House to flats conversion electrics: supplies, meters and wiring

Turning one house into several flats changes the electrical installation more fundamentally than almost any other domestic project. One supply and one consumer unit become several of each, with shared areas that belong to none of the flats.

Last updated

Short answer

Each flat normally needs its own metered supply and its own consumer unit, with a separate landlord's supply for communal lighting, alarms and door entry. New or altered supplies are arranged with the distribution network operator, and the meters are fitted by electricity suppliers. Inside the building, each flat is wired as a self-contained installation to BS 7671 and certified individually. The work in the flats and the common access areas is notifiable under Part P, so it should be designed and installed by a registered electrician working alongside Building Control and whoever is responsible for the fire strategy.

Supplies and metering

An existing house has a single service cable and one meter. A conversion needs a metered supply for every flat, so that each occupier has their own account with a supplier of their choice, plus a supply for the landlord's areas. The distribution network operator decides how that is provided: sometimes by upgrading the incoming service and installing multi-way equipment at the intake, sometimes by a new connection.

The application needs the number of flats and an estimate of the load in each, which depends heavily on whether heating, hot water and cooking are electric. Network work is priced and programmed by the operator and is rarely quick, so it should be one of the first things set in motion, well before first fix.

The meter position

Meters are usually grouped in one place: a cupboard in the communal hall, a dedicated meter room or external boxes. The position has to be accessible to the suppliers and to each occupier without entering another flat, have enough space for every meter and isolator, and be acceptable in fire terms, since it often sits on the escape route. Enclosure and fire-stopping requirements are set by the fire strategy and Building Control, not by the electrician alone.

Getting power to each flat

From the meters, a cable runs to the consumer unit in each flat. These are longer than ordinary meter tails, so each is protected at the meter position by a switch-fuse and sized for the flat's load and the length of the run. The route passes through communal space and often through floors, so the cables are installed in a way that protects them and maintains the fire separation between dwellings. Every penetration through a compartment wall or floor is sealed to the required standard.

Wiring within each flat

Each flat is a complete installation in its own right: a consumer unit with appropriate RCD or RCBO protection and surge protection assessed under BS 7671, circuits for sockets, lighting, cooking, and water heating or showers, mains-powered interlinked smoke and heat alarms, and extraction to kitchens and bathrooms. No circuit should cross from one flat into another. Where old wiring is to be retained, it has to be traced and separated flat by flat, which is frequently more work than replacing it. Our guide to full and partial rewires explains how that decision is usually made.

Want a fixed written quote? Call 01235 430442 or send us the details.

The landlord's supply

Shared areas need power that is not paid for by any one tenant. A landlord's consumer unit, on its own meter, typically supplies:

  • Lighting to halls, stairs, landings and the outside of the building.
  • Emergency lighting on the escape route, where the fire strategy requires it.
  • Any communal fire detection and alarm equipment specified for the building.
  • Door entry systems and communal aerial or data equipment.
  • A cleaner's socket and external supplies.

What fire detection and emergency lighting the common parts need is determined by the fire risk assessment and Building Regulations guidance for the type of conversion. The electrician installs to that specification; the designer or fire engineer sets it.

Earthing

The earthing arrangement provided by the network may change when the supply is altered, and each flat needs a properly sized earthing conductor and main bonding to its own incoming services. Shared metal pipework that passes between flats needs thought. This is settled at design stage with the network operator's information to hand.

Certification and handover

Each flat receives its own Electrical Installation Certificate, and the landlord's installation receives another. Part P of the Building Regulations applies to the dwellings and to the common access areas of a block of flats, so the work is notifiable; a registered electrician certifies it and compliance certificates are issued for Building Control. If the flats are to be let, the certificates for the new installations are what the landlord holds as evidence of electrical safety at the outset, with periodic inspection due at the interval the certificate recommends, and no later than the legal maximum for rented homes. See our page for landlords.

Common pitfalls

  • Leaving the network operator application until the builders are on site.
  • A meter cupboard too small for the number of meters and isolators.
  • Communal lighting wired from one flat's supply.
  • Old circuits left crossing between flats.
  • Fire-stopping around cables left to the end and then missed.

We work with builders and developers on conversions from the planning stage; see builders and developers.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Normally yes, so that each occupier has an independent supply and account. The network operator and suppliers provide the supplies and meters.

A separately metered supply for communal services such as stair lighting, emergency lighting, alarms and door entry, paid for by the building owner or management company.

Sometimes in part, but it must be separated so that no circuit serves more than one flat and must meet current standards. Rewiring is often simpler.

Yes. It applies to the dwellings and to common access areas such as halls and stairs. The work is notifiable and should be certified by a registered electrician.