What lighting levels does your warehouse need?

A warehouse lighting plan should follow the work people do, not just the floor area or the wattage of the existing fittings.

Short answer

Warehouse lighting levels depend on the task: general storage needs differ from detailed picking, packing and inspection. As early design examples, bulk storage may be around 100 lux, active aisles around 150 to 200 lux, and packing or dispatch tasks around 300 lux, with higher levels for demanding visual work. These are indicative starting points, not universal compliance targets; a competent designer should select maintained levels and other quality criteria for the actual activities.

Start with tasks rather than a single lux target

Lux measures illuminance, the amount of light arriving at a surface. It does not tell the whole story about whether people can read labels, recognise hazards or judge moving vehicles. The correct design depends on task size, contrast, duration, working height and the people carrying out the work, together with the wider workplace risk assessment.

Separate the working zones

A building described as a warehouse may include bulk storage, hand picking, conveyor work, loading bays, packing benches and inspection stations. Treating all of those as one lighting task can leave detailed work underlit while wasting energy in little-used space. Mark each activity on a floor plan, including temporary areas used during seasonal peaks.

Our warehouse lighting service starts from these practical requirements. A design should reference suitable current guidance, such as BS EN 12464-1 where applicable, and state its assumptions. It should not promise compliance merely because a supplier’s brochure lists an average lux figure for an empty rectangular building.

Use guide levels carefully

The figures below are only early planning examples for ordinary indoor warehouse activities. They are not a substitute for selecting the relevant task category and full design criteria. Workplace lighting duties, risk assessment, accessibility needs and the actual visual task can call for a different solution, especially where fine detail or moving machinery is involved.

Indicative maintained illuminance examples for initial planning; confirm task-specific design criteria.
Area or taskIllustrative starting pointImportant qualification
Bulk storageAround 100 luxReading and handling tasks may need more
Active storage aislesAround 150–200 luxCheck vertical rack faces and labels
Packing and dispatch workAround 300 luxDetailed tasks can require higher levels
Detailed inspectionOften 500 lux or moreSelect for the actual defect and contrast

Maintained illuminance means the level intended after allowing for factors such as dirt accumulation and light output depreciation, not simply the impressive reading beneath a new fitting. Ask how the maintenance factor was chosen and what cleaning and replacement plan it assumes. A design based on unrealistic upkeep may fall short well before the business expects to review it.

Also establish the measurement plane. A reading on the floor does not establish the light available on a packing bench or a vertical shelf label. Designers should identify the relevant horizontal, vertical or inclined surfaces, alongside the surrounding areas that affect visual comfort and safe movement between tasks.

Survey the building with the racking in place

Collect the building dimensions, mounting heights, roof structure, rack positions and likely obstructions before selecting fittings. High racks create shadows, and a luminaire over the rack top may contribute little useful light to the aisle. Changes to storage height can therefore undermine a scheme even if none of the electrical equipment has been altered.

Record the conditions behind any readings

A useful survey records where, when and how measurements were taken, including daylight conditions, operating fittings and the task plane. One bright reading directly below a luminaire is not representative of an entire aisle. Multiple readings on an appropriate grid help reveal dark patches, unevenness and differences between the ends and centre of the working area.

Include surfaces and housekeeping in the assessment. Dark stock, dusty roof members and dirty lenses affect performance, while reflective wrapping can create uncomfortable highlights. Tell the designer about future mezzanines, partitions and automated equipment before the layout is finalised. Our warehouse and industrial electrical service can help coordinate lighting with the wider installation scope.

Look beyond average brightness

A high average lux value can conceal a poor installation if some locations are very bright and others remain dark. Uniformity matters for task visibility and adaptation as people move. The designer should assess the appropriate minimum-to-average relationship for the relevant activity rather than relying only on total lumens divided by floor area.

Glare and moving equipment

Glare can arise when operators look upward towards stock or travel along an aisle facing a bright fitting. Optics, mounting position and shielding should suit these sightlines. Forklift routes, pedestrian crossings and areas where people step from daylight into the building deserve particular attention because visual adaptation and hazard recognition can affect safety.

Colour rendering helps distinguish labels, cable colours and product details, while colour temperature affects the appearance of the space rather than directly proving visibility. Flicker and stroboscopic effects also need consideration around moving or rotating machinery. A qualified design should address these quality factors and relevant product data, not assume every LED fitting behaves identically.

Want a fixed written quote? Call 01235 430442 or send us the details.

Choose optics, controls and suitable fittings

Narrow aisle optics can direct light along rack faces, while open areas may need a different distribution. The correct arrangement is often more important than choosing the most powerful high bay fitting available. Check mounting requirements, ambient temperature, dust, moisture and any impact risks so the product is suitable for its environment and accessible for maintenance.

Occupancy control can reduce energy use in intermittent storage aisles, but detection needs to cover the actual movement and approach paths. Lights should respond in time for safe entry, and settings should not leave a person working quietly in darkness. Coordinate neighbouring zones and any background illumination needed for circulation rather than treating each sensor as an isolated accessory.

Daylight control can be useful beneath rooflights where natural light genuinely reaches the task. Consider uneven daylight, glare, dirty rooflights and seasonal changes when commissioning the system. The commercial LED upgrade guide explains the wider planning issues when replacing older fittings, including why a simple watt-for-watt comparison can be misleading.

Keep emergency lighting and installation safety separate

Normal lighting supports everyday work; emergency lighting provides a separate safety function when the normal supply fails. An efficient new general lighting installation does not by itself establish adequate escape-route or other required emergency illumination. Racking alterations and changed escape routes can affect both systems and should be discussed with the responsible person.

Include emergency lighting in the project review and keep the relevant testing arrangements current. The emergency lighting testing guide explains why routine checks and records remain necessary after a refurbishment. Do not assume that a fitting containing a battery automatically meets every emergency lighting requirement for its location.

Installation planning should cover safe access at height, isolation, loading-bay operations and how areas will be segregated from normal work. Agree who moves stock or vehicles and whether the programme needs phases. Existing circuits, controls and protective devices need assessment before extra or replacement fittings are connected; modern light sources do not eliminate those electrical considerations.

When to call a professional

Arrange a lighting assessment if staff cannot comfortably read labels, frequent shadows hide hazards, fittings cause glare or the layout has changed substantially. Repeated failures, visible heat damage or tripping circuits also call for electrical investigation rather than simply fitting brighter lamps. Keep unsafe areas controlled through the site’s normal safety arrangements while the issue is assessed.

For quotations, provide drawings, working heights, task descriptions, operating hours, rack layouts and known access restrictions. Ask for the selected design criteria, predicted performance, controls strategy and the handover checks included. Comparing proposals only by fitting count or total wattage can conceal major differences in useful light, installation effort and maintenance needs.

At completion, request operating instructions, electrical certification for the installation work and the agreed commissioning records. Confirm sensor settings and check performance against the design under appropriate conditions before treating the project as finished. Contact Adtec to discuss a survey and the commercial electrical work needed to coordinate lighting with the rest of the premises.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

A phone app can help identify relative differences but is not a reliable basis for verifying a professional design. Suitable calibrated measuring equipment and a documented measurement method are needed for meaningful assessment.

Not necessarily, because the rack layout and beam distribution may be the main problem. Repositioning fittings or using more suitable optics can be more effective than increasing output above an obstruction.

Only where the detection, timing and operating conditions make them appropriate. Busy vehicle routes and areas with stationary tasks need careful control design so energy saving does not compromise visibility.

A significant layout change is a good reason to review the design and take appropriate measurements. Check escape routes and emergency lighting at the same time, since moving stock can affect both normal working visibility and evacuation arrangements.

That depends on access equipment, isolation needs and the ability to segregate work safely. Agree a site-specific programme with the contractor and site management rather than assuming that replacing fittings above active operations is acceptable.