Outdoor socket installation: positions, protection and rules

An outside socket saves trailing extension leads through windows for the mower, pressure washer or festive lights. It is a small job, but one where the details matter because the socket lives in the rain and is used by people standing on wet ground.

Last updated

Short answer

An outdoor socket should be a purpose-made weatherproof unit, protected by a 30mA RCD and connected to a circuit that an electrician has checked can take it. Many are fed through the wall from an existing indoor socket circuit, which keeps disruption low; sockets further down the garden need a properly protected cable route and sometimes their own circuit. All of the work must comply with BS 7671. Adding a socket to an existing circuit is not normally notifiable in England, but a new circuit is notifiable under Part P, so use a registered electrician.

Why an ordinary socket will not do

Indoor sockets have no protection against water. An outdoor socket is built into a sealed enclosure with a gasketed lid, and the better designs keep their weather rating while a plug is in use, because that is exactly when rain tends to arrive. The rating is shown as an IP code on the product; your electrician will choose one suited to how exposed the position is. Our guide to IP ratings explains what the numbers mean.

Cheap units with a flap that only seals when nothing is plugged in are a false economy. So is an indoor extension lead left outside under a plant pot. Neither is designed for the job.

RCD protection

Anyone using electrical equipment outdoors is in good contact with the ground, often in damp conditions, which is the situation where an electric shock is most dangerous. A residual current device rated at 30mA disconnects the supply very quickly if current starts to leak to earth, for example through a damaged mower cable.

BS 7671 requires this protection for socket-outlets likely to supply equipment outdoors. In a modern consumer unit the protection is already there at the board. In an older installation without RCDs, the electrician may fit a socket with a built-in RCD, add protection at the board, or recommend a consumer unit upgrade if the board has other shortcomings.

Where the supply comes from

The neatest installation is back-to-back: the outdoor socket is fixed to the outside wall directly behind an existing indoor socket, with a short cable passing through a drilled and sealed hole. Before doing that the electrician confirms what circuit the indoor socket is on, its condition, and whether adding a further socket is acceptable under the rules for that circuit type.

Where no socket is conveniently placed, the cable may be run from another point on the circuit, or a new circuit may be installed from the consumer unit. A new circuit is the usual answer when the outdoor supply will feed something substantial, such as a workshop, or when the existing circuits are already heavily loaded.

Sockets away from the house

A socket on a fence post, by a pond or at the far end of the garden needs a cable that will survive there for decades. That normally means armoured cable, either buried at a suitable depth with warning tape above it or fixed securely along a permanent structure where it will not be damaged. Garden fences that move in the wind are a poor support.

Longer runs also affect the electrical design. Voltage drop and the time taken for protective devices to operate both depend on cable length, so the electrician may need a larger cable than the load alone suggests. Where a building is involved, the considerations are covered in our page on garden room electrics.

Want a fixed written quote? Call 01235 430442 or send us the details.

Choosing a sensible position

  • High enough to stay clear of standing water, splashing and snow, and to be reached without kneeling.
  • Close to where equipment is actually used: the patio, the driveway for car cleaning, or near the shed.
  • Out of the direct line of sprinklers and away from overflowing gutters.
  • Controlled by an indoor switch if you want to isolate it when the house is empty.
  • Clear of gas meter boxes and flues, where separation distances apply.

If the socket is mainly for outdoor lighting, a dedicated lighting supply with a timer or sensor is usually better than leaving plugs in outdoor sockets all year. See outdoor lighting for that approach.

What it is not suitable for

A standard outdoor socket is for portable equipment. It is not the right way to supply an electric vehicle charger, a hot tub or a garden office. Those are large, long-running loads with their own circuit and earthing requirements, and they are assessed separately. Charging a car regularly from an ordinary outdoor socket puts a prolonged heavy load on fittings that were never designed for it.

Regulations and paperwork

All fixed wiring has to meet BS 7671. Under Part P of the Building Regulations in England, adding a socket to an existing circuit outdoors is not on the list of notifiable work, but installing a new circuit is. Either way, the electrician should test the work and give you a certificate: a Minor Electrical Installation Works Certificate for an addition, or an Electrical Installation Certificate for a new circuit, with the Building Regulations compliance certificate following where the work is notifiable.

Because the checks on the existing circuit, the earthing and the RCD protection are what make the socket safe, this is a job for a qualified electrician rather than a DIY project.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Yes. Sockets likely to supply equipment outdoors must have 30mA RCD protection under BS 7671, either at the consumer unit or built into the socket.

Often, yes. A back-to-back connection through the wall is common, provided the electrician has checked the existing circuit is suitable and the hole is sealed against water.

In England, adding a socket to an existing circuit is not normally notifiable. A new circuit is. In both cases the work should be tested and certified by the electrician.

There is no single fixed height, but it should be well clear of the ground, splashing and standing water, and easy to reach. Your electrician will advise for the position.

It is not recommended for regular use. A dedicated chargepoint on its own circuit is the appropriate solution for routine charging.