How smoke alarms are installed: battery, mains-wired and interlinked systems
Installing a smoke alarm can mean two very different things. Fixing a battery alarm to a ceiling is a household task. Installing mains-wired, interlinked alarms is electrical installation work with its own standard. This guide explains both, so you can tell which applies to your home.
Last updated
Short answer
Battery smoke alarms are fixed to the ceiling by the householder, following the maker's positioning instructions. Mains-wired alarms are connected to the fixed wiring, have a backup battery and are interlinked so that all sound together; they are installed by a qualified electrician to BS 7671 and the guidance in BS 5839-6. In domestic terms, a fire alarm system usually means this set of interlinked smoke and heat alarms.
The types of system
The British Standard for fire detection in homes, BS 5839-6, describes systems by grade and by category. The grade is about the equipment and how it is powered. The category is about how much of the home is covered.
- Grade F: battery-powered alarms, with either replaceable or sealed long-life batteries.
- Grade D: mains-powered alarms with a backup battery, which may be sealed for life or replaceable.
- Category LD3: alarms in escape routes only, such as the hall and landing.
- Category LD2: escape routes plus rooms that present a higher risk, such as the kitchen and main living room.
- Category LD1: alarms throughout the home.
Which combination applies depends on the property and its use. Our guides to smoke and heat alarm types and smoke alarm regulations explain the choices and the legal minimums.
Where alarms are positioned
Position matters as much as the product. Smoke rises and spreads across the ceiling, so alarms are mounted on the ceiling, as centrally as practical and at least 300 mm from walls and from light fittings. On a sloping ceiling the alarm is placed near, but not at, the highest point.
There should be an alarm on every storey, in the circulation space: the hall downstairs, the landing upstairs. Kitchens get a heat alarm instead of a smoke alarm, because cooking fumes cause false alarms. Bathrooms are avoided, as steam does the same. Alarms should not be placed directly beside extractor fans, heaters or air vents, where air movement can keep smoke away from the sensor.
Installing battery alarms
A battery alarm comes with a mounting plate that is screwed to the ceiling, and the alarm then twists or clips on to it. Fix it to something solid; plasterboard needs suitable fixings. Before drilling, bear in mind that cables to light fittings run above ceilings, usually along and across joists towards the fitting.
Radio-interlinked battery alarms are paired with each other following the manufacturer's procedure, so that all of them sound when one detects smoke. After fitting, test every alarm with its button and confirm that the others respond.
Battery alarms are a real improvement on no alarms, and for many existing owner-occupied homes they are a legitimate choice. They are not accepted where regulations call for mains-powered alarms.
How mains-wired alarms are installed
Mains alarms are connected permanently to the electrical installation. There are two accepted ways to supply them: from a dedicated circuit at the consumer unit, or from a regularly used local lighting circuit. The lighting-circuit method has the advantage that a loss of supply is quickly noticed, because the lights stop working too.
From the supply point, cable runs to the first alarm and then on to each of the others. Where alarms are interlinked by wire, a cable with an additional core carries the signal between them, so that any alarm can trigger all the rest. All the alarms on a wired interlink must be on the same circuit. Each alarm sits on a base plate that contains the terminals, and the alarm head slides on to it.
This is work on the fixed wiring: selecting the circuit, running cable through ceiling voids and lofts, making connections and testing. A new circuit for alarms is notifiable under Part P of the Building Regulations. It should be installed and certified by a qualified electrician, and it is not a job to attempt yourself.
Want a fixed written quote? Call 01235 430442 or send us the details.
Wired or radio interlinking
In a new build or a house being rewired, running an interlink cable is easy because ceilings and floors are open. In a finished home, getting a cable from the hall ceiling to the landing ceiling and on to the kitchen can mean lifting floors and disturbing decoration.
Radio interlinking avoids that. Each mains alarm is powered from the nearest suitable lighting circuit and the alarms communicate wirelessly. Hybrid arrangements are also common, with some alarms linked by cable and others joined in by radio. The alarms need to be from a compatible range, so mixing manufacturers is generally not possible.
When mains-wired alarms are required
Building Regulations require mains-powered, interlinked alarms with backup in new homes, and in many cases where a home is extended or a loft is converted. Rented homes have their own rules on where alarms must be provided, and some landlords choose mains-wired systems for reliability even where battery alarms would meet the minimum. A house in multiple occupation may need a more extensive system, guided by a fire risk assessment.
Fire alarm systems for commercial premises, with a control panel, call points and sounders, are a separate discipline with their own standard and are outside the scope of this guide.
Testing and handover
When a mains system is installed, the electrician tests the circuit to BS 7671, checks that every alarm sounds and that the interlink works from each one, and issues the appropriate electrical certificate. You should be shown the test and silence functions and told the replace-by date of the alarms.
After that, upkeep is simple: press the test button regularly, keep the alarms free of dust and change any replaceable backup batteries as described in our guide to changing smoke alarm batteries. To have alarms fitted or upgraded, see our smoke alarm installation service.
Want a fixed written quote? Call 01235 430442 or send us the details.
