Cable containment types: tray, basket, trunking and conduit compared
In a commercial building, cables are not simply clipped to the nearest surface. They are carried in containment: the trays, baskets, trunking and conduit that support and protect them. It is one of the largest parts of a commercial electrical installation, and the choices made affect cost, appearance and how easily the building can be altered later.
Last updated
Short answer
Cable tray and ladder carry power cables on open runs in plant rooms, warehouses and above ceilings. Wire basket is lighter and is widely used for data cabling. Trunking encloses cables fully and is used where they need protection or a neat finish, including around office walls. Conduit protects individual runs down to equipment, switches and sockets. Most installations use several types together, selected to suit the cables, the environment and BS 7671.
What containment is for
Containment does three jobs. It supports cables along their length so that they do not sag or strain at terminations. It protects them from mechanical damage, and in some environments from dust, moisture or chemicals. And it organises them, so that circuits can be identified, added and removed in an orderly way years later.
Cable tray and cable ladder
Cable tray is a perforated metal channel, fixed to walls or hung from the structure on brackets and threaded rod. Cables are laid in it and secured with ties or cleats. The perforations let air circulate around the cables, which helps them stay cool, and give plenty of fixing points. Tray is the general-purpose choice for sub-main and final circuit cabling in plant rooms, industrial units and ceiling voids.
Cable ladder looks as its name suggests: two side rails joined by rungs. It is stronger over long spans and is used for the heaviest cables, such as large armoured supplies between a main switchboard and distribution boards. Our guide to three-phase electrics for warehouses describes the distribution these cables form part of.
Wire basket
Basket tray is made from welded steel wire formed into an open mesh channel. It is light, quick to install and easy to cut and shape on site to form bends and drops, and cables can leave it at any point. Those qualities make it the usual choice for data and communications cabling, where large numbers of small cables run from a cabinet out to the floor.
It is also used for lighter power cabling above suspended ceilings and under raised floors. It gives less support than tray for heavy cables and less protection from below, so it is matched to the load. Our guide to office data cabling explains how data routes are planned around it.
Trunking
Trunking is an enclosed rectangular duct with a removable lid. Metal trunking is used in industrial and plant areas where cables need protection from knocks, and for running many single-core circuit cables together from a distribution board.
In offices, the familiar forms are plastic or aluminium dado and skirting trunking, which runs around the walls at desk or skirting height and carries sockets and data outlets on its face. It usually has separate compartments so that power and data are kept apart. Smaller mini-trunking is used for individual drops to switches and equipment where cables cannot be concealed. Trunking lets outlets be added or moved without opening walls, which suits spaces that are rearranged from time to time. Our guide to office power, floor boxes and trunking covers the alternatives for open-plan floors.
Want a fixed written quote? Call 01235 430442 or send us the details.
Conduit
Conduit is tube, in steel or plastic, through which cables are drawn. It takes circuits from the main containment route to their final destination: a light switch, a socket, a machine isolator or a light fitting. Steel conduit gives very good mechanical protection and is common in workshops, warehouses, car parks and anywhere exposed wiring might be struck. Plastic conduit is lighter and resists corrosion.
How the choice is made
The starting point is the cables: their type, size, number and weight, and how much heat they give off when grouped together. Cables bunched tightly in an enclosed space can carry less current than the same cables spaced out on an open tray, so containment choice and cable sizing are worked out together as part of the design to BS 7671.
The environment comes next. A dry office ceiling void, a dusty warehouse, a commercial kitchen that is washed down and an outdoor yard each call for different materials and levels of protection. Fire is a further consideration: cables in escape routes must be supported so that they do not fall and obstruct people if a fire weakens their fixings, which in practice means metal supports and not plastic clips alone.
Segregation matters too. Mains power, data cabling and safety systems such as emergency lighting and fire alarms are kept separate, both to prevent interference and so that a fault on one cannot affect another.
Planning for the future
The cost of containment is largely in the labour of fixing it at height and through the building. Fitting a slightly wider tray or basket at the start, with room for additional cables, costs little more. Returning later to install a second route alongside a full one costs a great deal more and disrupts the occupier.
Although Part P of the Building Regulations applies to dwellings and not to commercial premises, commercial work is still designed, installed, tested and certified to BS 7671, and the duty holder has responsibilities under the Electricity at Work Regulations to keep the installation safe. Our commercial electrical page sets out the range of work we carry out.