It is one of the most common accessories in a house, usually sitting unnoticed beside the boiler or above the worktop, and it has a specific job.

Last updated

Short answer

A fused spur, properly called a fused connection unit, is a wall accessory containing a cartridge fuse that connects a fixed appliance or a branch of wiring to a socket circuit. It takes the place of a plug and socket where equipment is permanently wired, and its fuse protects the smaller cable or the appliance beyond it. Spurs are a recognised way of adding to a circuit under BS 7671, but there are limits on how they are used. Adding one to an existing circuit is not normally notifiable under Part P in England, though it should still be installed and tested by a qualified electrician.

What a fused connection unit looks like

It is the same size as a single socket but has no holes for a plug. On the front there is a small fuse carrier that can be opened with a screwdriver, and usually a switch. Some have a neon indicator to show the supply is on, and some have a flex outlet at the bottom for the appliance cable. Behind the plate, the supply arrives on one set of terminals and the load leaves on another, with the fuse in between.

The fuse is the same type of cartridge fuse found in a plug. The rating fitted should match what is connected: a lower rating for controls, fans and lighting loads, and a higher rating for appliances that draw more.

Where they are used

  • Central heating boilers and their controls, so the whole system has one point of isolation.
  • Bathroom and kitchen extractor fans, often with a separate isolator as well.
  • Built-in appliances such as integrated fridges, dishwashers and washing machines, with the switch above the worktop and an outlet below.
  • Cooker hoods, waste disposal units and water softeners.
  • Heated towel rails and wall-mounted heaters.
  • Supplies for alarm panels, door entry systems and under-cabinet lighting.

The common thread is equipment that stays in one place. A fixed connection cannot be pulled out by accident, and a switch at a visible height means the appliance can be isolated without dragging it out of its housing.

Spurs from a ring circuit

Most socket circuits in UK homes are ring final circuits: the cable leaves the consumer unit, visits each socket and returns to the board. A spur is a branch taken off that ring, from a socket, a junction box or the consumer unit, to feed an additional point.

An unfused spur uses the same size cable as the ring and is limited in what it may supply, conventionally one single or one double socket. The reason is that the branch cable is protected only by the device for the whole ring, so the load on it must be restricted by what is connected. A fused spur starts at a fused connection unit; because the fuse limits the current, the wiring after it can supply more than one point, within the rating of the fuse.

The practical limit is that everything after a fused connection unit shares one cartridge fuse. That suits a pair of sockets for a television and a lamp. It does not suit a row of sockets for kitchen appliances.

When a spur is the right answer and when it is not

A spur is a good solution for one extra socket in a convenient place, or for connecting a fixed appliance. It is quick, involves little disturbance and, done properly, is entirely sound.

It becomes the wrong answer when it is used repeatedly to avoid extending the circuit correctly. Spurs taken from spurs, several sockets hung from one unfused branch, and long chains added over the years are among the most frequent observations on inspection reports. Where several sockets are wanted, it is usually better to extend the ring itself or to install a new circuit. Our guide to planning sockets and switches looks at how many points a room is likely to need.

Want a fixed written quote? Call 01235 430442 or send us the details.

Switched, unswitched and with RCD

A switched unit provides isolation at the point of use and is the usual choice. Unswitched units are used where accidental switching off would be a nuisance, for example on a freezer or an alarm supply.

Fuses that keep blowing

A fuse in a connection unit that fails once may simply have reached the end of its life. One that fails repeatedly is doing its job: something downstream is drawing too much current or has a fault. Fitting a larger fuse to stop it blowing removes the protection and risks overheating the cable or appliance. The appliance or wiring should be checked instead; see our fault finding page.

Regulations and who should do the work

Additions to socket circuits must comply with BS 7671, which includes RCD protection for new socket-outlets and for cables concealed in walls in most domestic situations. In England, adding a fused spur to an existing circuit outside a bathroom zone is not notifiable under Part P; a new circuit is. The electrician should test the circuit before and after and issue a Minor Electrical Installation Works Certificate.

Testing matters here because a spur is only as good as the circuit it is taken from. A ring with a break in it, which is not visible in normal use, can leave cables carrying more current than they should. An electrician checks ring continuity before adding to it.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

A socket accepts a plug, which contains the fuse. A fused spur, or fused connection unit, contains the fuse itself and is wired permanently to the appliance or to further wiring.

More than one is possible because the fuse limits the load, but everything after it shares that single fuse. It suits light loads, not groups of high-powered appliances.

An unfused spur should not feed a further spur. Where more points are needed the circuit should be extended properly or a fused connection unit used, as assessed by an electrician.

Not normally in England, provided it is an addition to an existing circuit outside a bathroom zone. It must still meet BS 7671 and should be tested and certified.

It provides a single, clearly identified point to isolate the boiler and its controls, and the fuse is rated to protect the control wiring.

Related pages

CallQuote