Planned electrical maintenance: what a business schedule should cover
Most commercial electrical systems get attention only when something stops working. A simple planned schedule replaces a string of urgent call-outs with a short list of known tasks at known times, and leaves a record that shows the system has been looked after.
Last updated
Short answer
A planned electrical maintenance schedule normally covers periodic inspection and testing of the fixed installation, routine checks of distribution boards, emergency lighting tests, portable appliance checks at intervals set by risk assessment, lighting maintenance and a running list of small repairs. The Electricity at Work Regulations 1989 require workplace electrical systems to be maintained so as to prevent danger, without prescribing a fixed timetable. Intervals are set from the type of premises, BS 7671 guidance and the previous inspection. Part P applies to dwellings, not workplaces, but the work still calls for a competent, qualified electrician.
Why plan it at all
The duty under the Electricity at Work Regulations 1989 is on the employer or whoever controls the premises. It is a duty to keep the system safe, and the practical way to demonstrate that is a record of inspection, testing and repair. Leases often add their own obligations, and insurers commonly ask for evidence of periodic inspection.
There is also a plain operational argument. Failures found during a planned visit are repaired at a time of the business's choosing. Failures that announce themselves do so during trading hours.
Periodic inspection and testing
The core of any schedule is the Electrical Installation Condition Report on the fixed wiring. The interval between reports is recommended by the previous inspector on the basis of the type of premises, its use and its condition, drawing on the guidance that accompanies BS 7671. Offices and shops are commonly on a longer cycle than industrial units, and special environments are shorter still. Our guide to how often a commercial EICR is needed sets out the usual intervals.
On larger sites the inspection can be divided into sections and spread across the cycle, so that the whole installation is covered by the end of it without a single long shutdown.
Distribution board checks
Between full inspections, a routine look at each distribution board picks up problems early. The check covers signs of overheating, damaged or missing covers and blanks, security of the enclosure, dust and debris, the accuracy of the circuit chart and operation of RCD test buttons. A thermal check under load can reveal a loose connection before it fails. Anything found is noted and either dealt with on the visit or priced.
Emergency lighting
Emergency lighting needs regular testing to show that it will work when the mains supply fails. The pattern commonly followed under BS 5266 is a brief monthly function test and an annual full-duration test, with results entered in a logbook. The short tests are often done by trained staff on site and the annual test by a contractor. Your fire risk assessor confirms what applies to your premises. See our guide to emergency lighting testing.
Want a fixed written quote? Call 01235 430442 or send us the details.
Portable and movable equipment
There is no fixed legal interval for testing portable appliances. The frequency of user checks, formal visual inspections and combined inspection and testing is decided by risk assessment, according to the type of equipment and the environment it is used in. A power tool in a workshop warrants more attention than a monitor on an office desk. Our guide to PAT testing requirements explains the approach.
Lighting and small works
Failed lamps and fittings are more than a nuisance where they affect stairs, loading areas or workstations. Some businesses have fittings replaced as they fail; others arrange a periodic round, which is more efficient where access equipment is needed for high ceilings. The same visits can take care of the small jobs every building accumulates: a cracked socket, a loose trunking lid, an additional outlet for new equipment. Keeping a running list between visits means nothing is forgotten and the electrician arrives with the right materials.
Records to keep
- The current EICR and evidence that any remedial work has been completed.
- Installation and minor works certificates for alterations.
- Up-to-date circuit charts at each board.
- The emergency lighting logbook.
- Appliance inspection and test records.
- A simple log of faults reported and how they were resolved.
Kept in one place, these answer most of the questions an insurer, landlord, enforcing authority or incoming facilities manager is likely to ask.
Setting up a schedule
Start with what exists: the date and outcome of the last EICR, the state of the logbooks, and any outstanding observations. From there a calendar is drawn up showing what is due each month or quarter, who carries it out, and which tasks need a shutdown. Review it when the use of the building changes, when new machinery is installed or after any significant alteration.
A schedule should be proportionate. A small office needs little more than its periodic inspection, emergency lighting tests and an annual walk-round. A busy industrial unit needs more. Our electrical maintenance page explains how we set this up with businesses.