Skip to content
Adtec Electrical Services

Type 2 EV chargers explained: connectors, cables and charging speeds

Type 2 is a term most people meet for the first time when they order an electric car or start looking at home chargers. It describes the plug and socket used for everyday charging, and almost every home charger installed in the UK today is a Type 2 unit.

Last updated

Short answer

Type 2 is the standard connector for AC charging in the UK and Europe. It has seven pins, works on single-phase and three-phase supplies, and is fitted to nearly all current electric cars. A home Type 2 charger is either tethered, with a cable permanently attached, or socketed, where you plug in your own cable. On a typical single-phase home supply it delivers about 7 kW.

What Type 2 actually means

Type 2 refers to the shape and pin layout of the connector, not to a brand or a speed. The plug is round with a flattened top edge and seven contacts: the live conductors, neutral, earth and two small signal pins that let the car and the charger talk to each other.

Those signal pins are what make it safe. The charger does not energise the cable until it has confirmed that a vehicle is connected and ready, and it tells the car the maximum current it is allowed to draw. The plug is also locked in place while charging is under way. This arrangement is known as Mode 3 charging, and it is the reason a dedicated charger is preferred over a domestic three-pin socket for regular use.

Type 2, Type 1 and CCS compared

Common EV connectors in the UK
ConnectorUsed forWhere you see it
Type 2AC charging at home, work and public postsNearly all current cars and chargers in the UK and Europe
Type 1AC charging, single-phase onlySome older and imported cars; five pins with a latch
CCSDC rapid chargingA Type 2 shape with two large DC pins added underneath
CHAdeMODC rapid chargingSome older models; being phased out on new cars

If your car has a CCS inlet, the upper part of that inlet is a Type 2 socket, so a Type 2 home charger fits it directly. If you have an older car with a Type 1 inlet, a socketed Type 2 charger still works: you simply use a cable with a Type 2 plug at one end and Type 1 at the other.

Tethered or socketed?

A tethered charger has its cable permanently attached. You park, unhook the plug and connect, which is quick and convenient. The trade-offs are a fixed cable length, a cable that is always on show, and a unit that is tied to one connector type.

A socketed charger, sometimes called untethered, has a Type 2 socket on the front and you use the cable that lives in the car. It looks neater on the wall, suits households with visitors or a mix of vehicles, and lets you choose a cable length. The cost is the small routine of fetching the cable each time.

Neither is electrically better. The choice comes down to how you park, how often you charge and whether the look of the wall matters to you. An installer will also consider where the cable will lie so it is not a trip hazard across a path.

Want a fixed written quote? Call 01235 430442 or send us the details.

How fast will a Type 2 charger charge?

The connector can carry far more power than most homes can supply. Three things set the real speed, and the lowest of them wins.

  • The supply. Most UK homes have a single-phase supply, which supports a charger of around 7 kW on a 32-amp circuit. Three-phase supplies, more common at business premises, can support 11 kW or 22 kW units.
  • The charger. Units are built and set up for a particular maximum current, and the installer may set a lower limit to suit the circuit or the main fuse.
  • The car. Every electric car has an on-board charger that converts AC to DC for the battery. If that is rated at 7 kW, a 22 kW post will still only deliver 7 kW.

For most households a 7 kW Type 2 charger refills a typical daily mileage in a couple of hours and a large battery overnight. Our guide to single-phase and three-phase supplies explains how to tell which you have.

What the installation involves

Whatever connector is on the front, the electrical work behind a home charger is the same. It needs a dedicated circuit, protection against earth faults including the DC leakage that vehicle electronics can produce, suitable arrangements for the earthing of the supply, and notification to the network operator.

This is a new circuit, so it is notifiable under Part P of the Building Regulations and must be designed, installed and tested to BS 7671 by a qualified electrician. It is not a DIY project. Our guide to the home EV charger installation process walks through each stage, and the EV charger installation page explains how to ask us for a quote.

Choosing a charger: what to ask

Because Type 2 is the standard, the connector itself is rarely the deciding factor. More useful questions are whether you want tethered or socketed, how long the cable needs to be to reach the car's charging port wherever it is parked, whether you need load management to protect the main fuse, and whether you want the charger to work with solar panels or a particular tariff.

It also helps to think ahead. If a second electric car is likely, mention it at the survey so the supply is assessed with that in mind.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

Type 2 describes the connector, not the speed. Home and workplace units from about 7 kW to 22 kW are often called fast chargers, and they use Type 2. Rapid chargers at service areas use DC through a CCS connector.

If your car was sold new in the UK in recent years it almost certainly has a Type 2 or CCS inlet, and both accept a Type 2 plug. Older cars with a Type 1 inlet need a socketed charger and a Type 2 to Type 1 cable.

Tethered is more convenient for daily use with one car. Untethered is neater, more flexible for different vehicles and lets you pick the cable length. Electrically they perform the same.

Only if the property has a three-phase supply, which most homes do not, and only if the car can accept that rate on AC. On a single-phase supply the practical maximum is around 7 kW.

No. A Type 2 cable connects a car to a charging point. Charging from a three-pin socket uses a different lead with a control box, is much slower and is best treated as an occasional backup.

Related pages

CallQuote