How an electric shower is installed, and why it is not a DIY job
Searching for how to install an electric shower turns up plenty of confident videos. What they tend to skip is the part that matters: an electric shower is one of the highest-powered appliances in a home, used by someone standing in water. This guide explains what a correct installation involves so you know what to expect from the electrician who does it.
Last updated
Short answer
An electric shower is installed on its own dedicated circuit from the consumer unit, with a cable and circuit breaker sized for the shower's kilowatt rating, 30 mA RCD protection and a double-pole isolating switch. It also needs a suitable cold mains water feed. A new shower circuit is notifiable under Part P of the Building Regulations and must be installed, tested and certified by a qualified electrician.
Why a shower needs its own circuit
An electric shower heats cold water instantly as it passes through the unit, and that takes a great deal of power. Common ratings run from around 7.5 kW up to 10.5 kW or more. At those ratings the shower draws more current than an entire ring of sockets is designed to carry.
For that reason the shower is supplied by a dedicated radial circuit: a single cable running from its own protective device in the consumer unit, through an isolating switch, to the shower. Nothing else is connected to it.
Before anything is fitted: the checks
The first step is not in the bathroom at all. The electrician checks whether the installation can support the shower.
- The main fuse and overall demand, particularly in homes that also have electric cooking, heating or a car charger.
- The consumer unit: whether there is a spare way, and whether it provides RCD protection suitable for a bathroom circuit. An old board with no spare capacity or no RCD may need replacing first.
- The earthing and bonding of the installation, which must be sound before a new circuit is added.
- The cable route from the consumer unit to the bathroom, and the length of that route.
- The cold water supply. Most electric showers need mains-pressure cold water at or above a minimum pressure and flow stated by the manufacturer.
If the house supply is marginal, a lower-rated shower may be the sensible choice. Where an older consumer unit is the obstacle, our guide do I need a new consumer unit explains the options.
Cable, breaker and RCD
The cable size is selected from the shower's rating, the length of the run and how the cable is installed. A cable that passes through loft insulation or is grouped with others cannot carry as much current as one clipped to an open surface, so the route affects the size. Choosing a cable only from a chart of kilowatt ratings, without considering the route, is one of the most common errors in amateur installations.
The circuit breaker is matched to the cable and the load, and the circuit is protected by a 30 mA residual current device, which disconnects the supply quickly if current leaks to earth. BS 7671 requires this protection for circuits serving a room containing a bath or shower.
The isolator and the bathroom zones
The circuit includes a double-pole switch that disconnects both live and neutral, so the shower can be completely isolated for maintenance. In most bathrooms this is a ceiling-mounted pull-cord switch with an indicator; alternatively a wall switch is fitted outside the room.
Bathrooms are divided into zones according to how close a position is to the bath or shower, and each zone limits what equipment may be installed there. The shower unit itself is designed for its location, but switches and other accessories must be kept out of reach of spray. Our guide to bathroom electrics zones explains the layout.
Want a fixed written quote? Call 01235 430442 or send us the details.
Fitting the unit
With the cable in place, the shower unit is fixed to the wall and the water and electrical connections made inside it. The cable enters through the designated entry point and is terminated firmly; loose terminals at this current are a known cause of overheating and burnt connections in showers.
The water connection is usually a single cold feed with an isolating valve nearby. The pipework is flushed before the unit is connected, the seals are checked, and tiling or panel entry points are sealed so that water cannot track behind the unit.
Testing and certification
Before the shower is used, the circuit is tested to BS 7671: continuity of the conductors, insulation resistance, polarity, earth fault loop impedance and the operating time of the RCD. The shower is then commissioned according to the manufacturer's instructions, which normally means running water through it before the heating elements are switched on.
You should receive an Electrical Installation Certificate with the test results. Because a new circuit is notifiable under Part P, a Building Regulations compliance certificate should follow, issued through the electrician's competent person scheme or through building control.
Why this is not a DIY installation
The risks with a badly installed shower are overheating cables, connections that burn out, and the absence of fault protection in the one room where people are wet and barefoot. The checks that prevent those outcomes need test instruments and the knowledge to interpret them, and the work legally has to be notified and certified.
If you would like a shower fitted, our electric shower installation page explains what we need to know, and the guide to electric shower installation cost sets out what affects the price. If you are replacing an existing unit, see replacing an electric shower.
Want a fixed written quote? Call 01235 430442 or send us the details.
