How often should you replace a smoke alarm?
A smoke alarm that sounds when you press the test button seems to be working. The button, though, mostly proves that the sounder and the power supply are fine. It says less about the sensor, and the sensor is the part that wears out.
Last updated
Short answer
Smoke and heat alarms should be replaced at least every ten years, or sooner if the manufacturer's replace-by date has passed or the alarm shows signs of failing. This applies to battery and mains-wired alarms alike. Battery-only alarms can be replaced by the householder. Replacing mains-wired alarms involves the fixed wiring, unless a compatible head simply fits the existing base, and should be done by a qualified electrician.
Why alarms have a limited life
Inside a smoke alarm is a sensing chamber. In an optical alarm, a light source and a detector watch for smoke particles scattering the beam. Over years, dust and airborne contamination settle in the chamber and the electronic components drift. The alarm may become less sensitive, so it reacts late, or over-sensitive, so it sounds for no reason.
Heat alarms and carbon monoxide alarms age in their own ways. Manufacturers test their products for a stated service life and cannot vouch for performance beyond it. The recommendation to replace at ten years reflects that, and it is repeated in the guidance of BS 5839-6, the standard for fire detection in homes.
How to find the replace-by date
Most alarms carry a label on the side or on the back with either a date of manufacture or a replace-by date. On some it is visible from below; on others the alarm has to be twisted off its base to read it. Where only a manufacturing date is shown, count ten years from it unless the instructions give a different life.
If there is no date at all, or the plastic has yellowed with age, assume the alarm is overdue. When you fit new alarms, write the installation date on the edge with a permanent marker so the next check is easy.
Sealed long-life battery alarms are designed so that the battery and the sensor reach the end of their lives together. When the low-battery signal begins on one of these, the whole unit is finished.
Signs an alarm should be replaced early
- It chirps even with a new battery of the correct type.
- It gives false alarms with no smoke, steam or cooking fumes present, and cleaning does not help.
- It does not sound, or sounds weakly, when the test button is held.
- It no longer triggers the other alarms in an interlinked system, or is not triggered by them.
- The casing is damaged, painted over or badly discoloured.
- It has been exposed to a fire, heavy smoke or building dust.
Our guide to a smoke alarm beeping explains how to tell a battery warning from a fault signal.
Replacing battery alarms
A battery-only alarm is straightforward to replace. Remove the old unit and its mounting plate, fix the new plate, fit the alarm and test it. The new alarm should be sited where the instructions recommend, which may not be exactly where the old one was.
Replacement is a good moment to review what you have. A single alarm on the landing may have been normal when it was fitted, but current guidance favours an alarm on every storey, a heat alarm in the kitchen and interlinking between them. Our guide to smoke and heat alarm types explains the options.
Want a fixed written quote? Call 01235 430442 or send us the details.
Replacing mains-wired alarms
Mains alarms age in the same way as battery ones, and the ten-year rule applies to them too. It is common to find wired alarms that are fifteen or twenty years old because nobody realised they had a life.
Some manufacturers keep the same base across generations, so a new head slides on to the existing base plate with no wiring disturbed, and the instructions describe this as a user task with the circuit switched off. Where the base is different, discontinued or from another maker, the base has to be disconnected and a new one wired in. That is work on the fixed installation. It should be carried out by a qualified electrician working to BS 7671, who will check the supply and the interlink and test the alarms afterwards.
Because alarms from different ranges usually cannot be interlinked with each other, it is normally best to replace all the alarms on a system together. Replacing them on the existing circuit is not usually notifiable under Part P of the Building Regulations; adding a new circuit for alarms is.
Landlords and rented homes
Landlords in England are required to provide working smoke alarms on each storey used as living accommodation, to check them at the start of each tenancy and to repair or replace them when told of a fault. An alarm past its replace-by date is difficult to describe as being in proper working order, so recording alarm dates alongside other safety checks is good practice. See smoke alarm regulations for the detail.
Disposing of old alarms and next steps
Old alarms are electrical waste and should go to a household recycling centre or a retailer's take-back scheme, not into general rubbish. Remove replaceable batteries and recycle them separately.
If your alarms are mains-wired and due for renewal, or you want to move from battery alarms to an interlinked mains system, our smoke alarm installation service covers both.
Want a fixed written quote? Call 01235 430442 or send us the details.
