Skip to content
Adtec Electrical Services

Illuminated and photoluminescent exit signs: which does your building need?

Every escape route in a workplace has to be signed so that people can find their way out, including when the normal lighting has failed. There are two broad ways to achieve that: signs with their own light source, and signs that glow after absorbing light. They are not interchangeable.

Last updated

Short answer

Illuminated exit signs have a light source powered from the mains with battery backup, so they stay visible for a rated period in a power failure. Photoluminescent signs store light and glow in the dark with no electrical supply, but they depend on being charged by adequate lighting beforehand and grow dimmer with time. Which is acceptable in a given location is decided by the fire risk assessment for the premises.

What the rules ask for

In England and Wales, the Regulatory Reform (Fire Safety) Order places the duty on the responsible person for the premises to make sure that emergency routes and exits are indicated by signs, and that routes requiring illumination have emergency lighting of adequate intensity if the normal lighting fails. Health and safety signage regulations require the signs themselves to use the standard pictogram of a running figure on a green background.

The detailed guidance comes from BS 5266-1, the code of practice for emergency lighting, and the related European standards for the performance of the lighting and the format of the signs. This guide is a general summary. The fire risk assessment for your building, and the person who carries it out, determine what is needed in each location. Our guide to emergency lighting regulations sets out the wider duties.

Internally illuminated signs

An internally illuminated sign is a luminaire with the exit legend on its face, lit from behind or along its edge by LEDs. It is connected to the mains and contains, or is fed from, a battery that takes over when the supply fails. The rated duration is commonly three hours.

These signs are usually installed as maintained fittings, meaning they are lit all the time the building is occupied, not only in a failure. That keeps the exit obvious in normal conditions, which matters in premises used by the public and in places where lights are dimmed. The difference is explained in our guide to maintained and non-maintained emergency lighting.

Externally illuminated signs

The alternative is a plain rigid sign with an emergency luminaire positioned to light it. The sign has no electrical parts; the nearby fitting provides the illumination in an emergency. This is a common and accepted arrangement, provided the luminaire is close enough and positioned to light the sign evenly when the normal lighting has failed.

Photoluminescent signs

Photoluminescent signs are made with a pigment that absorbs light and releases it slowly as a green-yellow glow. They need no supply, no battery and no wiring, which makes them inexpensive and simple to fix.

Their limitations follow from how they work. They only perform if they have been charged by enough ambient light of a suitable kind beforehand, so a sign in a dim corridor or a store room that is usually dark may have little stored energy when it is needed. The glow is far less bright than an illuminated sign, it fades steadily after the lights go out, and it does not light the route itself. Smoke reduces its visibility further.

For those reasons, photoluminescent signs are generally treated as a supplement to emergency lighting, or as an option for small, simple, low-risk premises where the fire risk assessment supports it. They are also widely used for low-level way-guidance markings on stairs and along escape routes, where they add to the illuminated signs above.

Want a fixed written quote? Call 01235 430442 or send us the details.

Side-by-side comparison

Illuminated and photoluminescent exit signs compared
IlluminatedPhotoluminescent
PowerMains with battery backupNone; charged by ambient light
Brightness in a failureConsistent for the rated durationLow, and fading over time
Depends onCharged battery and working lampAdequate light exposure beforehand
InstallationElectrical work by an electricianFixed to the wall or door frame
Ongoing checksMonthly function test and annual duration testVisual checks for condition, cleanliness and charging light
Typical useMost workplaces and all public premisesSupplementary guidance; small low-risk premises if assessed as adequate

Size and viewing distance

A sign is only useful if it can be read from where a person is standing. The standards relate the height of the sign's graphic to a maximum viewing distance. As a general rule from the emergency lighting standards, an internally illuminated sign can be relied on at up to 200 times its height, and an externally illuminated sign at up to 100 times its height. A corridor or open floor that exceeds the viewing distance needs a larger sign or additional signs.

Signs should be mounted above doors and along routes where they can be seen over furniture and racking, and at each change of direction, so that the next sign is always in view.

Installation and testing

Illuminated exit signs are part of the emergency lighting installation. They are wired so that they respond to a failure of the local lighting circuit, and they are included in the routine test regime: a brief function test each month and a full-duration test each year, with results recorded in a log. See emergency lighting testing for the schedule.

The electrical installation must comply with BS 7671 and be carried out and certified by a qualified electrician; it is not work for site staff to undertake. The Part P notification rules apply to dwellings, so they do not normally arise in commercial premises, but certification of the work is still required. We install and maintain signs and luminaires through our emergency lighting service.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

They can be used, and they are common as supplementary signage. Whether they are sufficient on their own in a particular location depends on the fire risk assessment. Many premises need illuminated signs or signs lit by emergency luminaires.

Not always. Maintained signs are lit continuously and are expected in places used by the public. Non-maintained signs light only when the supply fails. The risk assessment and the type of premises decide which is appropriate.

Emergency lighting in most UK premises is specified for a three-hour duration. Shorter durations are accepted only in limited circumstances, so three hours is the usual choice.

Large enough to be seen from the furthest point it serves. As a rule, the maximum viewing distance is 200 times the sign height for internally illuminated signs and 100 times for externally illuminated ones.

They are connected to the fixed wiring and form part of the emergency lighting system, so they should be installed, tested and certified by a qualified electrician.

Related pages

CallQuote