Electrics when leasing commercial premises: what to check first

A commercial lease can make the tenant responsible for an electrical installation they did not install and have never seen tested. Finding out its condition before signing is far cheaper than discovering it afterwards.

Last updated

Short answer

Before taking a lease on a shop, office or industrial unit, ask for the current Electrical Installation Condition Report and evidence that any remedial items were completed, establish the size and type of the electricity supply, check how the unit is metered, and look at the distribution board, lighting and emergency lighting records. Read what the lease says about repair, alterations and reinstatement. Once you are the employer in occupation, the Electricity at Work Regulations 1989 make you responsible for the safety of the system. Part P does not apply to commercial premises, but inspections and alterations to BS 7671 need a qualified electrician.

Ask for the condition report

An Electrical Installation Condition Report records the state of the fixed wiring at the date of inspection, classifies it as satisfactory or unsatisfactory, and recommends when the next inspection is due. Ask the landlord or agent for the most recent one. Check the date, the overall outcome, the extent of the installation it covered and any limitations, and whether observations requiring action were followed by a certificate or written confirmation that the work was done.

If there is no report, or it is out of date, consider commissioning one as part of your due diligence, with the landlord's agreement for access. Our commercial EICR page explains what is involved, and our guide to commercial EICR cost sets out what affects the price.

Supply size and type

The supply determines what you can run. Find out whether the unit has a single-phase or three-phase supply and its rated capacity. A unit that worked for a previous tenant's stock room may not support a commercial kitchen, a workshop full of machinery or a row of vehicle chargers.

If your business needs more, an upgrade has to be requested from the distribution network operator, with the landlord's consent, and it carries cost and lead time that are best known before lease terms are agreed. Our guide to the electrical needs of offices and small warehouses helps estimate what a business is likely to require.

Metering and who pays

Units are metered in different ways. Some have their own supply and meter, and the tenant contracts with a supplier directly. Others are fed from the landlord's supply through a sub-meter and recharged. Establish which applies, where the meter is, whether you have access to it, and whether any landlord's services, such as external lighting or shared corridors, run through your meter. Ask for the meter reference so that suppliers can quote before you move in.

What to look at on a viewing

  • Distribution board: its age, whether circuits are labelled, and whether there are spare ways.
  • Sockets and data outlets: enough of them, in useful positions, undamaged.
  • Lighting: type, condition and whether it suits your use or will need replacing.
  • Emergency lighting: fittings present on escape routes, and a logbook with recent test entries.
  • Signs of amateur alterations: surface cables, joints in tape, extension leads used as fixed wiring.
  • Anything left by the previous tenant: redundant cables, equipment supplies, signage wiring.
  • External areas: lighting, sockets and supplies to gates or shutters.

A viewing shows only the surface. It is no substitute for inspection and testing, but it tells you what questions to ask.

Want a fixed written quote? Call 01235 430442 or send us the details.

What the lease says

Many commercial leases place the duty to repair and maintain the premises, including the electrical installation, on the tenant. Some require the tenant to have the installation periodically inspected and to supply the reports. Have your solicitor confirm what applies, and consider whether a record of the installation's condition at the start of the lease is needed to limit your liability for defects that were already present.

Alterations usually need the landlord's written consent. That can include new circuits, changes to lighting, data cabling and anything fixed to the structure. Leases commonly require the tenant to reinstate the premises at the end of the term, so keep records of what was there and what you changed. This guide is general information, not legal advice.

Your duties once in occupation

As the employer or person in control of the premises, you have duties under the Electricity at Work Regulations 1989 to keep the electrical system safe and to make sure work on it is done by competent people. In practice that means periodic inspection and testing at the recommended interval, prompt repair of defects, maintenance of emergency lighting, and attention to portable equipment according to risk. Our guide to planned electrical maintenance sets out a proportionate schedule.

Planning the fit-out

If you intend to alter the unit, involve an electrician before the lease is finalised. They can tell you whether the existing board and circuits can be reused, what your layout needs in the way of power, lighting and data, and whether the supply is adequate, so that the cost is known and consent for the works can be dealt with alongside the lease. All new work is designed, tested and certified to BS 7671, and the certificates are kept with the lease documents. See commercial electrical work for the services we provide.

At the end of the lease

When you leave, the landlord may require alterations to be removed, the installation left in a safe condition and an up-to-date condition report provided. Redundant circuits should be properly disconnected and removed, not simply cut back. Keeping the electrical records together through the term makes this straightforward.

Want a fixed written quote? Call 01235 430442 or send us the details.

Frequently asked questions

There is no single rule requiring it at the start of every commercial lease, but it is reasonable to ask, and many landlords hold one. If none exists, consider having an inspection carried out before you commit.

It depends on the lease. Many place repair and maintenance of the unit, including its electrical installation, on the tenant. Your solicitor can confirm.

An electrician can identify it on site, and the landlord or distribution network operator can confirm the rated capacity.

Usually yes. Most leases require the landlord's written consent for alterations to the installation.

No. Part P covers dwellings. Commercial premises fall under the Electricity at Work Regulations 1989, with work carried out to BS 7671.