Shop lighting: planning the lighting for a retail unit

Lighting is the part of a shop fit-out customers notice without realising it. It decides whether stock looks appealing, whether the window draws people in and whether the space feels open or cramped. It is also one of the first things the electrician needs settled.

Last updated

Short answer

A shop lighting scheme is built in layers: general lighting to see and move by, accent lighting to draw attention to products, window lighting that works in daylight as well as after dark, and functional lighting for tills, fitting rooms and stock rooms. Track systems give flexibility as displays change. Colour quality matters as much as brightness. Emergency lighting and controls complete the scheme. The installation is designed and tested to BS 7671; Part P does not apply to retail premises, but the Electricity at Work Regulations 1989 do, so use a qualified electrician.

General lighting

General, or ambient, lighting provides the base level that lets customers move around and see the whole space. It may come from recessed panels or downlights in a suspended ceiling, linear fittings, or suspended fittings in a unit with an exposed soffit. It should be even and free of glare, and for many shops it is deliberately kept moderate so that accent lighting has something to stand out against. A shop lit uniformly to a high level looks flat.

Accent lighting

Accent lighting picks out what the retailer wants noticed: a feature wall, a display table, a mannequin, a shelf of new stock. It uses directional fittings with a controlled beam, aimed so that the lit product is noticeably brighter than its surroundings. Narrow beams suit single items; wider beams wash a wall or a rail.

The angle matters. Light from directly overhead leaves vertical displays in shadow, while light aimed across the product from in front reveals texture and colour. Aiming is done after the shop is merchandised and repeated when displays change, which is the main argument for track.

Track lighting

Lighting track is a powered rail fixed to the ceiling or suspended beneath it. Spotlights clip in anywhere along its length and can be added, removed, moved and re-aimed without an electrician once the track is installed. Multi-circuit track allows different groups of spots on the same rail to be switched or dimmed separately.

For a retailer whose layout changes with the seasons, track avoids rewiring. The track type should be agreed before fittings are bought, as adaptors are specific to each system.

Window lighting

A shop window has to compete with daylight. Reflections on the glass during the day hide a dimly lit display, so window lighting is brighter than most people expect, concentrated on the display and shielded so that the sources are not visible from the pavement. After dark the same lighting can be reduced.

Window and signage lighting usually runs for longer hours than the sales floor. Putting it on its own circuit with a time switch or photocell means it looks after itself. External signs need a supply and a means of isolation for whoever maintains them; the sign itself is normally supplied by a signage company.

Colour quality

Two properties of a light source affect how stock looks. Colour temperature describes whether the light appears warm or cool; warmer light flatters wood, food and textiles, while cooler light reads as crisp and suits technical products. Colour rendering describes how faithfully colours appear compared with natural light, and for clothing, food, flowers, cosmetics and art it is worth specifying a high figure.

Whatever is chosen should be consistent. Mixing sources of different colour temperature in one space, or replacing failed lamps with whatever is to hand, makes a shop look patchy.

Want a fixed written quote? Call 01235 430442 or send us the details.

Tills, fitting rooms and stock rooms

  • Till points need good, glare-free light on the counter without reflections on screens.
  • Fitting rooms benefit from light on the face and body from in front, not a single downlight overhead.
  • Stock rooms need plain, efficient lighting, usually on presence detection.
  • Staff areas and toilets are lit simply and controlled automatically.

Controls

Dividing the lighting into sensible groups, each on its own switch or dimmer channel, lets the shop be set for opening, trading, cleaning and closed. Time control for windows and signs, presence detection for back-of-house and simple scene setting for the sales floor are usually all a small shop needs. Our guide to commercial lighting controls explains the options. Dimming needs compatible drivers, so decide on it before fittings are ordered.

Emergency lighting

Shops open to the public need lighting that operates if the supply fails, so that customers and staff can find their way out. Where fittings go is determined by the fire risk assessment and the layout: exits, changes of direction, stairs and changes of level, and near fire-fighting equipment. Emergency fittings can be separate units or versions of the main fittings with a battery pack. See our emergency lighting page.

Working to a fit-out programme

Shop fit-outs are usually fast. To keep to programme the electrician needs the ceiling type and height, a lighting layout or at least the positions of track and feature lighting, the fittings or their specifications including drivers, and the landlord's requirements for the unit. Fittings on long delivery are the commonest cause of delay, so order early. The power side of a fit-out is covered in our guide to shop fit-out electrics, and our shop fit-outs page describes the service.

On completion the installation is tested and an Electrical Installation Certificate issued, which landlords generally ask for at handover.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

A layered scheme: moderate general lighting, directional accent lighting on products, bright window lighting and simple functional lighting behind the scenes.

Usually, where displays change. Spotlights can be moved and re-aimed along the track without altering the wiring.

It depends on the stock. Warmer light suits food, wood and textiles; cooler light suits technical products. Consistency across the space matters most.

Premises open to the public generally do. The fire risk assessment determines where fittings are needed.

No. Part P covers dwellings. Retail installations are designed and tested to BS 7671 by a qualified electrician.