How much does PAT testing cost?
PAT testing prices depend on the equipment, its location and the time needed to inspect and test it.
Last updated
Short answer
Typical UK guide figures are around £1–£4 per straightforward item on larger organised visits, often subject to a minimum charge of £60–£150. Small, scattered or specialist inventories can cost more per item. These are not Adtec prices; Adtec gives a fixed written quote after seeing the job.
What PAT testing means for landlords, offices and workshops
PAT means portable appliance testing: inspection of electrical equipment, with suitable tests where needed. A landlord supplying plug-in equipment, an office managing workstations and a workshop using portable tools all need to consider equipment safety. Their risks differ, so the inventory and inspection programme should reflect the actual equipment and its use rather than a blanket annual booking.
HSE’s portable appliance testing FAQs explain that the Electricity at Work Regulations 1989 require equipment to be maintained safely but do not prescribe a blanket legal fixed testing interval. Retesting follows risk assessment of use, environment and previous findings. This is general information, not legal advice; ask a qualified electrician to assess each property and equipment arrangement.
Ask whether the quote includes labelling, an equipment register, inspection and test results, identification of failed items and advice about future checks. Agree whether inaccessible equipment needs a repeat visit and how repairs or subsequent retesting are charged. For help comparing the scope and suitability of providers, read how to choose an electrician.
Typical UK guide figures for PAT testing
| Work or arrangement | Typical UK guide figures |
|---|---|
| Larger organised batch of standard items | £1–£4 per item |
| Small-visit minimum charge | £60–£150 per visit |
| Around 50 accessible standard items | £80–£200 |
| Around 100 accessible standard items | £120–£350 |
Treat these bands as alternative ways a provider might price a visit, not figures to add together. A minimum charge may already include a number of items. The final total depends on travel, identification, access, recording and the checks appropriate to each appliance, rather than simply the number of stickers used.
An office with labelled equipment in one room is different from the same number of appliances spread across locked cupboards and several floors. For the actual service scope, see PAT testing. Ask whether the quotation includes the equipment register, test results and a clear list of anything that should be removed from use.
What counts as an item?
Count equipment, leads and locations
Start with a room-by-room list of equipment supplied or used for work. Include desktop computers, monitors, printers, kettles, extension leads and cleaners’ equipment where these fall within the agreed scope. Detachable mains leads may be recorded separately from their appliances, so agree the counting method before comparing a per-item price. A photograph of a desk does not always reveal every power supply underneath it.
Not every electrical product needs the same test. Some require an inspection and appropriate electrical tests; others may need a different approach because of their design. Sensitive electronic equipment must not receive unsuitable tests. Explain any medical, production or specialist equipment at the enquiry stage so the contractor can confirm the limits of the proposed visit and avoid a misleading headline rate.
Why access and preparation change the total
Labour is spent finding equipment and making it available as well as inspecting it. If staff are using every workstation, the person carrying out the checks may need to return repeatedly or work through an agreed sequence. A building contact who can unlock rooms and identify equipment owners makes the programme easier to manage without confusing tested items with those still outstanding.
Before the visit, circulate instructions about which equipment needs to be accessible and which tasks will be interrupted. Do not unplug essential systems without agreement from the people responsible for them. For server racks and communications equipment, coordinate with your IT team rather than treating a routine inspection visit as an IT shutdown. Commercial electrical services can be discussed alongside wider installation work, but that is a separate scope from appliance testing.
Want a fixed written quote? Call 01235 430442 or send us the details.
Frequency, legal duties and useful records
A sticker is not the maintenance policy
UK workplace duties concern maintaining electrical equipment so that it does not present danger. There is no universal rule that every appliance must receive a combined inspection and test every year. The appropriate frequency depends on the equipment, its use, environment, previous findings and a suitable assessment of risk. A frequently moved extension lead on a busy worksite presents different risks from a monitor that remains on a desk.
Our PAT testing requirements guide explains that distinction. Keep an equipment register and act on defects rather than simply filing the results. Fixed wiring is assessed separately: commercial EICRs concern the installation, not a replacement check for every kettle and plug-in appliance. Budgeting for one does not automatically cover the other.
When to call a professional
Arrange advice when your inventory is uncertain, equipment has been damaged, previous results show repeated failures or you cannot decide suitable inspection intervals. Stop using an appliance with a damaged plug, exposed conductors, scorching or signs of overheating. Do not leave suspect equipment available for someone else to pick up while you wait for a scheduled testing day.
A failed item does not always need replacing, but it should not return to service until the defect has been properly addressed and any necessary checks completed. Ask how failures will be reported, whether repairs require separate approval and whether a return visit would be charged. If sockets, fixed supplies or protective devices are also causing concern, discuss electrical maintenance rather than assuming an appliance label establishes that the whole building is safe.
How to request a comparable written quote
Send an approximate item count, the site address, the number of floors and rooms, normal opening hours and any restricted areas. Identify equipment that cannot be disconnected and say whether you have an existing register. Ask providers to set out their counting rules, minimum charge, exclusions, VAT treatment and the records supplied, so you can compare the same job rather than incompatible rates.
Adtec Electrical Services Ltd works across Oxfordshire and surrounding counties, with commercial work generally within about 35 miles of Lyford. Office hours are Monday to Friday, 7:30am to 5:30pm. Use contact to discuss access and scope; the fixed written quote follows seeing the job. Keep repairs, extra equipment discovered on site and any fixed-installation investigation clearly separated from the agreed inspection price.
Want a fixed written quote? Call 01235 430442 or send us the details.
