Skip to content
Adtec Electrical Services

What PAT testing does your business actually need?

A sensible equipment safety programme starts with the risks in your workplace rather than a blanket annual sticker renewal.

Short answer

UK law requires electrical equipment used at work to be maintained so it does not cause danger, but does not prescribe annual PAT testing for every appliance. A risk-based combination of user checks, formal visual inspection and appropriate electrical testing is usually the practical approach. Set the scope and intervals around the equipment, environment and experience of damage, then review the results.

What the law requires, and what PAT means

The Electricity at Work Regulations 1989 require electrical systems to be maintained, so far as reasonably practicable, to prevent danger. Portable appliance testing is a familiar name for part of an equipment maintenance regime, not a separate annual legal certificate that every business must buy. Other workplace duties can also apply, depending on who uses the equipment and where.

Maintenance is the duty; testing is one tool

A business should be able to explain how it manages equipment safety. That may involve staff reporting damage, routine visual checks and instrument testing where appropriate. A sticker alone cannot show that the right equipment was examined or that a dangerous item was taken out of use. Equally, buying a tester does not automatically make its operator competent.

Our PAT testing service can form part of that planned approach. The wider testing and certification service covers different electrical checks, which should not be confused with one another. Agree the purpose of the visit before comparing proposals, particularly if a lease or customer contract specifies particular evidence.

Decide which equipment belongs in the programme

Begin with an inventory of equipment used for work, including items stored away or taken off site. Think about extension leads, chargers, kitchen appliances, cleaning equipment and tools, not just desktop computers. Equipment that stays in one place can still need maintenance; the word portable should not become a reason to ignore an appliance with a plug.

Ownership is not the only question

Hired, borrowed and employee-owned items need an agreed policy if they are used for work. Clarify who checks hired equipment on arrival, what evidence the supplier provides and how defects are reported during use. At shared premises, record whether the landlord, tenant or facilities team handles communal appliances so that each side is not assuming the other has done it.

Battery-powered equipment itself may need different checks from its mains charger. Fixed equipment can also fall within an equipment maintenance programme, but inspecting its supply circuit is a different task. Discuss uncertain items with the competent person rather than excluding them by size, value or the difficulty of reaching their plug.

Choose intervals based on actual risk

There is no universal legal rule that every office kettle, monitor and drill needs the same annual combined inspection and test. Consider how often equipment moves, the likelihood of cable damage, environmental conditions, users and the consequences of a fault. Construction tools and equipment in wet or harsh locations may require much closer attention than protected equipment in a clean office.

Use evidence to adjust the schedule

Previous results are valuable. Repeated damaged plugs or trapped flexes suggest that the interval, equipment choice or working method needs changing. A consistently low defect rate can support a different schedule where a competent assessment justifies it. An insurer, client or contract may impose requirements beyond the baseline legal approach, so check those documents rather than assuming the maintenance plan overrides them.

Keep user checks, formal visual inspection and electrical testing separate in the schedule. They serve different purposes and need not happen at identical intervals. Review the plan after a move, flood, refurbishment or major change in equipment use. The PAT testing cost guide explains the scope questions that affect quotations without treating item count as the only consideration.

What checks and tests should cover

A visual inspection can identify exposed conductors, cracked cases, heat damage, unsuitable repairs and leads pulled away from their anchorage. It can also reveal inappropriate extension arrangements or equipment unsuited to its environment. These are important findings even where an instrument reading would fall within the relevant limit. Inspection should not be reduced to scanning an asset label.

Electrical tests depend on the equipment construction and the appropriate procedure. Class I equipment relies on a protective earth, while Class II equipment uses double or reinforced insulation and does not require the same earth continuity assessment. The competent tester selects suitable methods and limits, taking account of electronic components and manufacturer guidance rather than applying every available test indiscriminately.

Before attendance, identify equipment that cannot be disconnected casually, including servers, communications systems, refrigeration and specialist machinery. Agree controlled shutdowns with the responsible operator. Some equipment needs specialist knowledge or a separate maintenance contractor. A general appliance testing visit should not be assumed to include internal servicing, calibration or confirmation that a machine is mechanically safe.

Want a fixed written quote? Call 01235 430442 or send us the details.

Records, labels and failed equipment

A useful record identifies the appliance, location, inspection date, relevant results, outcome and person completing the work. It should distinguish equipment inspected from items inaccessible, unavailable or excluded by agreement. Asset identifiers help track a device when it moves rooms; room names alone are rarely enough once desks and departments change.

Make the failure process clear

Agree who can remove defective equipment from service and who authorises repair or replacement. Mark or segregate unsafe items so they are not accidentally plugged back in. A failed appliance should not return to use simply because someone removes the label or fits a new fuse. Appropriate checking after repair is part of closing the issue.

Labels can help staff recognise equipment and find its records, but they are not the maintenance system itself. Record the reasoning behind future inspection dates and retain earlier results so trends are visible. A clear exception list is especially useful for large sites: it stops an apparently complete spreadsheet concealing a locked store cupboard or an unvisited satellite office.

PAT testing is not an EICR

PAT concerns electrical equipment within the agreed scope, while an Electrical Installation Condition Report assesses the fixed installation within its own agreed extent and limitations. Sockets, distribution boards and fixed wiring do not become satisfactory because the appliances plugged into them have passed inspection. The reverse is also true: a satisfactory installation report does not establish that every appliance is safe.

If both are due, plan commercial EICR testing alongside equipment checks, but keep the records and responsibilities distinct. Landlords should also distinguish workplace equipment maintenance from the duties discussed in our landlord EICR guide. The applicable rules depend on the premises and tenancy, not merely whether a landlord supplied a kettle.

On a practical level, coordinating visits may make access easier, but it does not remove the need for suitable isolation and separate scopes. Tell the contractor about critical circuits, tenants, working hours and any vulnerable occupants. Good planning reduces disruption without turning either inspection into a superficial exercise.

When to call a professional

Arrange competent help if equipment gives a shock or tingling sensation, has heat damage, smells burnt or repeatedly trips a protective device. Stop using the suspect item and isolate it if safe; do not open its case or try alternative fuses to keep it running. If the fault may involve the socket or wiring, explain that when requesting help.

Professional input is also useful when creating the first asset register, managing mixed equipment across several work areas or reviewing a pattern of failures. Ask what qualifications, experience and equipment support the proposed work, what the report will contain and how exclusions will be recorded. Competence needs to match the task, particularly for unusual equipment or challenging environments.

Adtec Electrical Services Ltd carries out PAT testing and other electrical testing work across Oxfordshire and surrounding counties. Use commercial electrical services to consider related installation needs, or contact Adtec with the equipment list, access restrictions and any contractual requirements. Agree the inspection scope and shutdown arrangements before booking a date.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

New equipment should normally be supplied in a safe condition, but obvious damage and suitability still need checking before use. Your workplace policy or contract may require additional acceptance checks, so record what was done rather than assuming a missing sticker proves a breach.

Yes, simple user checks can be carried out by staff who know what to look for and how to report defects. Formal inspection and testing need competence appropriate to the equipment and procedure, which may require further training and experience.

Employers should consider electrical equipment used for work at home within their risk assessment. The controls may differ from those for a busy workshop, and clear reporting arrangements can be more useful than automatically sending every household appliance for testing.

Some inspection and test procedures require equipment to be disconnected, so assume there may be interruption until the scope is agreed. Ask your IT team to plan shutdowns, backups and restarts for equipment supporting shared services.

There is no single universal PAT record retention period covering every workplace. Keep enough history to support your risk assessment and maintenance decisions, and check contractual, insurance and sector-specific requirements before setting a retention policy.

Related pages

CallQuote