Office power: floor boxes, trunking and getting power to desks
Where the sockets are decides where the desks can go. In an office, the method used to distribute power and data sets how easily the space can be rearranged and how tidy it stays once people move in.
Last updated
Short answer
Power reaches office desks in four main ways: dado or skirting trunking around the walls, floor boxes fed from under a raised floor or within the screed, power poles dropping from the ceiling void, and under-desk power units plugged into any of these. The right choice depends on the floor construction, how often layouts change and whether desks sit against walls or in the open. Circuits are designed to BS 7671 with RCD protection and with the earthing arrangements that concentrations of IT equipment need. Part P does not apply to offices, but the work must be done and certified by a qualified electrician.
Dado and skirting trunking
Perimeter trunking is a plastic or metal channel fixed along the wall at desk height or skirting level, with sockets and data outlets mounted in its lid. It has separate compartments for power and data cables. Outlets can be added or moved along its length without disturbing the wall, which makes it the workhorse of small and medium offices.
Its limit is reach. It serves desks placed against the walls. Once desks are arranged in islands in the middle of the room, the gap is bridged with extension leads, which is exactly what a planned installation should avoid.
Floor boxes
A floor box is a recessed enclosure with a hinged lid, set flush with the floor finish, containing power sockets and data outlets. Leads exit through a slot in the closed lid. In offices with a raised access floor, boxes are set into the floor panels and fed from cables or a busbar system in the void beneath; moving a box means lifting panels, not digging up the floor.
Without a raised floor, boxes can be served by ducts cast into the screed, but that fixes their positions for the life of the floor. In an existing building with a solid slab, cutting channels for new floor boxes is disruptive and sometimes ruled out by the structure or the landlord. Floor finish matters too: the box lid is cut to take a piece of the carpet or vinyl so that it sits level.
Power poles and ceiling-fed drops
A power pole is a slim vertical column fixed between floor and ceiling, carrying power and data cables down from the ceiling void to outlets at desk height. Poles reach island desks in buildings where the floor cannot be used, and they can be relocated when the layout changes, provided the ceiling void is accessible. They are visible, which some occupiers dislike, and they need a sound fixing at the top and bottom.
Under-desk and on-desk power units
Purpose-made desk power modules mount beneath or on the worktop and present sockets, and often USB charging, where staff need them. They connect by a manufactured lead to a floor box, trunking outlet or underfloor busbar. They are different from domestic extension leads: they are designed for fixed commercial use, individually fused or protected, and can be linked in a controlled way.
Chains of extension leads plugged into each other are a common finding in offices that have outgrown their sockets. They create trip hazards and can overload the outlet they start from. Enough properly installed outlets remove the need.
Which suits which office
| Method | Best suited to | Main limitation |
|---|---|---|
| Perimeter trunking | Smaller offices, desks against walls | Does not reach island desks |
| Floor boxes with raised floor | Open-plan offices that are reconfigured | Needs a raised access floor |
| Floor boxes in screed | New floors with a settled layout | Positions are fixed |
| Power poles | Island desks over a solid floor | Visible; needs ceiling void access |
Want a fixed written quote? Call 01235 430442 or send us the details.
Circuit design for office equipment
Office equipment draws modest power per desk, but there is a lot of it and it runs all day. Circuits are arranged so that no single circuit serves too many desks, and so that a fault affects a limited area. Printers, kitchen points and comms cabinets are kept on circuits separate from desk power. Socket-outlets have RCD protection as BS 7671 requires.
Computers and their power supplies pass small currents to earth in normal operation. Many of them on one circuit add up, which can cause RCDs to trip without any fault and places particular demands on the earthing of the circuit. BS 7671 has specific requirements for circuits with high protective conductor currents, and the electrician designs the number of desks per circuit and the earthing arrangements to suit.
Keeping power and data together but separate
Every desk needs both. Planning them as one exercise means containment is sized for both sets of cables, kept in separate compartments, and outlets end up side by side. Our guide to office data cabling covers the data side, including where the cabinet should go.
Planning for change
Offices are rarely laid out the same way for long. Allow spare capacity at the distribution board, spare compartments in trunking, and more outlets than the first layout needs. Record what has been installed on a drawing, with circuit references on each outlet, so that a future change does not start with tracing cables.
If you are taking on existing space, an inspection before fit-out shows what can be reused; see electrics when leasing commercial premises. For the installation itself, see our office electrical page.
Testing and certification
New circuits and alterations are inspected, tested and recorded on an Electrical Installation Certificate or a minor works certificate as appropriate. The Electricity at Work Regulations 1989 place the duty to keep the system safe on the employer, and those certificates form part of the records that show it has been met.