Why do LED lights flicker? Causes, fixes and when to get it checked
LED lighting behaves differently from the lamps it replaced. An old filament lamp smoothed over small disturbances in the supply; an LED, driven by electronics, can show them. Most LED flicker has a simple cause, but a few of the possible causes are faults that should not be ignored.
Last updated
Short answer
LED lights most often flicker because of an incompatible or underloaded dimmer, a poor-quality or failing driver in the lamp, or a transformer not designed for LEDs. A faint glow or occasional flash when switched off is usually a tiny leakage current through the switch wiring. Flicker caused by a loose connection is a fire risk and needs an electrician, as does any flicker accompanied by buzzing, heat or a burning smell.
How an LED lamp differs
An LED produces light from a small electronic component that runs on low-voltage direct current. The mains is alternating current, so every LED lamp or fitting contains a driver, a compact power supply that converts one to the other.
The quality of that driver decides how steady the light is. A good driver holds its output constant despite small changes at its input. A cheap one passes those changes straight through as visible flicker, and its components are more likely to degrade with heat and age. This is why two lamps that look identical on the shelf can behave quite differently in the same fitting.
Dimmers: the most common cause
If the flickering lights are on a dimmer, start there. Older dimmers were designed for filament and halogen lamps drawing tens or hundreds of watts. A handful of LED lamps may add up to less than the dimmer's minimum load, and the dimmer then cannot regulate properly. The result is flicker, particularly at low settings, sometimes with a buzz from the lamp or the switch.
Two things are needed for good dimming: lamps that are marked as dimmable, and a dimmer designed for LED loads and matched to them. Even then some combinations work better than others, and manufacturers publish compatibility lists. Non-dimmable LED lamps on any dimmer will flicker and fail early. Our guide to dimmer switches and LED lights covers the pairing in detail.
Replacing a dimmer means working on the fixed wiring at the switch, so it should be done by someone competent to isolate and test the circuit.
Transformers and drivers on low-voltage fittings
Many older downlights use 12-volt lamps fed from a transformer in the ceiling. Those transformers were built for halogen lamps and have a minimum load. Fit low-power LED replacements and the transformer may be running below that minimum, producing flicker or flashing.
The remedy is either a driver designed for LED loads or converting the fittings to mains-voltage lamps, removing the transformer altogether. Integrated LED fittings have their own separate driver, and when that begins to fail, flicker is often the first symptom. Drivers can usually be replaced without changing the fitting.
LEDs that glow or flash when switched off
A faint glow, or a brief flash every few seconds, from an LED that is switched off is a common puzzle. LEDs need so little energy that a very small current is enough to make them respond. That current can come from a switch with a built-in indicator light, from an electronic switch, timer or sensor that draws its own power through the lamp, or from long runs of cable between two-way switches lying side by side.
It is not usually dangerous, but it is worth confirming the cause. An electrician can check that the switch is in the correct conductor, which is a safety matter, and fit a small load-correction device or a different switch to stop the glow.
Want a fixed written quote? Call 01235 430442 or send us the details.
Loose connections and wiring faults
This is the cause to take seriously. A conductor that is not firmly held in a terminal makes intermittent contact. The light flickers, often when a door slams or someone walks across the floor above, and the poor joint heats up. Over time that heat damages the terminal and the cable.
Loose connections can be at the lampholder, in the ceiling rose or fitting, at the switch, in a junction box or at the consumer unit. Signs that point this way include flicker affecting a whole room or circuit, flicker that began after other work was done, switches or fittings that feel warm, crackling sounds and any discolouration. Switch the circuit off and have it inspected. Our broader guide to lights flickering covers the checks for all lamp types.
Supply and appliance effects
A brief dip in brightness when a large appliance starts, such as a shower, a kettle or a motor, reflects a momentary drop in voltage. A slight dip can be normal. A pronounced one, or lights that get brighter as well as dimmer, suggests a problem with a connection on the supply side or within the installation and should be investigated promptly.
Some flicker comes from outside the house altogether. Network operators send control signals over the mains for certain metering and tariff systems, and some LED drivers react to them with a rhythmic flicker at particular times of day. If neighbours see the same thing, the cause is likely to be on the network.
What you can check, and what to leave
- Note which lights flicker, when, and whether a dimmer is involved.
- Swap the lamp for a known good one of a reputable make.
- Check that the lamp is marked dimmable if it is on a dimmer.
- Make sure the lamp is fully seated in its holder, with the light switched off.
Beyond that, the next steps involve opening switches and fittings and testing the circuit, which is work for a qualified electrician following BS 7671. Replacing a switch or fitting like for like is not notifiable under Part P, but it still has to be done safely. If the flicker cannot be explained by the lamp or dimmer, our fault finding service will trace it.
Want a fixed written quote? Call 01235 430442 or send us the details.
