What does it cost to charge an electric car at home? How to work it out
There is no single figure for the cost of charging an electric car, because it depends on your car, your tariff and when you plug in. The good news is that the sum is simple, and once you know the handful of factors involved you can work out your own number in a minute.
Last updated
Short answer
The cost of a charge is the energy you put into the battery, in kilowatt-hours, multiplied by the price you pay per kilowatt-hour, plus a small allowance for charging losses. The biggest factors are the unit rate on your tariff and whether you charge during off-peak hours. A dedicated home charger makes it practical to schedule charging for the cheapest periods.
The basic sum
Electric car batteries are measured in kilowatt-hours, the same unit that appears on your electricity bill. A car with a 60 kWh battery takes about 60 units of electricity to go from empty to full.
To find the cost of a charge, multiply the number of units added by the unit rate on your tariff. If you are topping up from 30 per cent to 80 per cent, you are adding half the battery's capacity, so use half the kWh figure. Your unit rate is printed on your bill or shown in your supplier's app. The daily standing charge is paid regardless and does not change with how much you charge.
We have deliberately not printed prices here. Unit rates change several times a year and vary between suppliers and tariffs, so any figure would be out of date quickly. The method stays the same.
Working out the cost per mile
A full-battery figure is not especially useful day to day, because most charging is topping up. Cost per mile is the better measure. Cars report their efficiency in miles per kWh; divide your unit rate by that figure and you have the cost of each mile.
Efficiency varies with the car, speed, temperature and driving style. Small cars at town speeds do well; large vehicles on winter motorways do noticeably worse, partly because heating the cabin draws from the same battery. Use the average your own car reports over a few weeks for a realistic figure.
What changes the cost
- Your tariff. This is the largest factor. A standard single-rate tariff charges the same at all hours. Electric vehicle and time-of-use tariffs offer a much lower rate for a set window, usually overnight.
- When you charge. On a time-of-use tariff, the same charge can cost several times more in the early evening than at night.
- Charging losses. Not all the energy drawn from the wall reaches the battery. Some is lost as heat in the cable, the car's on-board charger and the battery itself. Around ten per cent is a reasonable allowance, and losses are proportionally higher at very low charging rates.
- Pre-heating and standby. Warming the car while plugged in, and the charger's own small standby consumption, add a little.
- Solar panels. A charger that can follow surplus solar generation lets some miles come from electricity you would otherwise export.
Off-peak tariffs and smart charging
Home chargers sold in Great Britain have to include smart functions, which means you can set a schedule in the app and the car will charge only during your chosen hours. Paired with a tariff that has a cheap overnight window, that is how most owners bring their cost per mile down.
The speed of the charger matters here. A typical 7 kW unit can add a substantial amount of range within a short off-peak window, whereas a three-pin lead may not finish in the cheap hours and spills into the standard rate. Some tariffs go further and control the charging times for you in exchange for a lower rate.
It is worth checking the peak rate and standing charge on any such tariff, as the rest of the household's electricity use is billed on it too.
Want a fixed written quote? Call 01235 430442 or send us the details.
Home charging compared with public charging
Public charging has to cover the cost of the equipment, the site and, for rapid chargers, a very large electrical connection. As a result the price per unit at public rapid chargers is typically well above a domestic rate, and VAT is also charged at a higher rate on public charging than on household electricity. Slower public posts usually sit somewhere in between.
That gap is the main financial case for a home charger. If you can charge at home for most of your mileage and use rapid chargers only on long trips, the average cost per mile stays close to your home rate.
Where the installation fits in
The charger itself is a one-off cost, and what affects that is covered in our guide to EV charger installation cost. If you are comparing connector and cable options, see Type 2 EV chargers explained.
The electrical side is not something to economise on by attempting it yourself. A charger needs a dedicated circuit with specific protection, and the work is notifiable under Part P of the Building Regulations. It has to be installed, tested to BS 7671 and certified by a qualified electrician. Our EV charger installation page explains how we survey and quote, and businesses considering chargers for staff or fleet vehicles can read our guide to workplace EV charging.
A quick way to estimate your own figure
Take your annual mileage and divide it by your car's miles per kWh to get the units you need in a year. Add ten per cent for losses. Multiply by the unit rate you expect to pay for most of your charging. Doing this once with your standard rate and once with an off-peak rate shows clearly whether a change of tariff is worthwhile for you.
Want a fixed written quote? Call 01235 430442 or send us the details.
