Skip to content
Adtec Electrical Services

Replacing an electric shower: like-for-like swaps, upgrades and cost factors

Electric showers do not last for ever. Elements scale up, thermal cut-outs fail and plastic parts become brittle. Replacing one looks like a matter of four screws and two connections, but whether it really is that simple depends on the circuit behind it.

Last updated

Short answer

An electric shower can be replaced with a new unit of the same kilowatt rating on the existing circuit, provided the cable, breaker, isolator and RCD protection are in good condition and suitable. Fitting a higher-rated shower may need a larger cable and breaker, which becomes a bigger job. The cost depends mainly on whether the existing circuit can be reused. The work should be done and tested by a qualified electrician.

Repair or replace?

Not every faulty shower needs replacing. A blocked shower head, a scaled-up inlet filter or a failed pull-cord switch can produce symptoms that look like a dead shower. Our guide to an electric shower not working goes through the usual causes.

Replacement makes sense when the unit is old, spare parts are no longer available, the case is cracked or leaking, or there are signs of heat damage inside. Where a shower has failed because of a burnt connection, the cable end and the isolator need to be examined as well, because the cause may lie there.

The like-for-like swap

The most straightforward replacement is a new shower with the same kilowatt rating as the old one. The demand on the circuit is unchanged, so the existing cable and breaker can normally stay.

That still depends on the circuit being right in the first place. Before fitting the new unit, an electrician will check the size and condition of the cable, the rating of the circuit breaker, that the circuit has 30 mA RCD protection, that the isolator is in good order and that the earthing is sound. Showers fitted many years ago are sometimes found on cable that was marginal even then, or on a circuit with no RCD, and a new shower should not be connected to a circuit that is not safe.

The end of the cable is inspected too. If the insulation is discoloured or brittle from heat, it is cut back to sound cable where there is enough slack, or the affected section is replaced.

Moving up to a more powerful shower

People often take the opportunity to fit a higher-rated shower for a stronger flow in winter. A higher rating means more current, and the existing circuit may not be able to carry it.

If the cable is too small for the new rating, it has to be replaced with a larger one back to the consumer unit, along with the breaker and possibly the isolator. That is effectively a new circuit, with the disruption of a new cable route, and it is notifiable under Part P of the Building Regulations. The electrician will also check that the main fuse and the rest of the installation can support the increased load.

Often the practical answer is a modern shower of the same rating. Newer units with better flow control can give a more satisfactory shower than an old one without any change to the circuit.

Fitting differences between models

Showers are not a standard shape. The positions where the cable and the water pipe enter the unit vary between manufacturers and models: top, bottom, back, left or right.

  • If the new shower's entry points match the old, it can cover the same footprint with no visible change.
  • If they do not, the cable or pipe may need re-routing, which can mean disturbing tiles or using a surface-mounted solution.
  • A smaller unit can leave old screw holes or unfaded tile exposed; some ranges are made deliberately large, or offer multiple entry points, to simplify replacement.
  • The riser rail and hose may or may not be reused.

It is worth telling the electrician the make and model of the existing shower, and sending a photograph, so a suitable replacement can be suggested before the visit.

Want a fixed written quote? Call 01235 430442 or send us the details.

What affects the cost of replacing a shower

We do not publish prices for this work, because the range between the simplest and the most involved replacement is wide. These are the factors that decide where a job falls.

  • Whether the existing circuit can be reused as it is. This is the largest single factor.
  • The shower unit chosen. Basic models and thermostatic or digital models differ considerably in price.
  • Any remedial work: a heat-damaged cable end, a worn isolator, or missing RCD protection.
  • A change of rating that requires new cable, and how difficult the route is.
  • Plumbing alterations and making good to tiles where entry points differ.
  • Whether the consumer unit has to be upgraded before the circuit can be made compliant.

For new installations, where there is no existing circuit, see our guide to electric shower installation cost.

Testing, certificates and Part P

After the new shower is connected, the circuit is tested to BS 7671 to confirm the earth path, the insulation and the operation of the RCD, and the shower is commissioned following the manufacturer's instructions.

A like-for-like replacement of the unit on its existing circuit is generally not notifiable under Part P, and is recorded on a Minor Electrical Installation Works Certificate. Where a new circuit is installed for a higher-rated shower, the work is notifiable and an Electrical Installation Certificate is issued. In both cases you should be given the paperwork.

Why you should not swap it yourself

Changing a shower means working on a high-current circuit in a bathroom, and the swap is only safe if the circuit behind it has been checked with test instruments. Without that, a new shower can be connected to an undersized cable, a damaged conductor or a circuit with no fault protection, and it will appear to work until something overheats.

For that reason we recommend that every replacement is carried out and tested by a qualified electrician. Our electric shower installation page explains how to send us the details, and how electric showers are installed describes the full circuit.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Only if the existing cable, breaker, isolator and supply are suitable for the higher current. If they are not, a new circuit is needed. An electrician can confirm this by checking the installation before you buy.

It depends on the unit chosen and on whether the existing circuit can be reused. A same-rating swap on a sound circuit is the lowest-cost case; new cable, remedial work or tiling alterations increase it.

Yes, we recommend it. The circuit should be checked and tested when the shower is changed, and any fault found in the cable, isolator or RCD protection has to be put right before the new unit is used.

A like-for-like replacement on the existing circuit is generally not notifiable. Installing a new circuit for it is. Either way the work must comply with BS 7671 and be certified.

A like-for-like replacement with matching entry points is usually completed in a few hours. Re-routing pipe or cable, or running a new circuit, takes longer.

Related pages

CallQuote